長距離重力流輸水工程的關(guān)閥方案優(yōu)化
[Abstract]:In view of a typical long-distance gravity flow project, the numerical simulation is carried out by using the characteristic line method, and an improved two-stage folding line valve closing scheme is obtained, and the comparison analysis is made for the valve closing of two sections and the improved two-stage folding line closing scheme. The results show that the improved two-stage folding valve closing scheme can not only reduce the reaction time of the system effectively in case of accident, but also reduce the pressure of water hammer and increase the safety margin of water supply system.
【作者單位】: 河海大學水利水電學院;
【基金】:國家重點研發(fā)計劃項目(2016YFC0401800)
【分類號】:TV67
【相似文獻】
相關(guān)期刊論文 前10條
1 賈永軍;;新疆某輸水工程管材的選用[J];西北水電;2012年04期
2 劉琪;馬芳;;加泥式土壓平衡盾構(gòu)技術(shù)在輸水工程中的應(yīng)用[J];城鎮(zhèn)供水;2010年01期
3 陳萬敏;;山區(qū)輸水工程管材選擇探討[J];珠江水運;2013年09期
4 高英峰;;輸水工程興油路過路鋼管施工方法[J];黑龍江水利科技;2014年01期
5 向新國;唐虎;;阿拉山口供水與生態(tài)建設(shè)輸水工程綜述[J];新疆水利;2006年06期
6 孫淑敏;;引大入港輸水工程管道水壓試驗設(shè)計與研究[J];河北水利;2007年06期
7 劉小進;王黎明;陳艷芳;;淄博市引太入張輸水工程關(guān)鍵技術(shù)應(yīng)用[J];山東水利;2012年09期
8 李晉林;;大伙房水庫輸水工程預應(yīng)力鋼筒混凝土管材制造質(zhì)量控制[J];山西水利科技;2008年02期
9 孫桂蓮;周國宏;胡守銀;;變頻技術(shù)在引大入港輸水工程中的應(yīng)用[J];河北水利;2010年06期
10 陳濟生;埃及地下穿蘇伊士運河輸水工程[J];水利水電快報;1996年22期
相關(guān)會議論文 前4條
1 趙常玲;馬成;姜現(xiàn)彩;;跨流域輸水工程襯砌破壞機理及對策[A];山東水利科技論壇2006[C];2006年
2 侯俊華;肖濤;任龍岐;;關(guān)于大伙房水庫輸水工程持續(xù)發(fā)揮作用的建議[A];節(jié)能環(huán)保 和諧發(fā)展——2007中國科協(xié)年會論文集(三)[C];2007年
3 高菊如;吔ù,
本文編號:2505443
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2505443.html