延遲時間生產(chǎn)系統(tǒng)預(yù)防維修策略和X-bar控制圖聯(lián)合經(jīng)濟(jì)設(shè)計
[Abstract]:Based on the single component delay time production system with normal distribution of output quality characteristics of production process, the joint economic design of preventive maintenance strategy and X-bar control diagram is studied. First of all, the delay time system is defined as controlled, out of control and fault, and the relationship between the actual state of the system and the monitoring result of the control chart is given according to the actual state of the system and the monitoring result of the control chart. The coupling mechanism of maintenance mode and control chart monitoring of production system is analyzed and constructed. On this basis, the expected minimum cost per unit time is taken as the goal, the system maintenance cost, the product quality sampling cost, the production cost of the nonconforming product, and the production loss of the maintenance shutdown are considered as the cost content. The combined decision model of preventive maintenance strategy and X-bar control chart of production system is established by using renewal process theory. Then, based on the numerical simulation example, the genetic algorithm is used to analyze and verify the solution of the model. The analysis results show that the model is feasible and effective. Finally, the sensitivity of the model parameters is analyzed by using partial factor test design method.
【作者單位】: 鄭州航空工業(yè)管理學(xué)院管理工程學(xué)院;河南航空經(jīng)濟(jì)發(fā)展協(xié)同創(chuàng)新中心;
【基金】:國家自然科學(xué)基金項(xiàng)目(U1404702) 航空科學(xué)基金項(xiàng)目(2014ZG55021,2016ZG55021) 河南省教育廳人文社會科學(xué)研究項(xiàng)目(2014-ZD-010) 河南省科技廳科技攻關(guān)項(xiàng)目(172102210531)資助課題
【分類號】:O213.1
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 王文義,張洪芬;維修策略的概念、方法和模型(Ⅰ)[J];運(yùn)籌與管理;1997年02期
2 王文義,張洪芬;維修策略的概念、方法和模型(Ⅱ)[J];運(yùn)籌與管理;1997年02期
3 廖炯生;;n中取相鄰k系統(tǒng)可靠性及街燈照明系統(tǒng)維修策略[J];自動化學(xué)報;1992年03期
4 阮大偉;系統(tǒng)設(shè)備的維修策略及優(yōu)化研究[J];西北電力技術(shù);2001年04期
5 李澤慧,焦桂梅;維修策略的隨機(jī)比較[J];蘭州大學(xué)學(xué)報;1999年01期
6 江曉岳,,程侃,江榮漢;關(guān)于隨機(jī)小修費(fèi)用模型的最優(yōu)維修策略[J];湖南大學(xué)學(xué)報(自然科學(xué)版);1995年06期
7 李峰,王建平,任新見;橋梁維修策略分析[J];交通科技;2002年06期
8 李青,陸廷金,李寧萍,張玉柱;某新型裝備維修策略的研究[J];模糊系統(tǒng)與數(shù)學(xué);1999年02期
9 張公緒,孫靜;統(tǒng)計過程 控制與診斷 第三講 控制圖的判斷準(zhǔn)則[J];質(zhì)量與可靠性;2002年03期
10 朱正森;;兩類控制圖不能混合一談[J];輕型汽車技術(shù);2002年08期
相關(guān)會議論文 前7條
1 劉啟浩;楊振海;;可變抽樣區(qū)間的累積合格品數(shù)控制圖[A];2003中國現(xiàn)場統(tǒng)計研究會第十一屆學(xué)術(shù)年會論文集(上)[C];2003年
2 郭寶才;孫利榮;;抽樣資源的分配對于
本文編號:2300417
本文鏈接:http://sikaile.net/kejilunwen/yysx/2300417.html