基礎(chǔ)IE及仿真技術(shù)在手機(jī)裝配線優(yōu)化中的應(yīng)用
發(fā)布時(shí)間:2019-07-20 20:07
【摘要】:針對某手機(jī)裝配線產(chǎn)品產(chǎn)能不達(dá)標(biāo)的問題,提出了利用Witness仿真技術(shù)建立裝配線的仿真模型進(jìn)行優(yōu)化研究的方案。首先,利用秒表測時(shí)法收集裝配線各工位操作時(shí)間,并利用Minitab統(tǒng)計(jì)軟件對收集到的數(shù)據(jù)進(jìn)行擬合分析,獲得最優(yōu)擬合參數(shù),同時(shí)對裝配線建立仿真模型,找出瓶頸工位;然后利用Flexible Line Balancing軟件、雙手作業(yè)分析、防錯(cuò)法對瓶頸工位進(jìn)行改善,從而減少了工時(shí)浪費(fèi),降低生產(chǎn)成本,提高產(chǎn)線生產(chǎn)效率。最后再利用Witness軟件對優(yōu)化方案進(jìn)行檢驗(yàn),確保改善效果真實(shí)有效。
[Abstract]:In order to solve the problem that the production capacity of a mobile phone assembly line is not up to standard, a scheme is proposed to establish the simulation model of the assembly line by using Witness simulation technology to optimize the research. Firstly, the operating time of each station in the assembly line is collected by the second meter time measurement method, and the optimal fitting parameters are obtained by using Minitab statistical software to fit and analyze the collected data, and at the same time, the simulation model of the assembly line is established to find out the bottleneck station, and then the bottleneck station is improved by using Flexible Line Balancing software, two-hand operation analysis and error prevention method, thus reducing the waste of working hours, reducing the production cost and improving the production efficiency of the production line. Finally, Witness software is used to test the optimization scheme to ensure that the improvement effect is true and effective.
【作者單位】: 中國礦業(yè)大學(xué)礦業(yè)工程學(xué)院;
【分類號】:TN929.53
本文編號:2516889
[Abstract]:In order to solve the problem that the production capacity of a mobile phone assembly line is not up to standard, a scheme is proposed to establish the simulation model of the assembly line by using Witness simulation technology to optimize the research. Firstly, the operating time of each station in the assembly line is collected by the second meter time measurement method, and the optimal fitting parameters are obtained by using Minitab statistical software to fit and analyze the collected data, and at the same time, the simulation model of the assembly line is established to find out the bottleneck station, and then the bottleneck station is improved by using Flexible Line Balancing software, two-hand operation analysis and error prevention method, thus reducing the waste of working hours, reducing the production cost and improving the production efficiency of the production line. Finally, Witness software is used to test the optimization scheme to ensure that the improvement effect is true and effective.
【作者單位】: 中國礦業(yè)大學(xué)礦業(yè)工程學(xué)院;
【分類號】:TN929.53
【相似文獻(xiàn)】
相關(guān)碩士學(xué)位論文 前2條
1 郭湛皓;基于精益生產(chǎn)的手機(jī)裝配線平衡研究與應(yīng)用[D];南昌大學(xué);2012年
2 羅楊;電視機(jī)裝配線的仿真與工作研究[D];西華大學(xué);2010年