基于決策樹的電網(wǎng)企業(yè)信息化項目風(fēng)險管控
發(fā)布時間:2019-03-08 09:46
【摘要】:創(chuàng)新性地提出基于決策樹的信息化項目風(fēng)險管控方法。對電網(wǎng)企業(yè)的信息化項目從業(yè)務(wù)、技術(shù)、開發(fā)能力、標(biāo)準(zhǔn)規(guī)范、協(xié)調(diào)溝通等方面進行風(fēng)險管控需求的詳細分析;對典型的項目管控基礎(chǔ)進行介紹,明確典型的信息化項目的實施過程及風(fēng)險點;創(chuàng)新性地引入了分層權(quán)重法對信息化項目風(fēng)險進行分類加權(quán),并將決策樹理論引入信息化項目風(fēng)險管控中,從而有效辨識、估計以及評價風(fēng)險點,增強管理人員對信息化項目風(fēng)險的管控能力,減少可能發(fā)生的對項目的不良影響。
[Abstract]:The risk control method of information project based on decision tree is put forward creatively. The information project of power grid enterprise is analyzed in detail from the aspects of business, technology, development ability, standard and standard, coordination communication and so on. Introduce the typical project management and control foundation, and make clear the implementation process and risk point of typical information project; The hierarchical weighting method is introduced to classify and weigh the risk of information project, and the decision tree theory is introduced into the risk control of information project, so as to effectively identify, estimate and evaluate the risk points. Enhance the ability of managers to control the risk of information-based projects, reduce the possible adverse impact on the project.
【作者單位】: 廣東電網(wǎng)有限責(zé)任公司;
【分類號】:F270.7;F426.61
本文編號:2436684
[Abstract]:The risk control method of information project based on decision tree is put forward creatively. The information project of power grid enterprise is analyzed in detail from the aspects of business, technology, development ability, standard and standard, coordination communication and so on. Introduce the typical project management and control foundation, and make clear the implementation process and risk point of typical information project; The hierarchical weighting method is introduced to classify and weigh the risk of information project, and the decision tree theory is introduced into the risk control of information project, so as to effectively identify, estimate and evaluate the risk points. Enhance the ability of managers to control the risk of information-based projects, reduce the possible adverse impact on the project.
【作者單位】: 廣東電網(wǎng)有限責(zé)任公司;
【分類號】:F270.7;F426.61
【相似文獻】
相關(guān)期刊論文 前4條
1 胡海林;;發(fā)電企業(yè)信息化項目實施中的典型問題及對策[J];電力信息化;2005年09期
2 ;國家電網(wǎng)公司2012年信息化項目建設(shè)實施評優(yōu)參評項目資格審查會召開[J];電力信息化;2012年12期
3 施勇;周光林;;以信息化助推安全生產(chǎn)管理[J];云南電業(yè);2013年03期
4 曉雨;曉同;;從項目依托走向自主需求——廣州駿發(fā)電氣信息化之路[J];機械工業(yè)信息與網(wǎng)絡(luò);2007年06期
相關(guān)重要報紙文章 前2條
1 記者王海靜;公司兩信息化項目達國際先進水平[N];華北電力報;2010年
2 記者王海靜;公司五個信息化項目通過驗收[N];華北電力報;2010年
相關(guān)碩士學(xué)位論文 前4條
1 劉寒;亦莊供電公司自動電壓控制信息化項目建設(shè)與應(yīng)用研究[D];華北電力大學(xué)(北京);2016年
2 劉麗;電廠信息化投資項目評價應(yīng)用研究[D];內(nèi)蒙古工業(yè)大學(xué);2005年
3 段欣鑫;項目進度管理知識體系在發(fā)電企業(yè)信息化項目建設(shè)中的應(yīng)用[D];北京郵電大學(xué);2009年
4 黃燕;項目管理在三門核電施工信息化項目中的應(yīng)用研究[D];山東大學(xué);2013年
,本文編號:2436684
本文鏈接:http://sikaile.net/gongshangguanlilunwen/2436684.html
最近更新
教材專著