天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

當(dāng)前位置:主頁 > 管理論文 > 城建管理論文 >

施工合同管理風(fēng)險(xiǎn)防范及應(yīng)用

發(fā)布時(shí)間:2018-05-01 16:00

  本文選題:合同管理 + 工程管理 ; 參考:《上海交通大學(xué)》2014年碩士論文


【摘要】:隨著房地產(chǎn)市場(chǎng)的迅猛發(fā)展及基建設(shè)施的不斷更新發(fā)展。建設(shè)工程施工活動(dòng)異;钴S,新問題也層出不窮。然而,合同體系不健全,合同管理水平低,在建筑市場(chǎng)仍然普遍存在。作為在建筑市場(chǎng)起重要作用的《建設(shè)工程施工合同示范文本》的發(fā)展已經(jīng)跟不上時(shí)代發(fā)展的步伐。通過對(duì)示范合同09版至11版的分析,作者發(fā)現(xiàn),這些版本的改進(jìn),實(shí)質(zhì)性的改進(jìn)不多,對(duì)于建設(shè)工程施工過程中遇到的很多問題都沒有涉及。而建設(shè)工程施工合同涉及面廣,標(biāo)的額大,影響范圍廣,同時(shí)建設(shè)工程施工過程中又會(huì)不斷遇到很多新問題,而相應(yīng)的解決辦法卻沒有相應(yīng)的法律依據(jù)。如:工程簽證、總分包配合與協(xié)調(diào)、樣板房制度等。因此對(duì)于新發(fā)現(xiàn)的問題及解決辦法有必要在合同中明確解決辦法。本文通過大量工程實(shí)踐,對(duì)工程施工過程常見的問題進(jìn)行分析,提出相應(yīng)的解決辦法,將這些問題上升到合同條文角度,從而給參建主體帶來約束力,避免施工過程中產(chǎn)生扯皮現(xiàn)象。在此基礎(chǔ)上作者提出了《新型建設(shè)工程施工合同示范文本》。通過在作者經(jīng)過的幾個(gè)工程項(xiàng)目的應(yīng)用與實(shí)踐,新型《新型建設(shè)工程施工合同示范文本》規(guī)避了很多合同風(fēng)險(xiǎn),為開發(fā)商和施工單位節(jié)約了成本,避免工期延誤,取得了相應(yīng)的經(jīng)濟(jì)效益和社會(huì)效益。
[Abstract]:With the rapid development of the real estate market and the continuous development of infrastructure. Construction activities are extremely active, and new problems emerge in endlessly. However, the contract system is not perfect and the level of contract management is low. As an important role in the construction market, the construction contract model text has been unable to keep pace with the development of the times. Through the analysis of the model contract from edition 09 to edition 11, the author finds that the improvement of these versions and the substantial improvement are not many, which are not involved in many problems encountered in the construction process of the construction project. The construction contract of construction project involves a wide range, the target amount is large, the scope of influence is wide, at the same time, during the construction process of the construction project, there will be a lot of new problems, but the corresponding solution does not have the corresponding legal basis. Such as: project visa, total sub-package coordination and coordination, model housing system and so on. Therefore, it is necessary to resolve the newly discovered problems and solutions in the contract. Through a large number of engineering practices, this paper analyzes the common problems in the construction process of the project, puts forward corresponding solutions, and raises these problems to the angle of the contract provisions, thus bringing binding force to the participants in the construction. Avoid the phenomenon of ripping in the construction process. On this basis, the author puts forward the model text of the new construction contract. Through the application and practice of several engineering projects passed by the author, the new model text of construction contract of new type construction project evades many contract risks, saves the cost for developers and construction units, and avoids the delay of construction period. The corresponding economic and social benefits have been obtained.
【學(xué)位授予單位】:上海交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU723.1

【參考文獻(xiàn)】

相關(guān)期刊論文 前4條

1 王建華;徐中華;;支護(hù)結(jié)構(gòu)與主體地下結(jié)構(gòu)相結(jié)合的深基坑工程研究現(xiàn)狀[J];南昌工程學(xué)院學(xué)報(bào);2007年01期

2 苗彩鳳;徐銥;;《范本》理念探討(三):適用的法律意識(shí)(上)[J];水電站設(shè)計(jì);2008年04期

3 姚利萍;;施工合同談判策略[J];施工企業(yè)管理;2008年04期

4 任亞金;;談建筑工程合同管理[J];科技創(chuàng)新導(dǎo)報(bào);2012年14期

相關(guān)碩士學(xué)位論文 前1條

1 魏文濤;建設(shè)工程合同管理與索賠研究[D];青島理工大學(xué);2011年



本文編號(hào):1830054

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/guanlilunwen/chengjian/1830054.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶58802***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com