某污水處理廠活性污泥法工藝對(duì)比和改造中試研究
[Abstract]:A sewage treatment plant is a comprehensive wastewater treatment plant, the main wastewater treatment is printing and dyeing wastewater and domestic sewage. The construction process of the sewage treatment plant is divided into three phases, the first and second phases are treated with three hundred thousand tons per day, and the third phase is four hundred thousand tons per day. With the development of industrial park, the quantity of sewage is increasing and the quality of wastewater is getting worse. With the backward treatment technology and the aging of treatment facilities, the operation of the treatment plant is gradually lower than the expected effect, in order to meet the latest discharge standards. The sewage plant must be upgraded. This article takes this sewage treatment plant as the research object, plans to carry on the reasonable transformation to the sewage treatment process, combined with the former treatment plant actual operation data, carries on the contrast analysis to the first stage and the third stage biochemical stage treatment effect, The problems existing in the first phase of the existing process are put forward. Two-stage activated sludge method was selected to replace the traditional activated sludge process after the comprehensive comparison of the process, and was verified by pilot-scale test. Compared with the effluent condition of the original process, the effluent CODcr of the pre-treatment two-stage aerated (AB) combination process is 15% lower than that of the first stage aerobic effluent, and the output of surplus sludge in the high load stage (A stage) is much lower than the expected level. The advantages of technology are obvious. The technical treatment effect is good, the implementation difficulty is small, the investment and the operation cost are relatively low. It is proposed to change the former "anaerobic tank sedimentation tank second sedimentation tank" to "A stage aeration tank A stage sedimentation tank B stage aeration tank B stage sedimentation tank" to realize the upgrading of the first stage process. At the same time, according to the water quality of the second stage effluent, the optimization scheme of the process parameters was made, and the range of the important parameters (dissolved oxygen, sludge concentration, reflux ratio) in the biochemical treatment stage was adjusted to improve the treatment effect. Through orthogonal experiment, the optimum combination of dissolved oxygen, sludge concentration and reflux ratio is 3.5 g / L, 2.5 mg/L~3.5 mg/L and 65%, and the process parameters are applied to the actual treatment system to realize the upgrading of the secondary process. The renovation and upgrading project of this sewage treatment plant has important practical significance. It will provide theoretical and practical references for the transformation and optimization of large and medium-sized sewage treatment plants that have been completed or are under construction, and will play an exemplary role in the whole sewage treatment industry. At the same time, it has long-term significance for local water body protection and urban development.
【學(xué)位授予單位】:浙江工業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:X703
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張漢明,俞明宏;政府投資 個(gè)人參股 加快城鎮(zhèn)污水處理步伐——德國(guó)城鎮(zhèn)污水處理廠考察的幾點(diǎn)啟示[J];環(huán)境導(dǎo)報(bào);2000年02期
2 范秀磊,宋代敏;城市污水處理廠安全工作淺議[J];勞動(dòng)保護(hù);2000年06期
3 邱衛(wèi)東;訪紐約北河污水處理廠[J];能源工程;2000年04期
4 李金海,李保軍;日本最大的地下污水處理廠[J];中國(guó)市政工程;2000年01期
5 蔣永進(jìn);鐵嶺污水處理廠項(xiàng)目開(kāi)始實(shí)施[J];中國(guó)資源綜合利用;2000年03期
6 武云甫;檀星;任小燕;王燕敏;;沈陽(yáng)污水處理廠建設(shè)多快好省[J];城市規(guī)劃通訊;2000年02期
7 ;沈陽(yáng)余糧堡污水處理廠工程[J];中國(guó)給水排水;2001年07期
8 ;溫州市中心片污水處理廠工程[J];中國(guó)給水排水;2001年07期
9 王新廠 ,莫德順;城市污水處理廠存在的問(wèn)題及發(fā)展對(duì)策研究[J];山東環(huán)境;2001年05期
10 柯文仲;周新民;關(guān)敏芝;;與豬共舞的污水處理廠[J];環(huán)境;2001年01期
相關(guān)會(huì)議論文 前10條
1 王威;;遼寧省城鎮(zhèn)污水處理廠運(yùn)行問(wèn)題及對(duì)策研究[A];2014中國(guó)環(huán)境科學(xué)學(xué)會(huì)學(xué)術(shù)年會(huì)(第三章)[C];2014年
2 張憲忠;孫紅文;;天津市污水處理廠中全氟化合物調(diào)查[A];持久性有機(jī)污染物論壇2009暨第四屆持久性有機(jī)污染物全國(guó)學(xué)術(shù)研討會(huì)論文集[C];2009年
3 陳穎;楊常青;李麗娜;呂曉君;卞華峰;;重點(diǎn)流域城鎮(zhèn)污水處理廠抽樣調(diào)查評(píng)估[A];中國(guó)環(huán)境科學(xué)學(xué)會(huì)2009年學(xué)術(shù)年會(huì)論文集(第一卷)[C];2009年
4 高建磊;閆怡新;吳建平;;河南省城市污水處理廠能耗物耗統(tǒng)計(jì)與影響因素分析[A];全國(guó)給水排水技術(shù)信息網(wǎng)2009年年會(huì)論文集[C];2009年
5 宋杰;高艷麗;;政府批準(zhǔn)、企業(yè)自建形式下的城市污水處理廠前期策劃的實(shí)例分析[A];2007年全國(guó)給水排水技術(shù)信息網(wǎng)成立三十五周年紀(jì)念專集暨年會(huì)論文集[C];2007年
6 翁奕華;;淺談污水處理廠電氣設(shè)備的維護(hù)和維修[A];2007年全國(guó)給水排水技術(shù)信息網(wǎng)成立三十五周年紀(jì)念專集暨年會(huì)論文集[C];2007年
7 曲鳳龍;蘭玲;;本鋼污水處理廠運(yùn)行中存在問(wèn)題與解決對(duì)策[A];全國(guó)冶金節(jié)水與廢水利用技術(shù)研討會(huì)文集[C];2009年
8 胡正君;史亞利;牛紅云;蔡亞岐;;北京市污水處理廠合成麝香污染現(xiàn)狀調(diào)查研究[A];中國(guó)化學(xué)會(huì)第27屆學(xué)術(shù)年會(huì)第02分會(huì)場(chǎng)摘要集[C];2010年
9 馬超;陳向明;;淺談城市污水處理廠中的節(jié)能技術(shù)[A];2010年全國(guó)給水排水技術(shù)信息網(wǎng)年會(huì)論文集[C];2010年
10 杜兆林;鄭彤;劉麗艷;王鵬;白楊;秦世麗;李一凡;;污水處理廠中抗生素去除情況研究[A];持久性有機(jī)污染物論壇2011暨第六屆持久性有機(jī)污染物全國(guó)學(xué)術(shù)研討會(huì)論文集[C];2011年
相關(guān)重要報(bào)紙文章 前10條
1 記者杜鵑;北京城建遠(yuǎn)赴南昌建設(shè)經(jīng)營(yíng)污水處理廠[N];北京日?qǐng)?bào);2003年
2 李飛 石春榮;湖北武漢將新建擴(kuò)建7座污水處理廠[N];中國(guó)環(huán)境報(bào);2004年
3 孫廣洋;大連虎灘泉水污水處理廠年內(nèi)投入使用[N];中國(guó)環(huán)境報(bào);2005年
4 趙都;河北省唐山市擴(kuò)建兩座污水處理廠[N];中國(guó)環(huán)境報(bào);2005年
5 記者 李飛 通訊員 申輝 夏雄彪;湖北兩座污水處理廠遭遇“兩重天”[N];中國(guó)環(huán)境報(bào);2005年
6 季英德 劉建清;山東棗莊四座污水處理廠齊頭并進(jìn)[N];中國(guó)環(huán)境報(bào);2005年
7 本報(bào)記者 郭亞林;污水處理廠為何“曬起了太陽(yáng)”?[N];中國(guó)經(jīng)濟(jì)導(dǎo)報(bào);2005年
8 張文林;山東污水處理廠運(yùn)行情況不容樂(lè)觀[N];中國(guó)水利報(bào);2005年
9 記者 湯璇 通訊員 粵環(huán)宣;英德西城污水處理廠投入使用[N];廣東建設(shè)報(bào);2003年
10 ;24家污水處理廠今年動(dòng)工[N];廣州日?qǐng)?bào);2003年
相關(guān)博士學(xué)位論文 前10條
1 王麗玲;城鎮(zhèn)污水處理廠清潔生產(chǎn)評(píng)價(jià)指標(biāo)體系及等級(jí)綜合評(píng)價(jià)方法研究[D];大連理工大學(xué);2015年
2 王卓;典型PPCPs在深圳河流域分布遷移特征及控制技術(shù)研究[D];清華大學(xué);2015年
3 周曉琴;超聲波強(qiáng)化污水處理廠出水消毒技術(shù)研究[D];北京科技大學(xué);2016年
4 高立紅;北京市城市環(huán)境有機(jī)磷酸酯污染水平和分布特征研究[D];北京科技大學(xué);2016年
5 呂晨;基于強(qiáng)化的A~2O工藝在污水處理廠升級(jí)改造中的應(yīng)用研究[D];中國(guó)地質(zhì)大學(xué)(北京);2015年
6 龔凌;德州市水污染防治與水生態(tài)改善策略研究[D];中國(guó)海洋大學(xué);2015年
7 盛彥清;廣州市典型污染河道與城市污水處理廠中惡臭有機(jī)硫化物的初步研究[D];中國(guó)科學(xué)院研究生院(廣州地球化學(xué)研究所);2007年
8 蔣茹;基于不確定性理論與方法的城市污水處理廠優(yōu)化決策研究[D];湖南大學(xué);2007年
9 桂紅艷;城市污水處理廠對(duì)周邊環(huán)境污染及防治初步研究[D];中國(guó)科學(xué)院研究生院(廣州地球化學(xué)研究所);2007年
10 李曉東;城市污水處理廠數(shù)據(jù)挖掘及相關(guān)技術(shù)研究[D];湖南大學(xué);2007年
相關(guān)碩士學(xué)位論文 前10條
1 張麗麗;城市污水處理廠集中式和分散式建設(shè)的對(duì)比研究[D];合肥工業(yè)大學(xué);2009年
2 高琴;城鎮(zhèn)污水處理廠規(guī)模技術(shù)有效性評(píng)價(jià)與調(diào)控研究[D];新疆大學(xué);2006年
3 梁競(jìng)斌;城市污水處理廠建設(shè)運(yùn)營(yíng)的評(píng)價(jià)與對(duì)策研究[D];華南理工大學(xué);2014年
4 蘆辰;污水處理廠出口在線監(jiān)測(cè)系統(tǒng)運(yùn)行與管理評(píng)價(jià)研究[D];清華大學(xué);2014年
5 張偉;A市污水處理廠工程的應(yīng)用研究[D];吉林建筑大學(xué);2014年
6 秦丹丹;城市污水處理廠氧化溝按需曝氣控氮新工藝及應(yīng)用[D];浙江大學(xué);2015年
7 郭一;重慶市江津區(qū)村鎮(zhèn)污水處理廠運(yùn)管績(jī)效評(píng)估研究[D];西南大學(xué);2015年
8 王杰;城市污水處理廠環(huán)境激素類污染物控制技術(shù)研究[D];山東建筑大學(xué);2015年
9 Gutama Indra Gandha;污水處理廠的控制集成模型預(yù)測(cè)控制欲模糊理論[D];華南理工大學(xué);2015年
10 徐巍娜;太湖流域城市污水處理廠的環(huán)境績(jī)效評(píng)價(jià)研究[D];南京信息工程大學(xué);2015年
,本文編號(hào):2459584
本文鏈接:http://sikaile.net/shengtaihuanjingbaohulunwen/2459584.html