成都地區(qū)TD-LTE高鐵覆蓋方案研究與設(shè)計
[Abstract]:With the rapid construction of high-speed railway in China and the increasing speed of railway train, high-speed railway and inter-city express train have become the choice of more and more business people. Network coverage and network quality are demanded more and more by users. Railway coverage has become the battlefield for operators to show their brand. In this situation, Chengdu began to build high-speed rail LTE network in 2015, striving to lead 4G life, to meet customers' growing data service communication needs, to create a good market environment, and to build TD-LTE quality network. In the process of building TD-LTE base station in Chengdu area, the general macrocellular base station is easy in location, planning and construction because of its complete matching, large space and good sky surface condition. The high-speed railway coverage base station is affected by many factors, such as geographical factors, interference factors, train speed and so on, so it is relatively difficult to build. In this paper, the history and recent development of TD-LTE research at home and abroad are studied. Taking the second 4G project of China Mobile Sichuan Province as an example, the TD-LTE high-speed rail coverage scheme is studied and designed. Firstly, this paper briefly introduces TD-LTE OFDM technology and MIMO technology, analyzes the factors that affect the transmission performance of wireless system in high-speed environment, and two difficult problems of high-speed rail mobile network signal coverage: Doppler frequency shift and overlapped coverage distance. The algorithm of high-speed coverage solution is summarized. Then TD-LTE coverage performance analysis and TD-LTE capacity performance analysis, interference coordination and avoidance methods are analyzed. Then, starting with the basic situation of the project, coverage index and TD-LTE network status quo, this paper analyzes and determines the current project coverage planning plan, including networking mode, frequency selection, coverage scheme, community merging and overlapping coverage distance. Antenna setting scheme, site setting scheme and ENODEB, day feeder system equipment selection. Finally, the paper puts forward the TD-LTE high-speed rail coverage problem in Chengdu area from three aspects: Doppler effect, switch effect and car body loss, and carries out the optimization analysis of TD-LTE high-speed rail coverage planning, the coverage of TD-LTE network and the service grade along the railway line. The throughput coverage along the railway is simulated. The test results show that the design has achieved the expected goal.
【學(xué)位授予單位】:電子科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TN929.53
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 羅新軍;;TD-LTE微小基站應(yīng)用策略及方案[J];電信技術(shù);2017年03期
2 王文成;;TD-LTE CSFB話音解決方案的理論研究[J];中國新通信;2017年04期
3 萬祖雷;;TD-LTE信令分析在網(wǎng)絡(luò)優(yōu)化中的應(yīng)用[J];中國新通信;2017年04期
4 于佳;劉金鎖;蔡世龍;;TD-LTE電力無線專網(wǎng)性能仿真[J];廣東電力;2017年01期
5 彭建;劉剛;許勇;李浩;;四川高鐵TD-LTE網(wǎng)絡(luò)覆蓋解決方案探討[J];通信與信息技術(shù);2016年06期
6 劉建強(qiáng);;TD-LTE地鐵場景網(wǎng)絡(luò)優(yōu)化方法[J];廣東通信技術(shù);2016年09期
7 張宏宇;于立華;;TD-LTE在高鐵環(huán)境下的覆蓋[J];電子技術(shù)與軟件工程;2016年13期
8 唐艷超;;LTE高鐵覆蓋解決方案研究[J];郵電設(shè)計技術(shù);2014年12期
9 王世魁;杜蔚;;如何構(gòu)建高鐵場景下最佳TD-LTE組網(wǎng)方案[J];通信世界;2014年25期
10 唐飛雄;;高速鐵路TD-LTE網(wǎng)絡(luò)覆蓋關(guān)鍵問題探討[J];電信工程技術(shù)與標(biāo)準(zhǔn)化;2013年07期
相關(guān)碩士學(xué)位論文 前8條
1 王子瑞;高速鐵路環(huán)境下LTE覆蓋與容量優(yōu)化研究[D];蘭州交通大學(xué);2016年
2 張文婷;LTE高鐵網(wǎng)絡(luò)覆蓋組網(wǎng)解決方案研究與應(yīng)用[D];吉林大學(xué);2015年
3 詹強(qiáng);高鐵環(huán)境下LTE切換技術(shù)的研究與應(yīng)用[D];蘭州交通大學(xué);2014年
4 唐亞平;無線電波傳播損耗預(yù)測方法與應(yīng)用研究[D];南京航空航天大學(xué);2014年
5 王雷;高鐵站綜合體復(fù)合功能的一體化設(shè)計研究[D];北京交通大學(xué);2013年
6 莊文芹;MIMO系統(tǒng)信道容量的研究與分析[D];南京郵電大學(xué);2012年
7 張斌;TD-LTE無線網(wǎng)絡(luò)規(guī)劃關(guān)鍵技術(shù)研究[D];南京郵電大學(xué);2012年
8 陳康;我國高速鐵路客站建筑設(shè)計初探[D];北京交通大學(xué);2009年
,本文編號:2135996
本文鏈接:http://sikaile.net/kejilunwen/xinxigongchenglunwen/2135996.html