四樁承臺(tái)塔吊樁基的設(shè)計(jì)與計(jì)算
發(fā)布時(shí)間:2018-01-03 21:16
本文關(guān)鍵詞:四樁承臺(tái)塔吊樁基的設(shè)計(jì)與計(jì)算 出處:《建筑技術(shù)》2015年S2期 論文類型:期刊論文
更多相關(guān)文章: 四樁承臺(tái) 工作狀態(tài) 非工作狀態(tài) 風(fēng)荷載
【摘要】:對四樁承臺(tái)塔吊樁基進(jìn)行設(shè)計(jì)計(jì)算,計(jì)算中考慮了塔吊工作狀態(tài)和非工作狀態(tài)時(shí)風(fēng)荷載對塔吊的影響,綜合比較上述兩種工況,按對基礎(chǔ)傳遞的傾覆力矩最大時(shí)的最不利工況進(jìn)行設(shè)計(jì),在確保滿足塔吊使用安全的前提下,取得了良好的經(jīng)濟(jì)效益。
[Abstract]:The design and calculation of four pile cap tower crane pile foundation are carried out. The influence of wind load on tower crane under working state and non-working state is considered in the calculation, and the above two working conditions are comprehensively compared. According to the most unfavorable working condition when the overturning moment of the foundation is the biggest, the good economic benefit is obtained on the premise of satisfying the safety of the tower crane.
【作者單位】: 河北省建筑科學(xué)研究院;
【分類號】:TU473.1
【正文快照】: 擬建的河北省石家莊市某工程,建筑物總長約62m,總寬約38m,總高約68m。該樓地上17層,地下2層,基底埋深約為13.7m;硬捎猛玲攭εc支護(hù)樁支護(hù)。 根據(jù)工程及周邊環(huán)境情況,施工單位需要在1/7~9xD~?布置一臺(tái)型號為FO/23B型(5023)塔機(jī),該塔機(jī)為附著式塔機(jī),最低附著高度為50m,最大
【相似文獻(xiàn)】
相關(guān)期刊論文 前4條
1 王暉;;重復(fù)的鐵皮衣裳[J];繽紛;2010年04期
2 鄔效衛(wèi);柴油機(jī)自動(dòng)怠速機(jī)構(gòu)[J];工程機(jī)械;1988年04期
3 鄒力生;;銷往臺(tái)灣地區(qū)塔機(jī)支承高度近似計(jì)算[J];建筑機(jī)械化;1991年04期
4 ;[J];;年期
,本文編號:1375614
本文鏈接:http://sikaile.net/guanlilunwen/chengjian/1375614.html
最近更新
教材專著