引漢濟渭椒溪河隧洞施工通風數(shù)值模擬
[Abstract]:In order to alleviate the problem of urban and industrial water shortage along the Weihe River in Guanzhong, Shaanxi Province proposed a large-scale water conservancy project from Hanjiang River to Weihe River Basin in order to alleviate the problem of urban and industrial water shortage along the Weihe River in Shaanxi Province. The Jiaoxi reach project is a cross-river section, the topography and geology are relatively complex, and the ventilation problem during tunnel construction is also relatively serious. The ventilation process of tunnel with branch tunnel is simulated by CFD (Computational Fluid Dynamics) numerical simulation method. The variation of flow field and concentration field with time during construction period is studied under several typical working conditions, and the influence of vortex on air flow and harmful gas distribution in palm surface and branch tunnel is analyzed. When the air flow distribution channel is not smooth, the size and position of the vortex in the vortex area near the palm surface change periodically, and the influence range decreases gradually with the increase of ventilation time. The harmful gases and soot produced by tunnel blasting will move and spread with the flow of air flow, and will be gradually discharged out of the hole. Through the study of the exhaust process of air flow and harmful gas in the main tunnel and branch tunnel of the tunnel, it is concluded that the vortex zone is formed near the palm surface of the tunnel under the action of ventilation and at the intersection position between the branch tunnel and the main tunnel. The generation and change of the vortex continuously consume the mechanical energy of ventilation, reduce the ventilation efficiency, and cause a certain blocking effect on the drainage of harmful gases. The drainage process of harmful gases in the tunnel includes movement and diffusion. The CO is discharged outside the tunnel in the process of movement, and the peak value of CO in the tunnel is continuously reduced in the diffusion process. The time to reach the safe concentration in the tunnel under different working conditions is summarized, and some reference suggestions for the construction progress of the tunnel are given.
【作者單位】: 西安理工大學西北旱區(qū)生態(tài)水利工程國家重點實驗室培育基地;
【基金】:國家自然科學基金(51679197) 陜西省重點科技創(chuàng)新團隊(2013KCT-015)~~
【分類號】:TV554
【相似文獻】
相關期刊論文 前10條
1 張亞蓮;丁娟蘭;;隧洞施工中線放樣三角坐標法簡析[J];科學咨詢(決策管理);2008年06期
2 祝晗英;;小斷面長隧洞施工中常見問題與處理措施[J];陜西水利;2009年02期
3 高曉猛;;談水利工程隧洞施工管理[J];黑龍江科技信息;2012年28期
4 劉宏超;劉貴雄;;引漢濟渭隧洞施工若干技術問題探討[J];電網(wǎng)與清潔能源;2012年11期
5 ;各國修建的一些大型隧洞施工資料[J];人民長江;1965年02期
6 肖曉桂;隧洞施工成套設備[J];水利水電快報;1996年11期
7 李勝勇;紅巖隧洞病害整治方案探索[J];四川水利;2000年06期
8 車天發(fā);少陵塬隧洞施工降水規(guī)律的試驗研究[J];地下水;2001年02期
9 周清,孫博,吳中偉;“新奧法”在東江—深圳供水改造工程觀音山隧洞施工中的應用[J];華北水利水電學院學報;2001年04期
10 白濤,成曉云;三維雙程導線重復測量在隧洞施工控制中的應用[J];西北水力發(fā)電;2002年02期
相關會議論文 前7條
1 和再良;錢東宏;;羅碧電站隧洞的施工監(jiān)測及設計反饋[A];全國巖石邊坡、地下工程、地基基礎監(jiān)測及處理技術學術會議論文選集[C];1993年
2 邵正權;羅毅;;隧洞施工中涌水問題的預防與處理[A];水與水技術(第3輯)[C];2013年
3 祈寧春;;高壓大涌水、高地應力隧洞施工技術探索——錦屏水電站輔助洞施工[A];中國巖石力學與工程實例第一屆學術會議論文集[C];2007年
4 吳靜;葛浩然;;軟弱破碎地質條件下的隧洞施工[A];2008中國水力發(fā)電論文集[C];2008年
5 王高榮;;淺談放水隧洞開挖施工方法與管理[A];2013年4月建筑科技與管理學術交流會論文集[C];2013年
6 劉斌;李衛(wèi)兵;;TBM隧洞施工超前地質預報方法對比分析[A];中國水利學會地基與基礎工程專業(yè)委員會第十一次全國學術技術研討會論文集[C];2011年
7 羅西北;李志超;;南水北調西線跨流域調水的市場化運作與高埋深長隧洞施工技術問題[A];中國水利學會2001學術年會論文集[C];2001年
相關重要報紙文章 前10條
1 通訊員 郝繼峰;上游線隧洞盾構機正式掘進[N];中國水利報;2008年
2 裴景峰;太重隧洞管道安裝車及技術通過鑒定 [N];中國冶金報;2002年
3 本報記者 郭純 畢鵬飛;蘇子河畔的舞龍者[N];中國水利報;2008年
4 姜書范 伍振 楊勇;為了莊嚴的承諾[N];中國鐵道建筑報;2009年
5 本報記者 楊秀權 通訊員 劉培榮;用抗災精神搞復建[N];中國鐵道建筑報;2009年
6 本報通訊員 湯少林;引紅濟石:高科技支撐快進度[N];中國水利報;2009年
7 ;跨越鑄精品 卓越創(chuàng)一流[N];中國水利報;2008年
8 記者 李錦蘭;世界最先進掘進機首進云南[N];云南經(jīng)濟日報;2003年
9 周安才;大川水電站:一段難忘的經(jīng)歷[N];經(jīng)理日報;2009年
10 記者 王永鋒 通訊員 任文吉;佛坪:一條河堤保護了全縣三分之一人口[N];陜西日報;2011年
相關碩士學位論文 前4條
1 王鵬;層狀圍巖隧洞施工爆破數(shù)值模擬分析[D];新疆農(nóng)業(yè)大學;2013年
2 姚曉明;TBM在超長隧洞施工方法研究[D];西南交通大學;2011年
3 張克強;盾構技術在黃土隧洞施工中的應用研究[D];西安理工大學;2004年
4 黃柏洪;巖體全斷面隧洞施工技術及支護方案研究[D];河海大學;2006年
,本文編號:2502179
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2502179.html