基于灰色層次分析模型的電網(wǎng)建設(shè)項目風(fēng)險評價研究

發(fā)布時間:2018-11-20 16:29
【摘要】:電力是國家基礎(chǔ)產(chǎn)業(yè),在整個國家發(fā)展中處于戰(zhàn)略核心地位。隨著我國經(jīng)濟(jì)的不斷發(fā)展,對于電力的需求也逐漸增大,近年來對于電網(wǎng)建設(shè)項目的需求日益增多。電網(wǎng)建設(shè)項目過程復(fù)雜、資金量大、參與主體多、建設(shè)周期長,項目建設(shè)過程中面對的風(fēng)險越來越復(fù)雜。近年來,出現(xiàn)了一些電網(wǎng)建設(shè)項目不達(dá)標(biāo)導(dǎo)致人身傷亡的案例,使得人們更加重視電網(wǎng)建設(shè)項目的風(fēng)險。隨著新電改的推進(jìn),電網(wǎng)建設(shè)項目需要考慮的風(fēng)險更加多樣,在項目實施過程中將面臨更多不確定性,有效識別和預(yù)測新形勢下電網(wǎng)建設(shè)項目的風(fēng)險并進(jìn)行評價分析從而及時制定應(yīng)對措施,對于降低或規(guī)避電網(wǎng)建設(shè)項目風(fēng)險、促進(jìn)電網(wǎng)建設(shè)項目順利實施具有重要意義。本文首先從相關(guān)概念、項目實施過程、風(fēng)險評估、風(fēng)險防范等維度分析闡述了電網(wǎng)建設(shè)項目風(fēng)險相關(guān)理論;其次從風(fēng)險識別理論、指標(biāo)選取原則、設(shè)計流程等方面構(gòu)建了電網(wǎng)建設(shè)項目風(fēng)險評價指標(biāo)體系;再次,在分析評價方法的基礎(chǔ)上,應(yīng)用灰色系統(tǒng)相關(guān)理論,對傳統(tǒng)的層析分析評價模型進(jìn)行改進(jìn),構(gòu)建了基于灰色層次分析的電網(wǎng)建設(shè)項目風(fēng)險評價模型,使得層次分析評價模型更加合理;最后,結(jié)合實際電網(wǎng)建設(shè)項目,應(yīng)用評價模型進(jìn)行了實證分析。通過本文的研究,一方面可以完善電網(wǎng)建設(shè)項目風(fēng)險評價方面的研究,另一方面通過對新形勢下的電網(wǎng)建設(shè)項目風(fēng)險進(jìn)行識別和分析,對電網(wǎng)建設(shè)項目防范風(fēng)險以及提前做好應(yīng)對策略具有一定的參考意義。
[Abstract]:Electric power is the national basic industry, in the whole national development in the strategic core position. With the development of economy in our country, the demand for electric power is increasing gradually, and the demand for power grid construction project is increasing day by day in recent years. The process of power grid construction project is complex, the amount of funds is large, the main body is more involved, the construction period is long, and the risk in the construction process is becoming more and more complex. In recent years, there have been some cases of casualties caused by the failure of power grid construction projects, which makes people pay more attention to the risk of power grid construction projects. With the development of the new power reform, the risks to be considered in the power grid construction project will be more diverse, and the project will face more uncertainty in the process of implementation. It is of great significance to identify and predict effectively the risks of grid construction projects under the new situation and to evaluate and analyze them so as to formulate corresponding measures in a timely manner to reduce or avoid the risks of grid construction projects and to promote the smooth implementation of grid construction projects. Firstly, this paper expatiates the theory of power grid construction project risk from the relevant concepts, project implementation process, risk assessment, risk prevention and other dimensions. Secondly, the risk evaluation index system of power grid construction project is constructed from the risk identification theory, the principle of index selection, the design process and so on. Thirdly, on the basis of the analysis and evaluation method, applying the relevant theory of grey system, we improve the traditional tomography evaluation model, and construct the risk evaluation model of power grid construction project based on grey hierarchy analysis. Make the AHP evaluation model more reasonable; Finally, combined with the actual grid construction project, the application of the evaluation model for empirical analysis. Through the research of this paper, on the one hand, we can perfect the research on risk evaluation of grid construction project, on the other hand, we can identify and analyze the risk of power grid construction project under the new situation. It has certain reference significance for the grid construction project to guard against the risk and to do the coping strategy well in advance.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F426.61

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 趙泓;;電力建設(shè)項目安全風(fēng)險辯識評價與應(yīng)用[J];價值工程;2015年36期

2 劉躍;劉風(fēng)娥;;新電改形勢下電網(wǎng)企業(yè)發(fā)展的機(jī)遇挑戰(zhàn)與對策[J];國網(wǎng)技術(shù)學(xué)院學(xué)報;2015年06期

3 張志遠(yuǎn);;我國售電側(cè)市場建設(shè)若干問題分析[J];時代經(jīng)貿(mào);2015年18期

4 瞿寧寧;;淺談電網(wǎng)建設(shè)中的法律風(fēng)險防范[J];大眾用電;2015年07期

5 白玫;;新電改方案的邏輯起點與政策影響[J];價格理論與實踐;2015年06期

6 郭祥梅;;淺談我國電力行業(yè)的金融風(fēng)險管理[J];低碳世界;2013年12期

7 何永秀;戴愛英;楊衛(wèi)紅;方銳;LI Furong;;基于模糊理論的城市電網(wǎng)風(fēng)險識別與評價[J];電網(wǎng)技術(shù);2010年09期

8 鄭萬勇;薛飛;李亞光;;建設(shè)項目風(fēng)險評價研究[J];科技創(chuàng)新導(dǎo)報;2009年28期

9 席一凡;聶興信;王超;;工程項目風(fēng)險評價模型研究[J];災(zāi)害學(xué);2009年03期

10 孫洪罡;王來生;;項目投資中的風(fēng)險評價指標(biāo)及其量化方法[J];商場現(xiàn)代化;2009年02期

相關(guān)碩士學(xué)位論文 前10條

1 任亞琴;智能電網(wǎng)建設(shè)項目風(fēng)險評價模型及應(yīng)用研究[D];華北電力大學(xué);2014年

2 尚敬英;基于可拓層次分析法的火電建設(shè)工程項目風(fēng)險評價研究[D];華北電力大學(xué);2014年

3 楊靜;配電網(wǎng)建設(shè)項目風(fēng)險管理研究[D];華北電力大學(xué);2013年

4 徐莉娟;電網(wǎng)建設(shè)項目安全風(fēng)險管理研究[D];華北電力大學(xué);2013年

5 田雨;電網(wǎng)建設(shè)項目風(fēng)險評價及防控對策研究[D];華北電力大學(xué);2013年

6 張衛(wèi)東;電力基建工程項目風(fēng)險管理研究[D];華北電力大學(xué);2013年

7 孟衛(wèi)萍;電網(wǎng)建設(shè)工程項目動態(tài)風(fēng)險管理及實證研究[D];華北電力大學(xué);2013年

8 郁松;電網(wǎng)建設(shè)工程項目風(fēng)險管理研究[D];昆明理工大學(xué);2013年

9 李大鵬;電力工程項目風(fēng)險管理研究[D];東北石油大學(xué);2012年

10 洪俊;電網(wǎng)建設(shè)項目風(fēng)險管理研究[D];華北電力大學(xué)(北京);2011年



本文編號:2345399

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/gongshangguanlilunwen/2345399.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶cfac8***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com