SHC工程項(xiàng)目施工安全風(fēng)險(xiǎn)管理研究
本文選題:高層建筑施工 切入點(diǎn):風(fēng)險(xiǎn)識(shí)別 出處:《東北大學(xué)》2014年碩士論文 論文類型:學(xué)位論文
【摘要】:SHC工程項(xiàng)目是Z施工單位在上海長(zhǎng)寧區(qū)承建的第一個(gè)工程項(xiàng)目。隨著長(zhǎng)寧區(qū)飛速發(fā)展,土地資源日益緊缺,為了提高土地的利用率,高層建筑在長(zhǎng)寧轄區(qū)內(nèi)占據(jù)了主體地位,SHC工程項(xiàng)目也是其中之一。SHC工程項(xiàng)目作為長(zhǎng)寧區(qū)高層建筑的典型代表,但由于高層建筑層數(shù)多、施工量大等的特點(diǎn),在建設(shè)過(guò)程中存在的安全風(fēng)險(xiǎn)更加突出。本文借鑒和吸收國(guó)內(nèi)相關(guān)建筑施工安全管理、風(fēng)險(xiǎn)識(shí)別、風(fēng)險(xiǎn)評(píng)價(jià)的理論和方法,充分考慮高層建筑項(xiàng)目施工安全生產(chǎn)的特性和實(shí)際需求,深入分析SHC工程項(xiàng)目施工過(guò)程中的安全風(fēng)險(xiǎn)問(wèn)題。以SHC工程項(xiàng)目施工過(guò)程中的安全風(fēng)險(xiǎn)為研究對(duì)象,分析該工程項(xiàng)目施工特點(diǎn)和安全問(wèn)題,歸納施工過(guò)程中可能存在的安全事故類型,運(yùn)用事故樹分析法對(duì)SHC工程項(xiàng)目施工安全風(fēng)險(xiǎn)(危險(xiǎn)源)進(jìn)行分析識(shí)別,建立SHC施工安全風(fēng)險(xiǎn)事故樹。通過(guò)對(duì)網(wǎng)絡(luò)層次分析法以及模糊綜合評(píng)價(jià)方法的研究,建立SHC工程項(xiàng)目施工安全風(fēng)險(xiǎn)評(píng)價(jià)指標(biāo)體系,構(gòu)造施工安全風(fēng)險(xiǎn)評(píng)價(jià)模型,對(duì)于SHC工程項(xiàng)目施工安全風(fēng)險(xiǎn)進(jìn)行評(píng)價(jià)和結(jié)果分析。最后,根據(jù)SHC工程項(xiàng)目施工安全風(fēng)險(xiǎn)控制思路,提出施工安全風(fēng)險(xiǎn)應(yīng)對(duì)措施。本文的研究可以比較客觀地分析SHC工程項(xiàng)目施工過(guò)程中的風(fēng)險(xiǎn),為風(fēng)險(xiǎn)管理決策者制定風(fēng)險(xiǎn)控制策略提供依據(jù),這對(duì)Z施工單位開展類似的工程項(xiàng)目將是一個(gè)非常有價(jià)值的研究課題。
[Abstract]:The SHC project is the first project undertaken by Z construction unit in Changning District of Shanghai. With the rapid development of Changning District, land resources are increasingly scarce. In order to improve the utilization rate of land, High-rise buildings occupy the main position in Changning district. SHC project is one of them. SHC project is a typical representative of high-rise buildings in Changning district. However, because of the large number of high-rise buildings and the large amount of construction, The paper draws lessons from and absorbs the theories and methods of construction safety management, risk identification and risk evaluation in China. Considering the characteristics and practical requirements of construction safety of high-rise building projects, this paper deeply analyzes the safety risks in the construction process of SHC engineering projects. Taking the safety risks in the construction process of SHC engineering projects as the research object, This paper analyzes the construction characteristics and safety problems of the project, sums up the possible types of safety accidents in the construction process, and analyzes and identifies the construction safety risks (hazard sources) of the SHC project by means of accident tree analysis. The SHC construction safety risk accident tree is established. Through the research of the network analytic hierarchy process and the fuzzy comprehensive evaluation method, the SHC project construction safety risk evaluation index system is established, and the construction safety risk evaluation model is constructed. The construction safety risk of SHC project is evaluated and the result is analyzed. Finally, according to the idea of SHC project construction safety risk control, The research in this paper can objectively analyze the risk in the construction process of SHC project and provide the basis for risk management decision makers to formulate risk control strategy. This will be a very valuable research topic for Z construction unit to carry out similar projects.
【學(xué)位授予單位】:東北大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TU714
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李進(jìn)峰;建立建筑施工安全研究與培訓(xùn)基地的探討[J];建筑安全;2002年08期
2 王莉;亞太地區(qū)施工安全與衛(wèi)生協(xié)會(huì)(組織)第三屆年會(huì)會(huì)議記要[J];建筑安全;2003年05期
3 于建;施工安全之我見(jiàn)[J];建筑安全;2003年05期
4 鄭安啟;建筑施工安全有關(guān)罰款條款的解讀[J];建筑安全;2003年12期
5 李道成;走出認(rèn)識(shí)誤區(qū) 切實(shí)抓好施工安全生產(chǎn)[J];建筑安全;2005年09期
6 黃文武;;談建筑施工安全存在的問(wèn)題及對(duì)策[J];廣西城鎮(zhèn)建設(shè);2005年11期
7 ;構(gòu)建和諧社會(huì),關(guān)注建筑施工安全——記2005年“4·28世界安全生產(chǎn)與健康日”活動(dòng)[J];現(xiàn)代職業(yè)安全;2005年06期
8 黃家平;;淺析建筑施工安全的問(wèn)題和對(duì)策[J];建筑安全;2006年02期
9 謝惠慶;劉小剛;;科技創(chuàng)新與建筑施工安全[J];四川建筑;2006年S1期
10 胡振新;;加強(qiáng)安全管理 保障施工安全[J];河南科技;2007年03期
相關(guān)會(huì)議論文 前10條
1 高巍;;確保施工安全的經(jīng)驗(yàn)與辦法[A];2008年科技學(xué)術(shù)研討年提速安全與和諧鐵路論文集[C];2008年
2 陳連棟;趙琳;;論建筑施工安全應(yīng)重點(diǎn)解決的問(wèn)題[A];土木建筑學(xué)術(shù)文庫(kù)(第8卷)[C];2007年
3 李光明;李兵;;淺析建筑施工安全[A];土木工程建造管理(4)[C];2009年
4 王洪;;6s管理模式:建筑業(yè)施工安全的護(hù)身符[A];貴州工程項(xiàng)目管理論文集(2010)[C];2010年
5 周生文;;刻板工作法對(duì)確保水電施工安全的重要作用[A];擴(kuò)大鐵路對(duì)外開放、確保重點(diǎn)物資運(yùn)輸——中國(guó)科協(xié)2005年學(xué)術(shù)年會(huì)鐵道分會(huì)場(chǎng)暨中國(guó)鐵道學(xué)會(huì)學(xué)術(shù)年會(huì)和粵海通道運(yùn)營(yíng)管理學(xué)術(shù)研討會(huì)論文集[C];2005年
6 王哲;陳子立;;淺談建筑企業(yè)施工安全[A];現(xiàn)代建設(shè)工程應(yīng)用技術(shù)學(xué)術(shù)交流會(huì)論文集[C];2009年
7 洪世R,
本文編號(hào):1617633
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/1617633.html