A公司新型煤化工大修項目管理研究
發(fā)布時間:2018-01-02 19:36
本文關鍵詞:A公司新型煤化工大修項目管理研究 出處:《華東理工大學》2017年碩士論文 論文類型:學位論文
【摘要】:近兩年國外和國內(nèi)煤化工競爭異常激烈,尤其是國際油價下跌和國內(nèi)煤化工產(chǎn)能過剩,造成公司產(chǎn)品價格低下,企業(yè)利潤下降嚴重。為了進一步提高企業(yè)的競爭力,不少煤化工企業(yè)開始探索延長煤化工大修周期,縮短大修時間,以達到減少大修成本的目的。A公司屬于以煤為原料生產(chǎn)甲醇、醋酸和醋酸乙酯的新型煤化工生產(chǎn)基地。面臨競爭激烈的環(huán)境,作為煤化工的新型示范性基地,迫切需要保證大修質(zhì)量以及安全,縮短大修時間,提升公司的競爭力。本文以A公司為例,闡述了公司進行大修項目管理的背景和意義,分析了A公司大修檢修項目、大修的基本情況和面臨的問題。然后,基于WBS對大修項目進行工作結構分解,確定大修項目工序之間的先后關系及時間參數(shù),繪制大修項目的網(wǎng)絡進度計劃圖,通過計算最早開始時間、最早完成時間、最晚開始時間和最晚結束時間等時間參數(shù),確定了項目的關鍵路徑。同時,提出了項目進度控制的保障措施。在此基礎上,提出了大修項目質(zhì)量的計劃和控制,提出了相應的安全目標和安全控制措施。
[Abstract]:In the last two years, the competition between foreign and domestic coal chemical industry is extremely fierce, especially the drop of international oil price and the overcapacity of domestic coal chemical industry, which results in the low price of the company's products. In order to further improve the competitiveness of enterprises, many coal chemical enterprises began to explore the extension of coal chemical overhaul cycle and shorten the overhaul time. In order to reduce the cost of overhaul, Company A belongs to the new coal chemical production base of producing methanol, acetic acid and ethyl acetate from coal. Facing the fierce competition environment, A Company is a new model base of coal chemical industry. There is an urgent need to ensure the quality and safety of the overhaul, shorten the overhaul time, and enhance the competitiveness of the company. This paper takes company A as an example to explain the background and significance of the project management in the company. This paper analyzes the overhaul project of company A, the basic situation of overhaul and the problems faced. Then, based on WBS, the work structure of the overhaul project is decomposed to determine the relation and time parameter between the working procedures of the overhaul project. By calculating the earliest start time, the earliest completion time, the latest start time and the latest end time, the critical path of the project is determined. On the basis of this, the plan and control of the quality of the overhauling project are put forward, and the corresponding safety objectives and safety control measures are put forward.
【學位授予單位】:華東理工大學
【學位級別】:碩士
【學位授予年份】:2017
【分類號】:F426.7
【參考文獻】
相關期刊論文 前9條
1 俞宗衛(wèi);屈江;俞靖賢;;網(wǎng)絡計劃技術在施工項目管理中應用問題的討論[J];四川建筑科學研究;2008年05期
2 龐秋翠;黃琦;田兵權;;淺論基于動態(tài)目標管理的項目進度管理[J];價值工程;2008年05期
3 萬立;陳性攀;劉清華;;面向產(chǎn)品開發(fā)的項目管理在產(chǎn)品數(shù)據(jù)管理中的研究[J];計算機集成制造系統(tǒng);2007年01期
4 王忠平;;現(xiàn)代項目管理在科技項目中的應用研究[J];中國科技論壇;2006年06期
5 楊鎖強,樊建新,劉芳;產(chǎn)業(yè)化技術項目評價指標的系統(tǒng)集成與綜合評價模型的構建[J];研究與發(fā)展管理;2004年04期
6 程錫禮,張延林,崔新生;蒙特卡洛仿真在工程項目進度管理中的應用[J];工業(yè)工程;2004年03期
7 廖清平;建筑項目管理中的沖突管理[J];工程建設與設計;2003年07期
8 謝琳琳,傅鴻源;初探生態(tài)化建筑項目管理[J];建設監(jiān)理;2003年03期
9 秦朔;美國企管思維十大變化[J];領導決策信息;2001年41期
,本文編號:1370666
本文鏈接:http://sikaile.net/gongshangguanlilunwen/1370666.html
教材專著