村鎮(zhèn)公共服務(wù)設(shè)施配置研究
[Abstract]:The allocation of public service facilities in villages and towns is a key issue related to the implementation effect of new rural planning in China. Can public service facilities in villages and towns cover all the residents of villages and towns, and whether the scale of facilities can meet the needs of the residents of villages and towns in pursuit of quality of life? It has become a problem to be considered when promoting the construction process of new countryside. Due to the existence of the dual structure system of urban and rural areas in China, the corresponding allocation indexes and norms are mainly used in cities, and the national and local governments lack the standards and norms for the allocation of public service facilities in villages and towns, especially in rural areas. Deeply and pragmatically studying the theory and technology of the allocation of public service facilities in villages and towns has become a key task in speeding up the overall planning of urban and rural areas, and is also an important way to improve the level of construction of new rural areas in China. At present, the policy of supporting the public service facilities in villages and towns in our country is not strong enough, the funds are poor, the equipment is backward, and so on. Especially, the public service facilities of education, medical and health still can not meet the increasing living and production needs of the residents in villages and towns. The guarantee is not enough, and lacks a set of scientific and reasonable, systematic, comprehensive, and forward-looking research on the allocation of public service facilities in villages and towns. In view of the above problems, this paper studies the present situation of public service facilities in villages and towns, sums up the problems existing in the allocation of public service facilities in villages and towns in China, and analyses the problems existing in the allocation of public service facilities in villages and towns, and analyzes the improvement of the economic level of villages and towns. The change of village residents' demand for public service facilities, the definition of the related concepts and boundaries of the study on the allocation of village public service facilities, and the analysis of the allocation process of the village and town public service facilities studied in this paper. Based on the characteristics of the allocation of villages and towns and public service facilities in our country, this paper discusses the layout and design of public service facilities. The selection of public service facilities allocation project and the determination of allocation scale systematize the process of public service facilities allocation in villages and towns in China. The gradual coverage model is used to solve the problem of village and town layout design, and the frame model of configuration project selection is constructed, which provides the basis for the process of project selection. In order to evaluate the operational effect of the configuration model proposed in this paper, the article constructs the evaluation model of the allocation benefit of village and town public service facilities, and carries on the empirical analysis, carries on the practical application to the configuration model proposed by the article.
【學位授予單位】:哈爾濱工業(yè)大學
【學位級別】:碩士
【學位授予年份】:2014
【分類號】:TU982.29
【參考文獻】
相關(guān)期刊論文 前10條
1 方雪;沈山;林立偉;;農(nóng)村社區(qū)公共服務(wù)設(shè)施配置探討——以江蘇省邳州市港上鎮(zhèn)前湖村為例[J];安徽行政學院學報;2010年02期
2 馬志和,馬志強,戴健,張林;“中心地理論”與城市體育設(shè)施的空間布局研究[J];北京體育大學學報;2004年04期
3 趙民,林華;居住區(qū)公共服務(wù)設(shè)施配建指標體系研究[J];城市規(guī)劃;2002年12期
4 胡畔;謝暉;王興平;;鄉(xiāng)村基本公共服務(wù)設(shè)施均等化內(nèi)涵與方法——以南京市江寧區(qū)江寧街道為例[J];城市規(guī)劃;2010年07期
5 宋小冬;呂迪;;村莊布點規(guī)劃方法探討[J];城市規(guī)劃學刊;2010年05期
6 宋正娜;陳雯;袁豐;王麗;;公共設(shè)施區(qū)位理論及其相關(guān)研究述評[J];地理科學進展;2010年12期
7 許可;;MEXCLP模型在優(yōu)化公共設(shè)施選擇問題上的研究[J];硅谷;2011年08期
8 何劍楓 ,高志強 ,胡韶軍;居住區(qū)配套設(shè)施問題淺析[J];北京規(guī)劃建設(shè);2005年04期
9 崔敏;蔣偉;;均等化視角下的農(nóng)村基本公共服務(wù)設(shè)施布局研究——以河南省鎮(zhèn)平縣農(nóng)村為例[J];規(guī)劃師;2011年11期
10 胡丹丹;楊超;劉智偉;;帶有響應(yīng)時間承諾的選址-分配問題研究[J];管理科學;2010年01期
本文編號:2256982
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2256982.html