水泥攪拌樁在天津港南疆港區(qū)復(fù)合地基加固工程中的應(yīng)用研究
[Abstract]:In recent years, with the development and opening of Binhai New area, Tianjin Port ushered in a rare historical opportunity, and the port entered the period of large-scale construction. As the newly added land in this area is mostly filled with a large amount of sea silt abandoned by port construction and dredged waterway, the reinforcement and treatment of this artificial draught soft soil foundation has become an inevitable technical problem. On the basis of analyzing and commenting on the theory and practice of cement mixing pile composite foundation treatment at home and abroad, combined with the engineering example of No. 26 wharf in Nanjiang Port of Tianjin Port, this paper mainly deals with the regional soil quality characteristics and the whole reinforcement process of filled soil foundation. The reinforcement mechanism of cement-soil mixing method and the process of pile test are introduced briefly in this paper, which includes different pile arrangement schemes, different pile diameters, mixing process, cement mixing piles and cement mixing piles. Some useful conclusions are obtained. Through the application research of cement mixing pile in the composite foundation of Nanjiang Port of Tianjin Port, the applicability of adopting the scheme of plum-blossom pile and two-axis unidirectional cement mixing pile in this area is verified, and the cement mixing construction technology is summarized and improved. Due to the high mature effect of this technology, the cost is reduced on the premise of meeting the requirement of construction period. Through the experimental analysis, it is concluded that the quality of the upper pile body is better than that of the lower pile body in the whole construction of the cement mixing pile in this site. In order to make the site easy to operate, the test standard is optimized, the design length of pile is optimized to 16m by analyzing the numerical model, and the construction cost is greatly saved, which provides a reference for the construction of cement mixing pile of the same type foundation.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:TU753.3
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 孫志江;天津港南疆港區(qū)開發(fā)建設(shè)啟示[J];港口科技動態(tài);2000年07期
2 ;地源海水源熱泵在天津港建筑中的應(yīng)用[J];上海節(jié)能;2010年10期
3 傅瑞清,朱平,楊錦賢;天津南疆港區(qū)工程地質(zhì)層劃分及評價(jià)[J];港工技術(shù);1997年04期
4 陳曉明;天津港南疆港區(qū)開發(fā)與散貨物流和產(chǎn)業(yè)布局[J];港工技術(shù);1997年01期
5 楊樹森;天津港南疆港區(qū)合理造陸規(guī)模的確定[J];港工技術(shù);2001年S1期
6 楊樹森;天津港南疆港區(qū)合理造陸規(guī)模的確定[J];水運(yùn)工程;2002年05期
7 ;規(guī)劃、勘測與設(shè)計(jì)[J];水路運(yùn)輸文摘;1995年11期
8 張國權(quán);劉新勇;楊興晏;;天津港南疆港區(qū)浮式LNG碼頭的設(shè)計(jì)要點(diǎn)[J];港工技術(shù);2013年01期
9 王秀亮;董志坤;;水泥攪拌樁復(fù)合地基在天津港南疆港區(qū)工程中的應(yīng)用[J];港工技術(shù);2007年01期
10 ;水消簡訊[J];水上消防;2010年03期
相關(guān)重要報(bào)紙文章 前10條
1 記者 趙賢鈺;南疆港區(qū)南部建設(shè)啟動[N];濱海時(shí)報(bào);2010年
2 李夏;天津港北疆結(jié)束運(yùn)煤史[N];天津日報(bào);2006年
3 蔡立軍;天津港南疆港區(qū)正式開始接卸鐵礦石貨類[N];中國冶金報(bào);2003年
4 陳杰 楊q
本文編號:2208393
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2208393.html