瀘州港項(xiàng)目施工進(jìn)度控制動(dòng)態(tài)管理研究
[Abstract]:Our country is in the most concentrated infrastructure, the fastest speed of urbanization period, the scale of engineering construction ranks first in the world. Improving the dynamic management level of project construction schedule control will bring great economic benefits and at the same time strictly control the quality of the wharf and improve the efficiency of the whole construction process to a certain extent. Whether the dynamic management mode of construction schedule control of Luzhou Port project is successful or not is directly reflected in the three elements of quality, cost and schedule in engineering construction. This paper makes a comparative study on the dynamic management mode of construction schedule control in Luzhou Port from the three dimensions of quality, cost and schedule, and analyzes the influence of different dynamic management modes on the construction process. In the course of the research, through literature review and expert interview, the author qualitatively analyzed the dynamic management mode of project construction schedule control used both at home and abroad. This paper also analyzes the factors that influence the dynamic management mode selection of the construction schedule control of Luzhou Port Project based on the 4M1E method. In order to achieve the objective conditions necessary for the implementation of the foreign advanced project construction schedule control dynamic management mode in Luzhou Port project. Finally, the dynamic management mode of Luzhou Port project construction schedule control is obtained under the current conditions. The analysis and comparison of the dynamic management mode of construction schedule control at home and abroad will help to improve the dynamic management mode of domestic project construction schedule control. There are still many obstacles and problems in the development of the dynamic management mode of construction schedule control in Luzhou Port Project. In the future, it needs to be further promoted and applied in the fields of information management, labor integration, the perfection of contracts, and so on. Only in this way can the whole domestic construction enterprises gradually move towards standardization and internationalization. The innovation of this paper is to focus on the dynamic management mode of project construction schedule control. Based on the comparative analysis of the quality, cost and schedule management of the Luzhou Port project, the factors influencing the dynamic management mode selection of the project construction schedule control are theoretically analyzed based on the 4M1E method. Through the discussion of this paper, it is possible to make the practitioners of dynamic management of construction schedule control of Luzhou Port realize the importance and necessity of studying the dynamic management mode of project construction schedule control. This paper also introduces the influence of construction technology and labor quality on the dynamic management mode of project construction schedule control, and makes a case study. The research shows that the time limit can be shortened effectively by improving it to a certain extent.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU722
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李金鋒;;探析如何保障建設(shè)工程施工進(jìn)度控制[J];中小企業(yè)管理與科技(下旬刊);2010年08期
2 阮敏飚;;談如何保障建設(shè)工程施工進(jìn)度控制[J];價(jià)值工程;2010年22期
3 王志堅(jiān);王中明;;淺析工程項(xiàng)目施工進(jìn)度控制[J];黑龍江科技信息;2011年01期
4 雷軍;楊歡民;;工程施工進(jìn)度控制淺析[J];河南水利與南水北調(diào);2011年14期
5 郭慶豐;;對(duì)做好建筑工程施工進(jìn)度控制的探討[J];河北企業(yè);2013年10期
6 黃正東;;建筑施工進(jìn)度控制探析[J];河南建材;2013年06期
7 朱生;;關(guān)于建筑工程之中施工進(jìn)度控制的探究[J];科技資訊;2013年35期
8 郭小平,黃小斌;淺析現(xiàn)代工程項(xiàng)目施工進(jìn)度控制[J];當(dāng)代建設(shè);2003年04期
9 劉肇生,李滿瑞,楊倩;綜合樓工程的施工進(jìn)度控制解析[J];北京建筑工程學(xué)院學(xué)報(bào);2005年02期
10 王東勝,楊佃忠;工程項(xiàng)目的施工進(jìn)度控制[J];煤礦現(xiàn)代化;2005年04期
相關(guān)會(huì)議論文 前2條
1 魯順偉;孫翠萍;;馬關(guān)拉氣水電站工程施工進(jìn)度控制與管理[A];2009年云南電力技術(shù)論壇論文集(文摘部分)[C];2009年
2 張思源;崔振豹;李輝;;淺談工程項(xiàng)目的施工進(jìn)度控制[A];土木建筑學(xué)術(shù)文庫(第8卷)[C];2007年
相關(guān)重要報(bào)紙文章 前3條
1 中國(guó)新興建設(shè)開發(fā)總公司三公司 張宏;淺談工程施工進(jìn)度控制對(duì)項(xiàng)目經(jīng)濟(jì)效益的影響[N];中華建筑報(bào);2012年
2 通訊員 尚念圣 劉金棟;市公路局打響重點(diǎn)工程建設(shè)百日攻堅(jiān)戰(zhàn)[N];萊蕪日?qǐng)?bào);2009年
3 記者 穆廣田 通訊員 馬永良;“項(xiàng)目法”樹立管理新形象[N];中國(guó)石油報(bào);2003年
相關(guān)碩士學(xué)位論文 前8條
1 岳大云;AP1000核電項(xiàng)目施工進(jìn)度控制研究[D];大連海事大學(xué);2015年
2 黃身望;樓盤住宅精裝修施工進(jìn)度控制系統(tǒng)研究與開發(fā)[D];浙江大學(xué);2015年
3 李應(yīng)祥;瀘州港項(xiàng)目施工進(jìn)度控制動(dòng)態(tài)管理研究[D];電子科技大學(xué);2014年
4 王偉夫;青島市大村河工程施工進(jìn)度控制研究[D];中國(guó)海洋大學(xué);2008年
5 李季;建設(shè)工程施工進(jìn)度控制研究[D];中國(guó)海洋大學(xué);2008年
6 趙中光;華夏麒麟工程項(xiàng)目施工進(jìn)度控制研究[D];華南理工大學(xué);2012年
7 杜云峰;長(zhǎng)春國(guó)際廣場(chǎng)工程項(xiàng)目施工進(jìn)度控制研究[D];吉林大學(xué);2015年
8 王雪艷;多項(xiàng)目并行施工進(jìn)度控制與協(xié)調(diào)研究[D];西安建筑科技大學(xué);2011年
,本文編號(hào):2179794
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2179794.html