涂山路改造龍門浩小學(xué)段邊坡治理及穩(wěn)定性監(jiān)測分析
本文選題:基坑開挖 + 鄰近建筑物; 參考:《重慶交通大學(xué)》2014年碩士論文
【摘要】:隨著我國的經(jīng)濟(jì)發(fā)展和城市化建設(shè)的加快,城市道路交通設(shè)施作為城市重要的基礎(chǔ)設(shè)施,在城市經(jīng)濟(jì)和社會(huì)發(fā)展中具有基礎(chǔ)性、先導(dǎo)性作用。發(fā)展城市公共交通,是建設(shè)節(jié)約型社會(huì)、改善城市人居環(huán)境、促進(jìn)城市可持續(xù)發(fā)展的必要要求,然而目前在建或規(guī)劃的地鐵線均穿過市中心繁華地區(qū),這些地區(qū)已經(jīng)建成各類高架橋、人行天橋、高層建筑、地下管線和既有建筑物。新建的地鐵不可避免地要從既有的橋梁、道路、建筑、山體穿過。不論采用淺埋暗挖法還是盾構(gòu)法基坑開挖施工,施工作業(yè)必將對(duì)鄰近既有建筑物和構(gòu)筑物的穩(wěn)定性產(chǎn)生影響。因此,如何在軌道交通建設(shè)中保證既有的橋梁、建筑、管線等的安全,降低它們受鄰近地鐵基坑開挖施工影響的風(fēng)險(xiǎn)是十分重要的課題,急待解決。然而軌道交通的基坑施工開挖過程對(duì)鄰近坡上建筑的穩(wěn)定性影響是常見現(xiàn)象。在基坑、邊坡開挖前沒有充分分析的情況下盲目開挖,極易造成附近建筑物與地下結(jié)構(gòu)的變形及破壞。從目前的相關(guān)規(guī)范中未就基坑開挖對(duì)鄰近坡上建筑物的建筑物穩(wěn)定影響方面做明確規(guī)定;A(chǔ)相關(guān)規(guī)范中僅提到位于穩(wěn)定土坡坡頂上的條形和矩形基礎(chǔ)建筑,規(guī)定了建筑基礎(chǔ)邊緣至坡頂?shù)乃骄嚯x,對(duì)于其它類型邊坡和基礎(chǔ)類型的建筑未做說明,且對(duì)基坑開挖-坡體-建筑的研究較少。三者共同耦合作用下建筑物基礎(chǔ)的穩(wěn)定性有待進(jìn)一步研究。本文以重慶東水門大橋南_立交工程-涂山路改造工程對(duì)鄰近龍門浩小學(xué)穩(wěn)定性影響為工程背景,采用實(shí)地調(diào)研、理論分析與實(shí)際監(jiān)測對(duì)龍門浩小學(xué)邊坡穩(wěn)定性進(jìn)行對(duì)比分析。研究工作及得出的主要結(jié)論如下:1.通過調(diào)研分析,邊坡開挖段所在的龍門浩小學(xué)為框架結(jié)構(gòu),建筑內(nèi)側(cè)基礎(chǔ)采用條形基礎(chǔ),外側(cè)基礎(chǔ)采用樁基礎(chǔ),且持力層為基巖;2.通過對(duì)該段邊坡強(qiáng)風(fēng)化層和中等風(fēng)化層的穩(wěn)定性計(jì)算分析,得到直立開挖后該段邊坡屬不穩(wěn)定,為了保證坡頂教學(xué)樓安全,必須對(duì)該邊坡進(jìn)行工程治理穩(wěn)定后,才能開挖路塹邊坡;3.根據(jù)勘察結(jié)果,邊坡破壞模式為強(qiáng)風(fēng)化巖體沿強(qiáng)中風(fēng)化界面折線滑移,下滑力大,不易采用原肋板式錨桿擋墻支擋方式,并提出相應(yīng)的防治措施;4.根據(jù)地勘資料,邊坡治理范圍,設(shè)計(jì)采用錨拉樁擋墻進(jìn)行支護(hù),樁頂設(shè)置防護(hù)欄及截水溝,樁板擋墻根據(jù)下滑力和臨空高度以及嵌巖條件不同分為四種類型;5.治理后邊坡工程監(jiān)測,應(yīng)在每一典型邊坡段的支護(hù)結(jié)構(gòu)頂部應(yīng)設(shè)置不少于3個(gè)觀測點(diǎn)的觀測網(wǎng),用經(jīng)緯儀,水準(zhǔn)儀,地表位移仲長計(jì)等觀測位移量,移動(dòng)速度和方向,地表裂縫監(jiān)測范圍為坡頂40m范圍內(nèi),坡頂建(構(gòu))筑物變形與時(shí)間的關(guān)系。6.通過監(jiān)測數(shù)據(jù)分析,龍門浩小學(xué)邊坡累積最大水平位移未超過預(yù)警值,水平位移連續(xù)幾日變化速率未超過預(yù)警值,邊坡累積最大沉降未超過預(yù)警值,沉降連續(xù)幾日變化速率未超過預(yù)警值,教學(xué)樓外邊坡沉降及水平位移趨于穩(wěn)定;隧道上方(幼兒園處)邊坡沉降及水平位移趨于穩(wěn)定;隧道處深基坑頂部沉降及水平位移趨于穩(wěn)定;邊坡深部位移變化幅度很小,邊坡基本穩(wěn)定,建議繼續(xù)監(jiān)測。
[Abstract]:With the development of China's economy and the acceleration of urbanization, urban road traffic facilities, as the important infrastructure of the city, have the basic and leading role in the economic and social development of the city. The development of urban public transport is the necessary requirement for building a conservation oriented society, improving the urban environment and promoting the sustainable development of the city. At present, the subway lines are built or planned through the downtown area, and these areas have been built up of various viaducts, pedestrian overpasses, high-rise buildings, underground pipelines and existing buildings. The new subway will inevitably be worn from existing bridges, roads, buildings, and mountains. Construction and construction work will inevitably affect the stability of adjacent existing buildings and structures. Therefore, how to ensure the safety of existing bridges, buildings, pipelines and so on in the construction of rail traffic and reduce the risk of their impact on the excavation of the adjacent subway foundation pit is a very important issue, which is urgent to be solved. However, the foundation pit of rail transit is applied to the foundation pit. The influence of the excavation process on the stability of the adjacent slope buildings is a common phenomenon. In the foundation pit, the blind excavation of the slope before the excavation is not fully analyzed is easily caused by the deformation and destruction of the nearby buildings and underground structures. In the basic rules, only the bar and rectangular foundation on the top of the slope are mentioned, the horizontal distance from the edge of the building to the top of the slope is defined, and the construction of other types of slope and basic type is not explained, and the research on the foundation pit - the slope body - building is less. The three people are coupled with the building. In this paper, the stability of Longmen Hao primary school is compared and analyzed by field investigation, theoretical analysis and actual monitoring on the stability of Longmen Hao primary school slope. The following are as follows: 1. through the investigation and analysis, the Longmen Hao primary school, which is located in the slope excavation section, is a frame structure. The inner foundation of the building adopts a strip foundation, the lateral foundation adopts the pile foundation and the bearing layer is the bedrock. 2. the slope is unstable after the vertical excavation of the slope, through the calculation and analysis of the stability of the strong weathering layer and the medium weathering layer of the slope. In order to ensure the safety of the slope top teaching building, the cutting slope must be excavated after the slope is treated and stabilized. 3. according to the result of the investigation, the failure mode of the slope is the sliding of the strong weathered rock mass along the strong medium weathering interface, which is not easy to use the original rib plate type anchorage retaining wall, and the corresponding prevention measures are put forward, 4. According to the geological prospecting data and the slope control range, the anchorage pile retaining wall is used to support, the pile top is set up the protective fence and the cut ditch. The pile plate retaining wall is divided into four types according to the sliding force, the altitude of the air and the rock socketed conditions, and the 5. treatment slope engineering monitoring should be set up not less than 3 at the top of the support structure at each Canon type slope section. Observational network of observation points, using theodolite, leveling instrument, surface displacement secondary length meter and other observation displacement, moving speed and direction, surface crack monitoring range is 40m range of slope top, the relationship between deformation and time of construction (structure) on the top of slope.6. through monitoring data analysis, the maximum horizontal displacement of Longmen Hao Xiao Xue slope does not exceed the early warning value and level position. The maximum subsidence of the slope has not exceeded the early warning value for several days, and the maximum settlement of the slope has not exceeded the early-warning value. The settlement and horizontal displacement of the slope outside the teaching building tend to be stable; the slope settlement and horizontal displacement above the tunnel (kindergarten) tend to be stable; the settlement and level of the top of the deep foundation pit in the tunnel The displacement tends to be stable, the slope displacement is very small, and the slope is basically stable. It is recommended to continue monitoring.
【學(xué)位授予單位】:重慶交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU753
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 吳國祥;用于被開采地層表面建筑物的錐形基礎(chǔ)[J];煤炭技術(shù);1995年02期
2 董飛,陳安林;建筑物基礎(chǔ)部塌陷的原因及預(yù)防[J];安徽建筑;2000年03期
3 李文軍,付世祿;淺析傾斜建筑物糾偏[J];中國地質(zhì)災(zāi)害與防治學(xué)報(bào);2000年01期
4 樊良本,徐惠芳;建筑物的糾偏[J];浙江建筑;2000年S1期
5 陳利清,陳華;建筑物基礎(chǔ)土的凍害及防治[J];工程質(zhì)量;2003年09期
6 王明波;基坑工程與鄰近建筑物相互影響的分析方法[J];工業(yè)建筑;2004年08期
7 林功丁;建筑物基礎(chǔ)抗水土腐蝕的防護(hù)措施研究[J];地質(zhì)災(zāi)害與環(huán)境保護(hù);2004年04期
8 魏煥衛(wèi),孫劍平,陳啟輝,賈強(qiáng);復(fù)雜條件下鄰近建筑物的保護(hù)和基坑支護(hù)[J];施工技術(shù);2005年06期
9 任振甲;建筑物基礎(chǔ)加寬的一些作法[J];建筑工人;2005年06期
10 楊慶民;張春麗;馮東翔;;在建建筑物下廢棄窯洞處理方法的探討[J];中原工學(xué)院學(xué)報(bào);2005年06期
相關(guān)會(huì)議論文 前10條
1 王建剛;趙雷;;建筑物基礎(chǔ)下部防空洞的處理[A];第二屆全國地下、水下工程技術(shù)交流會(huì)論文集[C];2011年
2 勵(lì)慧杰;應(yīng)頌勇;;基礎(chǔ)遇防空洞的若干處理措施[A];地基處理理論與實(shí)踐——第七屆全國地基處理學(xué)術(shù)討論會(huì)論文集[C];2002年
3 曹艷梅;夏禾;;振動(dòng)對(duì)建筑物的影響及其控制標(biāo)準(zhǔn)[A];第十一屆全國結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅱ卷[C];2002年
4 衛(wèi)紅;;二期工程基坑開挖對(duì)臨近一期建筑物基礎(chǔ)的影響分析[A];中國老教授協(xié)會(huì)土木建筑(含建筑物改造與病害處理)專業(yè)委員會(huì)全國第九屆建筑物改造與病害處理學(xué)術(shù)研討會(huì)論文集[C];2011年
5 鐘思鵬;陳世照;趙大鵬;;淺析建筑物不均勻沉降的成因及防治[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2005)[C];2005年
6 陳堅(jiān);婁紅巖;;建筑物加固對(duì)相鄰工程的影響及控制措施[A];2009全國大型泵站更新改造研討暨新技術(shù)、新產(chǎn)品交流大會(huì)論文集[C];2009年
7 吳耀柱;;振沖樁施工對(duì)相鄰建筑影響因素及評(píng)價(jià)[A];中國土木工程學(xué)會(huì)土力學(xué)及基礎(chǔ)工程學(xué)會(huì)地基處理學(xué)術(shù)委員會(huì)第三屆地基處理學(xué)術(shù)討論會(huì)論文集[C];1992年
8 張惠元;;深基坑開挖中近接建筑物及管線的保護(hù)技術(shù)[A];第七屆全國工程地質(zhì)大會(huì)論文集[C];2004年
9 鄭襄勤;劉忠昌;王明恕;;建筑物基礎(chǔ)合理設(shè)計(jì)和施工[A];第十屆全國結(jié)構(gòu)工程學(xué)術(shù)會(huì)議論文集第Ⅲ卷[C];2001年
10 郝靜波;;幾種常見建筑物基礎(chǔ)接地性能分析與檢測要點(diǎn)[A];第28屆中國氣象學(xué)會(huì)年會(huì)——S13雷電物理、監(jiān)測預(yù)警和防護(hù)[C];2011年
相關(guān)重要報(bào)紙文章 前3條
1 上海華都建筑規(guī)劃設(shè)計(jì)有限公司 蔣志賢邋余琪 周振 尹仕友;關(guān)于我國教學(xué)類建筑物抗震設(shè)計(jì)的思考及建議[N];建筑時(shí)報(bào);2008年
2 本報(bào)記者 劉魁;現(xiàn)代技藝為黨的“三大”會(huì)址紀(jì)念館換新顏[N];中華建筑報(bào);2006年
3 本報(bào)記者 高延林;和睦演奏出和諧之歌[N];延安日?qǐng)?bào);2011年
相關(guān)博士學(xué)位論文 前4條
1 劉惠濤;某地鐵工程施工建筑物變形分析與控制研究[D];華中科技大學(xué);2014年
2 丁智;盾構(gòu)隧道掘進(jìn)對(duì)鄰近建筑物影響及變形預(yù)測研究[D];浙江大學(xué);2014年
3 鄭東強(qiáng);基于非概率區(qū)間集合模型的建筑物遷移工程多支點(diǎn)控制研究[D];天津大學(xué);2007年
4 余佳力;城市隧道建設(shè)對(duì)地表建筑物的影響研究[D];武漢大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 黃少師;鳳陽路站基坑開挖對(duì)周邊建筑物的影響分析[D];安徽建筑大學(xué);2015年
2 文杰;深基坑開挖對(duì)不同鄰近建筑物影響效應(yīng)對(duì)比研究[D];合肥工業(yè)大學(xué);2015年
3 武黎明;涂山路改造龍門浩小學(xué)段邊坡治理及穩(wěn)定性監(jiān)測分析[D];重慶交通大學(xué);2014年
4 劉強(qiáng);建筑物下采空區(qū)穩(wěn)定性分析及處治技術(shù)研究[D];中南大學(xué);2010年
5 楊光;基坑開挖和施工堆土對(duì)臨近建筑物影響的三維有限元模擬分析[D];鄭州大學(xué);2012年
6 楊光;莞惠城際大朗站深基坑開挖對(duì)周邊建筑物影響[D];南京林業(yè)大學(xué);2013年
7 王凱旋;隧道施工對(duì)建筑物變形影響及控制分析研究[D];北京交通大學(xué);2013年
8 王素霞;基坑開挖對(duì)臨近建筑物影響的數(shù)值分析研究[D];南京工業(yè)大學(xué);2006年
9 陳現(xiàn)偉;深基坑分層開挖支護(hù)對(duì)環(huán)境建筑物的影響[D];重慶大學(xué);2007年
10 陳旭;高速鐵路基坑鄰近建筑物的監(jiān)測及安全評(píng)價(jià)[D];長沙理工大學(xué);2010年
,本文編號(hào):2030910
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/2030910.html