二灘水電站計(jì)算機(jī)監(jiān)控系統(tǒng)問題分析與改造
[Abstract]:With the rapid economic growth of our country, the demand for energy, especially for electricity, has increased correspondingly, which has also promoted the rapid development of the electric power industry. With the increasing scale of power network and the increasingly severe network security situation, the security, reliability, stability and power quality of power supply enterprises are required higher. Especially for the power generation enterprise computer monitoring system put forward higher requirements. Ertan Hydropower Station is the largest hydropower station in China in the 20th century. At present, Ertan Hydropower Station is still the main power station in Southwest Power Grid, which is responsible for peak-shaving, frequency modulation and other important functions. Ertan Hydropower Station has been in operation since 1998, and the computer monitoring system has been in operation for more than ten years. Since Ertan Hydropower Station, a number of large and even giant hydropower stations have been built in China. This paper analyzes the defects of the original computer monitoring system of Ertan Hydropower Station, the equipment performance can not meet the requirements of power standards, and the inextensibility of the system, and analyzes the inevitability of the transformation of the original computer monitoring system of Ertan Hydropower Station. Then, by studying the feasibility of computer monitoring system network structure, upper computer, lower computer, AGC/AVC system, hydrologic communication and dispatching communication, we find a safe and feasible reconstruction scheme that meets the practical requirements. The key points and difficulties in the reconstruction work are analyzed, and the technical innovation points of the transformation of the computer monitoring system of Ertan Hydropower Station are listed. Finally, by analyzing the technical advantages of the computer monitoring system after the transformation, and comparing with the original monitoring system, the improvement work of the computer monitoring system is evaluated. This paper summarizes and refines the technical strategy of safety reformation of large-scale hydropower station calculation and monitoring system.
【學(xué)位授予單位】:華北電力大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TP277
【參考文獻(xiàn)】
相關(guān)期刊論文 前8條
1 彭永鋒;;104規(guī)約通信在遠(yuǎn)動(dòng)系統(tǒng)的應(yīng)用[J];科技資訊;2010年02期
2 劉小力;;二灘電廠監(jiān)控系統(tǒng)簡介[J];科協(xié)論壇(下半月);2009年01期
3 裘坤;李華軍;何應(yīng)堅(jiān);;控制系統(tǒng)冗余設(shè)計(jì)和分析[J];自動(dòng)化儀表;2008年12期
4 劉念,滕福生,謝馳;發(fā)電廠計(jì)算機(jī)監(jiān)控技術(shù)[J];電氣時(shí)代;2004年02期
5 陳邦蓉;水電廠計(jì)算機(jī)監(jiān)控系統(tǒng)發(fā)展趨勢(shì)[J];四川電力技術(shù);2003年05期
6 方輝欽,施沖,朱辰,龐敏,彭永,吳正義;水電廠無人值班與監(jiān)控系統(tǒng)改造[J];水電自動(dòng)化與大壩監(jiān)測;2003年01期
7 楊金棟;我國水電廠技術(shù)改造綜述[J];水力發(fā)電;1999年09期
8 蔡運(yùn)清;北美變電站自動(dòng)化現(xiàn)狀[J];電力系統(tǒng)自動(dòng)化;1997年07期
相關(guān)碩士學(xué)位論文 前10條
1 張俊瑋;柘林水電廠計(jì)算機(jī)監(jiān)控系統(tǒng)改造的研究與應(yīng)用[D];華北電力大學(xué);2015年
2 汪正江;基于網(wǎng)絡(luò)監(jiān)聽的IEC60870-5-104通信規(guī)約測試方法研究[D];上海交通大學(xué);2013年
3 余明明;基于混沌粒子群算法的大型水電站自動(dòng)電壓控制優(yōu)化研究[D];華中科技大學(xué);2013年
4 周彤;水電站計(jì)算機(jī)監(jiān)控系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];北京工業(yè)大學(xué);2012年
5 李嵐;水電廠計(jì)算機(jī)監(jiān)控系統(tǒng)的研究與設(shè)計(jì)[D];太原理工大學(xué);2011年
6 方榮華;某水電廠計(jì)算機(jī)監(jiān)控系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];華中科技大學(xué);2010年
7 何旭東;小型水電站技改監(jiān)控系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];電子科技大學(xué);2010年
8 王鳳利;太平哨水電廠計(jì)算機(jī)監(jiān)控系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[D];華北電力大學(xué)(河北);2010年
9 洪浩;三峽電源電站計(jì)算機(jī)監(jiān)控系統(tǒng)的研究與實(shí)現(xiàn)[D];重慶大學(xué);2008年
10 趙會(huì)成;基于PCC的水電站計(jì)算機(jī)監(jiān)控系統(tǒng)的研究[D];河北工業(yè)大學(xué);2007年
,本文編號(hào):2370128
本文鏈接:http://sikaile.net/kejilunwen/zidonghuakongzhilunwen/2370128.html