BIM技術(shù)下IPD協(xié)同管理應(yīng)用探究
[Abstract]:The traditional project procurement mode has low efficiency and high cost, which can not meet the requirements of the construction industry to maximize the value of construction projects. IPD model is an effective model for the sustainable development of the industry. Based on the introduction of IPD mode, the differences between IPD mode and traditional purchasing mode are compared. The application of BIM technology in each phase file and model of IPD project is analyzed, and the key execution points are pointed out. It lays a foundation for the realization of IPD cooperative management under BIM technology, realizes high efficiency information exchange and resource utilization, and promotes the rapid development of Chinese construction industry.
【作者單位】: 東北財(cái)經(jīng)大學(xué)投資工程管理學(xué)院;東北財(cái)經(jīng)大學(xué)研究生院;
【分類號(hào)】:TU71;TU17
【參考文獻(xiàn)】
相關(guān)期刊論文 前1條
1 郭俊禮;滕佳穎;吳賢國(guó);曹靖;晏yN;;基于BIM的IPD建設(shè)項(xiàng)目協(xié)同管理方法研究[J];施工技術(shù);2012年22期
【共引文獻(xiàn)】
相關(guān)期刊論文 前4條
1 董政民;;BIM技術(shù)在航站樓運(yùn)維管理中的應(yīng)用——以浦東國(guó)際機(jī)場(chǎng)T1航站樓為例[J];建筑經(jīng)濟(jì);2013年09期
2 祝連波;田云峰;;我國(guó)建筑業(yè)BIM研究文獻(xiàn)綜述[J];建筑設(shè)計(jì)管理;2014年02期
3 李明洋;譚大璐;張軒銘;;基于IPD管理模式的既有建筑節(jié)能改造集成化設(shè)計(jì)研究[J];建筑設(shè)計(jì)管理;2014年03期
4 姬中凱;黃奕輝;金成;;隱性成本控制目標(biāo)下的工程項(xiàng)目IPD協(xié)作模式[J];建筑經(jīng)濟(jì);2014年07期
相關(guān)碩士學(xué)位論文 前5條
1 尹航;基于BIM的建筑工程設(shè)計(jì)管理初步研究[D];重慶大學(xué);2013年
2 婁曉東;IPD及BIM技術(shù)在綜合體建設(shè)中的應(yīng)用研究[D];浙江大學(xué);2013年
3 李鵬;基于BIM的IPD采購(gòu)模式研究[D];東北財(cái)經(jīng)大學(xué);2013年
4 壽文池;BIM環(huán)境下的工程項(xiàng)目管理協(xié)同機(jī)制研究[D];重慶大學(xué);2014年
5 姬中凱;建筑工程項(xiàng)目隱性成本影響因素及評(píng)價(jià)模型研究[D];華僑大學(xué);2014年
【二級(jí)參考文獻(xiàn)】
相關(guān)期刊論文 前2條
1 馬智亮;馬健坤;;IPD與BIM技術(shù)在其中的應(yīng)用[J];土木建筑工程信息技術(shù);2011年04期
2 張連營(yíng);趙旭;;工程項(xiàng)目IPD模式及其應(yīng)用障礙[J];項(xiàng)目管理技術(shù);2011年01期
相關(guān)碩士學(xué)位論文 前1條
1 王s,
本文編號(hào):2392774
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2392774.html