入庫(kù)徑流預(yù)報(bào)誤差分析及在水庫(kù)群短期發(fā)電調(diào)度中的應(yīng)用
[Abstract]:The error distribution law of runoff forecasting in reservoir is quantitatively analyzed by selecting the appropriate distribution form, and on this basis, the risk estimation of short-term power generation operation of hydropower station reservoir group is carried out. It has important theoretical significance and practical application value for improving the economic benefit of short-term power generation operation of hydropower station reservoir group. In this paper, the advantages of Bayesian, maximum entropy and Markov chain Monte Carlo are combined organically, and the Bayesian maximum entropy (MBME) method based on Markov chain Monte Carlo is established. Secondly, the MBME method is applied to the analysis of runoff forecasting error, and a runoff forecasting error distribution model based on MBME method is established. The model is applied to the study of the runoff error distribution law of three reservoirs in Jinguan Power supply Group. At the same time, considering the influence of abundant and dry variation of runoff on its distribution law, the posterior distribution function of runoff prediction error in different periods and different prediction periods of different runoff series is obtained, and the posterior distribution function of runoff prediction error is obtained by means of prior distribution. The theoretical normal distribution and the histogram of error samples are compared and analyzed, and the rationality and feasibility of the model are verified. Finally, considering the influence of runoff forecasting error on short-term power generation operation of hydropower station reservoir group, the risk is quantitatively estimated by using risk rate and opportunity loss. The risk estimation model of short-term power generation operation of hydropower station reservoir group considering the prediction error of reservoir runoff is established, and the risk of short-term power generation operation of hydropower station reservoir group considering the prediction error of reservoir runoff is estimated and quantified with an example. It provides an important theoretical basis and decision-making basis for reservoir operation departments.
【學(xué)位授予單位】:華北電力大學(xué)(北京)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2016
【分類(lèi)號(hào)】:TV697.12
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張超,,邢毅,黃子平;水庫(kù)群開(kāi)發(fā)多指標(biāo)評(píng)價(jià)層次分析模型及應(yīng)用[J];水利水運(yùn)科學(xué)研究;1996年02期
2 呂穎;水庫(kù)群管理體制的實(shí)踐與探索[J];水利科技;1997年04期
3 楊大卓;小型水庫(kù)群蓄水變量的計(jì)算方法[J];東北水利水電;2003年04期
4 董福平;淺論日本h木縣那珂川水系水庫(kù)群的管理[J];浙江水利科技;2005年02期
5 宋文樹(shù);;人類(lèi)活動(dòng)對(duì)水文效應(yīng)的影響分析[J];中國(guó)集體經(jīng)濟(jì)(下半月);2007年07期
6 伍宏中;白以昕;;水電站水庫(kù)群長(zhǎng)期運(yùn)行優(yōu)化模型和應(yīng)用[J];水力發(fā)電;2008年01期
7 馮本凡;蘇鐳;呂美華;洪寶祝;王志藝;;汀溪水庫(kù)群綜合整治對(duì)策與措施[J];水利科技;2008年02期
8 陳廣才;;長(zhǎng)江干支流水庫(kù)群綜合調(diào)度的多利益主體協(xié)調(diào)框架探討[J];長(zhǎng)江科學(xué)院院報(bào);2011年12期
9 溫進(jìn)化;張松達(dá);夏夢(mèng)河;;水庫(kù)群和河網(wǎng)聯(lián)合調(diào)度模型研究[J];安徽農(nóng)業(yè)科學(xué);2012年16期
10 張立明;劉文軍;馬秀梅;萬(wàn)太斌;國(guó)洪琴;;水庫(kù)群防洪聯(lián)合調(diào)度研究現(xiàn)狀與展望[J];中國(guó)水運(yùn)(下半月);2012年05期
相關(guān)會(huì)議論文 前7條
1 蘇鐳;;汀溪水庫(kù)群防洪保安措施的探討[A];福建省第十三屆水利水電青年學(xué)術(shù)交流會(huì)論文集[C];2009年
2 馮本凡;蘇鐳;呂美華;洪寶祝;王志藝;;汀溪水庫(kù)群綜合整治對(duì)策與措施[A];福建省科協(xié)第八屆學(xué)術(shù)年會(huì)水利分會(huì)論文集[C];2008年
3 馮本凡;呂美華;蘇鐳;洪寶祝;王志藝;;淺談汀溪水庫(kù)群綜合整治的對(duì)策與措施[A];福建省第十一屆水利水電青年學(xué)術(shù)交流會(huì)論文集[C];2007年
4 陳智;;大型水庫(kù)群防汛抗旱優(yōu)化調(diào)度網(wǎng)絡(luò)系統(tǒng)[A];中國(guó)水利學(xué)會(huì)2003學(xué)術(shù)年會(huì)論文集[C];2003年
5 張松達(dá);溫進(jìn)化;夏夢(mèng)河;;水庫(kù)群以及水庫(kù)與河網(wǎng)聯(lián)合調(diào)度實(shí)踐與探討[A];中國(guó)原水論壇專(zhuān)輯[C];2010年
6 程春田;王本德;陳守煜;;并聯(lián)水庫(kù)群防洪聯(lián)合調(diào)度系統(tǒng)模糊優(yōu)化模型[A];1995中國(guó)控制與決策學(xué)術(shù)年會(huì)論文集[C];1995年
7 張金良;;黃河中游水庫(kù)群水沙聯(lián)合調(diào)度所涉及的范疇[A];中國(guó)水利學(xué)會(huì)2005學(xué)術(shù)年會(huì)論文集——水旱災(zāi)害風(fēng)險(xiǎn)管理[C];2005年
相關(guān)重要報(bào)紙文章 前6條
1 殷磊;汀溪水庫(kù)群綜合整治拉開(kāi)帷幕[N];廈門(mén)日?qǐng)?bào);2008年
2 于安民 李亞龍 鄭占奎 黑龍江省黑河水文局;水庫(kù)群怎樣蓄放水最優(yōu)?[N];中國(guó)水利報(bào);2008年
3 特約記者 付彬 通訊員 王孟;百余領(lǐng)導(dǎo)專(zhuān)家學(xué)者共謀長(zhǎng)江保護(hù)與發(fā)展[N];人民長(zhǎng)江報(bào);2012年
4 本報(bào)記者 殷磊 實(shí)習(xí)生 黃河;廈門(mén)市民將喝上清甜水庫(kù)水[N];廈門(mén)日?qǐng)?bào);2009年
5 本報(bào)記者 朱俊君 周瑾 特約通訊員 廖鴻志;“短板”之慮[N];人民長(zhǎng)江報(bào);2011年
6 記者 魏星;強(qiáng)化責(zé)任做足預(yù)案科學(xué)調(diào)度 全力做好今年防汛各項(xiàng)工作[N];江西日?qǐng)?bào);2014年
相關(guān)博士學(xué)位論文 前10條
1 孫平;改進(jìn)蛙跳算法及水庫(kù)群優(yōu)化調(diào)度模型研究[D];華北電力大學(xué);2015年
2 李昱;復(fù)雜水庫(kù)群供水優(yōu)化調(diào)度方法及應(yīng)用研究[D];大連理工大學(xué);2016年
3 范繼輝;梯級(jí)水庫(kù)群調(diào)度模擬及其對(duì)河流生態(tài)環(huán)境的影響[D];中國(guó)科學(xué)院研究生院(成都山地災(zāi)害與環(huán)境研究所);2007年
4 裴哲義;大型流域水電站水庫(kù)群聯(lián)合優(yōu)化調(diào)度及風(fēng)險(xiǎn)分析[D];華北電力大學(xué);2012年
5 顧巍;基于分布估計(jì)算法的水庫(kù)群聯(lián)合優(yōu)化調(diào)度研究[D];華中科技大學(xué);2013年
6 王德智;供水庫(kù)群優(yōu)化調(diào)度的計(jì)算智能方法及應(yīng)用研究[D];河海大學(xué);2007年
7 彭安幫;跨流域水庫(kù)群引水與供水聯(lián)合優(yōu)化調(diào)度研究[D];大連理工大學(xué);2015年
8 彭勇;中長(zhǎng)期水文預(yù)報(bào)與水庫(kù)群優(yōu)化調(diào)度方法及其系統(tǒng)集成研究[D];大連理工大學(xué);2007年
9 歐陽(yáng)碩;流域梯級(jí)及全流域巨型水庫(kù)群洪水資源化聯(lián)合優(yōu)化調(diào)度研究[D];華中科技大學(xué);2014年
10 徐煒;考慮中期徑流預(yù)報(bào)及其不確定性的水庫(kù)群發(fā)電優(yōu)化調(diào)度模型研究[D];大連理工大學(xué);2014年
相關(guān)碩士學(xué)位論文 前10條
1 武蘭婷;基于徑流模擬的水庫(kù)群聯(lián)合供水風(fēng)險(xiǎn)分析[D];昆明理工大學(xué);2015年
2 楊立疆;基于周期序貫決策的水庫(kù)群多目標(biāo)優(yōu)化調(diào)度研究[D];中國(guó)水利水電科學(xué)研究院;2015年
3 張琦;面向生態(tài)的遼河流域水庫(kù)群與引水工程聯(lián)合調(diào)度研究[D];大連理工大學(xué);2015年
4 劉娜;跨流域水庫(kù)群聯(lián)合優(yōu)化調(diào)度應(yīng)用研究[D];大連理工大學(xué);2015年
5 何洋;入庫(kù)徑流預(yù)報(bào)誤差分析及在水庫(kù)群短期發(fā)電調(diào)度中的應(yīng)用[D];華北電力大學(xué)(北京);2016年
6 狄艷艷;融江流域水庫(kù)群調(diào)度運(yùn)行系統(tǒng)應(yīng)用研究[D];河海大學(xué);2004年
7 黃程鵬;龍王山水庫(kù)群洪水預(yù)報(bào)方法研究與應(yīng)用[D];武漢大學(xué);2005年
8 周苗菲;小水庫(kù)群梯級(jí)聯(lián)合調(diào)度研究與應(yīng)用[D];華北電力大學(xué)(北京);2011年
9 何振鋒;通用型水庫(kù)群優(yōu)化調(diào)度系統(tǒng)分析與設(shè)計(jì)[D];華中科技大學(xué);2006年
10 趙明華;牡丹江流域水庫(kù)群優(yōu)化調(diào)度研究[D];西安理工大學(xué);2008年
本文編號(hào):2491508