澄合二礦資源整合項目可行性研究
[Abstract]:In order to solve the problems of insufficient exploitation of mineral resources in the original mining area and to expand the mining output in this area, the Chenghe No. 2 Coal Mine Mineral Resources Integration Project is prepared to further expand the extension and development of mineral resources in the third level coal seam of No. 2 Coal Mine. The aim of this paper is to improve the whole exploitation level of the whole mining area, the intensive exploitation degree and the risk control of the mineral enterprises, and to promote the rational expansion of the production of the mineral resources in Chenghe No. 2 Mine. Based on the analysis of the actual progress in the development of mineral resources in Chenghe No. 2 Mine, it is found that the integration of resources has begun to solve the problem of production expansion. However, because of the limitation of mining scope, the backward mining technology and the lack of specialized technicians, the production of coal resources in this area has entered the bottleneck of continuing exploitation because of the limitation of mining scope, the lack of specialized technicians, especially the local coal mining enterprises. In the face of the transformation and adjustment of the national energy consumption structure, no matter whether the resource integration project is the merger and reorganization of the small coal enterprises familiar with the surrounding areas or the further deep mining in this mining area, it is looking for ways to expand the output of coal resources. Will face great risks. The feasibility study on the integration project of mineral resources has very important practical and theoretical significance for coal enterprises. On the basis of summing up the existing research at home and abroad, this paper studies the feasibility of Chenghe No. 2 Mine Resource Integration Project by the methods of literature research, questionnaire survey, qualitative and quantitative research. Firstly, the necessity of resource integration project is analyzed by analyzing the actual situation of the existing mine, production status and market situation in Chenghe No. 2 Mine. Secondly, the risk of the project, especially the environmental risk, is analyzed. This paper demonstrates the safety feasibility of the integrated project, and through the analysis of the new level of development conditions, the situation of the mining area, the level of the production auxiliary system and so on, obtains that the integration project is technically feasible, and finally, The economic feasibility of the project is further analyzed through financial evaluation, and it is proved that the project is economically feasible. On the basis of this, the project scheme of resource integration in Chenghe No. 2 Coal Mine is established. This scheme has certain reference and reference significance in realizing rational utilization and development of new resources in mining area, optimizing allocation of resources, realizing intensive development of enterprises, and is more conducive to the optimization of the development layout of mineral resources in Chenghe No. 2 Mine. It also brings the influence of taxes, profits and costs to the local economic transformation, and realizes the sustainable development of mineral regions.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:F426.21;TD82
【參考文獻】
相關(guān)期刊論文 前10條
1 宋國明;鄭子敬;;澳大利亞礦業(yè)投資環(huán)境[J];國土資源情報;2012年12期
2 羅小南;;關(guān)于礦產(chǎn)資源整合所面臨困局的思考[J];中國國土資源經(jīng)濟;2010年11期
3 劉伯恩;魯曉琨;;礦產(chǎn)資源整合中的經(jīng)濟關(guān)系研究[J];礦產(chǎn)保護與利用;2010年04期
4 宋磊;汪雄武;;淺議我國的礦產(chǎn)資源整合[J];中國國土資源經(jīng)濟;2010年07期
5 朱永全;;從資源整合到體制、機制和人心整合的轉(zhuǎn)變——中小煤礦實施資源整合的新突破[J];中國煤炭工業(yè);2010年05期
6 張建平;馬司璽;;山西煤炭資源整合若干問題的探討[J];中國高新技術(shù)企業(yè);2010年12期
7 陳春林;;關(guān)于進一步推進礦產(chǎn)資源開發(fā)整合工作[J];世紀行;2010年03期
8 曹慧芳;;對資源整合操作問題的探討[J];煤;2010年02期
9 賈寶亮;;山西煤炭資源的整合利用[J];山西能源與節(jié)能;2009年06期
10 原俊恩;;煤炭資源整合是社會發(fā)展的需要[J];山西煤炭;2009年03期
相關(guān)碩士學(xué)位論文 前5條
1 劉小軍;S公司煤炭資源整合方案設(shè)計研究[D];華南理工大學(xué);2014年
2 張磊;小保當(dāng)?shù)V井投資項目可行性研究[D];西南石油大學(xué);2014年
3 杜菲;山西JM集團煤炭資源整合礦井G項目可行性研究[D];天津大學(xué);2012年
4 王飛;山西省煤炭產(chǎn)業(yè)整合研究[D];山西財經(jīng)大學(xué);2011年
5 秦利斌;鄭莊礦井項目可行性分析及管理運營模式研究[D];天津大學(xué);2010年
,本文編號:2136598
本文鏈接:http://sikaile.net/gongshangguanlilunwen/2136598.html