高海拔地區(qū)大型輸電項(xiàng)目環(huán)境影響評價(jià)方法研究
[Abstract]:Electric power industry is the basic industry of national economy. In order to adapt to the development of social economy and the improvement of people's living standard, power grid enterprises need to continue to promote the construction of power grid, in order to ensure the continuous development of power grid and the continuous growth of social electricity consumption. This has become an important basic guarantee for the development of national material civilization and spiritual civilization. The energy artery connecting Qinghai and Tibet on July 29, 2010-the Qinghai-Tibet power grid interconnection project began construction in Golmud, Qinghai, and Lhasa, Tibet, at the same time, 2011. In November 2000, the Qinghai-Tibet network project was completed. Marking the world's highest elevation of the largest transmission project completed, and put into trial operation. Qinghai-Tibet network project is the highest elevation and longest transmission and transformation project in the world. The special construction environment and the running environment make it have special difference from the general project, so it is necessary to evaluate the environmental impact with new methods and new perspectives. Based on the post-evaluation theory of power grid construction project, especially the post-evaluation theory of environmental impact of power grid construction project, this paper takes the Qinghai-Tibet network project as the research object. Based on the analysis of the environmental characteristics of large power transmission projects in high-altitude areas, a specific environmental impact assessment index system for high-altitude areas is established, which includes three aspects: natural environment, social environment and economic environment. Through the study of the characteristics of the index system, the improved entropy weight extension method is selected to evaluate the environmental impact. Finally, it is concluded that the power frequency electric field and the power frequency magnetic field produced by the transmission project are less polluted to the natural environment and put into use after the completion of the project. The noise values all conform to the standards prescribed by the state, do not destroy the natural and cultural landscape along the line, and the waste and pollutants are treated in a timely manner; and the impact on the ecological environment is relatively small. The destruction and influence of the precious wildlife involved along the way has been reduced to a lower level, and the greening level and vegetation coverage have been restored in time after the completion of the project construction, which basically accords with the standards of the industry.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:X82;F426.61
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李剛;朱革蘭;劉宇新;肖天為;胡文杰;;用于智能GIS設(shè)備狀態(tài)實(shí)時(shí)評估的狀態(tài)量綜合權(quán)重法[J];高壓電器;2014年03期
2 曾建軍;史正濤;劉新有;崔艷強(qiáng);杜瑩;蘇旺德;;基于物元可拓模型的高原盆地城市水源地脆弱性評價(jià)[J];節(jié)水灌溉;2014年01期
3 陳西蕊;;基于改進(jìn)熵權(quán)法的游客滿意度評價(jià)方法及其應(yīng)用[J];西安文理學(xué)院學(xué)報(bào)(社會科學(xué)版);2013年06期
4 楊高升;章曉錦;;粗糙熵模糊決策在建筑企業(yè)信用評級模式選擇中的應(yīng)用[J];電子設(shè)計(jì)工程;2013年19期
5 潘燕華;劉晨熙;;基于改進(jìn)AHP和熵權(quán)法的預(yù)制節(jié)段梁生產(chǎn)運(yùn)輸方案研究[J];電子設(shè)計(jì)工程;2013年14期
6 孟剛;文習(xí)山;鄧慰;陳勇;高紅林;余波;;高海拔地區(qū)500kV變電站典型電極的外絕緣特性[J];高電壓技術(shù);2013年01期
7 資文茂;畢義明;康璞;;基于多屬性決策的誘餌有效性評估[J];電子設(shè)計(jì)工程;2012年13期
8 沈陽武;彭曉濤;施通勤;毛荀;孫元章;;基于最優(yōu)組合權(quán)重的電能質(zhì)量灰色綜合評價(jià)方法[J];電力系統(tǒng)自動化;2012年10期
9 周華;周生路;楊得志;吳紹華;;農(nóng)村建設(shè)用地整理時(shí)空布局與模式選擇的決策方法[J];農(nóng)業(yè)工程學(xué)報(bào);2012年S1期
10 沈澤剛;鐘德春;;粗糙集理論在學(xué)生綜合評價(jià)中的應(yīng)用研究[J];電子設(shè)計(jì)工程;2012年08期
相關(guān)博士學(xué)位論文 前1條
1 曹晶;高海拔換流站空氣間隙放電特性及海拔修正研究[D];武漢大學(xué);2013年
相關(guān)碩士學(xué)位論文 前2條
1 劉佳;濕地保護(hù)中的環(huán)境影響評價(jià)制度研究[D];廣西大學(xué);2013年
2 宋輝;風(fēng)電工程生態(tài)環(huán)境影響評價(jià)研究[D];東北林業(yè)大學(xué);2013年
,本文編號:2279450
本文鏈接:http://sikaile.net/wenyilunwen/huanjingshejilunwen/2279450.html