石洞水庫三維模型創(chuàng)建與模型信息應(yīng)用研究
[Abstract]:The establishment of 3D model is the basis of BIM technology, the application of model information is the core of BIM technology, and there are many applications of model information. In this paper, three aspects of research work have been done. Based on the preliminary design of Shidong Reservoir in Jiangxi Province, the three-dimensional modeling of earth-rock dam, spillway and diversion tunnel is carried out by using AutoRevit. (1) the engineering drawings are generated by section view and view tool, so that the three-dimensional model can be linked with the two-dimensional drawings; (2) the plug-in is compiled by C # language, and the engineering quantity of 3D model is counted automatically, and the bill of quantities and budget are generated in combination with Excel budget table, so that the linkage relationship between 3D model and budget estimate can be established. (3) through the program compiled by VB language and the construction schedule automatically counting the human material machine resource plan in each period, the linkage relationship between the man material machine resource plan and the three-dimensional model is established. "moving in one place, moving everywhere" is the biggest characteristic of AutoRevit. The modification of the model will lead to the change of engineering drawings, budget and human material machine resource plan. The specific research contents and achievements are as follows: (1) referring to the modeling method of Revit software in the field of construction engineering, the creation of earth-rock dam, spillway and diversion tunnel of Shidong Reservoir is completed by creating "loadable family". The information integration of all families is completed, which enriches the family library of water conservancy project. (2) it provides 3D visual management of earth-rock dam, spillway and diversion tunnel project, and marks its three views and sections. The generation of engineering drawings is conducive to the accurate construction of the construction party. The linkage of information between drawings is formed, and the modification of any graph can be transmitted to other graphics in both directions, which maintains the consistency of graphics. (3) the plug-in of AutoRevit is programmed with C # language to extract the attribute information and geometric size information of model components. Carry out the statistics of the engineering quantity and pass it to the Excel table. Through the division of the project, the bill of quantities is formed, and the total investment of the project is generated by applying the quota to calculate the unit price and various expenses of the project. In this process, the bill of quantities can be automatically generated and the project can be divided automatically. At the same time, the linkage relationship between the table and the three-dimensional model is established, and the change of the model can be passed to the table. Always keep the consistency between the model and the budget table. (4) after the partial project in the bill of quantities is linked to the corresponding project unit price, the construction schedule of the partial project is linked to the engineering unit price analysis table. Using VB language programming, according to the construction arrangement of each sub-project, combined with the engineering quantity of each project, the consumption of labor, material and machinery in each time period is counted, that is, the resource planning arrangement in the construction organization. Since the budget estimate Excel table has established a dynamic correlation with the 3D model, the association of the construction organization planning arrangement based on the 3D model has actually been established.
【學(xué)位授予單位】:華北水利水電大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TV62;TV51-39
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 牛立軍;國珍珍;;某水庫岸邊溢洪道建筑信息模型應(yīng)用探討[J];科技創(chuàng)新與應(yīng)用;2017年04期
2 卜娜琰;;基于BIM的建設(shè)工程全過程造價管理研究[J];建設(shè)科技;2016年13期
3 馮旭;;水利水電工程可視化仿真中BIM技術(shù)的應(yīng)用分析[J];自動化與儀器儀表;2016年03期
4 彭蔚;;BIM在建設(shè)工程造價管理中的適用性分析[J];工程經(jīng)濟(jì);2015年06期
5 張連營;于飛;;基于BIM的建筑工程項目進(jìn)度-成本協(xié)同管理系統(tǒng)框架構(gòu)建[J];項目管理技術(shù);2014年12期
6 苗倩;;BIM技術(shù)在水利水電工程可視化仿真中的應(yīng)用[J];水電能源科學(xué);2012年10期
7 靳家佳;;建筑信息模型在建設(shè)工程項目中的應(yīng)用模式研究[J];數(shù)字技術(shù)與應(yīng)用;2012年08期
8 何清華;錢麗麗;段運峰;李永奎;;BIM在國內(nèi)外應(yīng)用的現(xiàn)狀及障礙研究[J];工程管理學(xué)報;2012年01期
9 李建成;;建筑信息模型與建筑設(shè)計無紙化[J];建筑學(xué)報;2009年11期
10 傅筱;;建筑信息模型帶來的設(shè)計思維和方法的轉(zhuǎn)型[J];建筑學(xué)報;2009年01期
相關(guān)博士學(xué)位論文 前5條
1 趙繼偉;水利工程信息模型理論與應(yīng)用研究[D];中國水利水電科學(xué)研究院;2016年
2 杜成波;水利水電工程信息模型研究及應(yīng)用[D];天津大學(xué);2014年
3 李勇;建設(shè)工程施工進(jìn)度BIM預(yù)測方法研究[D];武漢理工大學(xué);2014年
4 趙雪鋒;建設(shè)工程全面信息管理理論和方法研究[D];北京交通大學(xué);2010年
5 張洋;基于BIM的建筑工程信息集成與管理研究[D];清華大學(xué);2009年
相關(guān)碩士學(xué)位論文 前2條
1 韓啟超;基于風(fēng)險理念的水利樞紐工程全生命周期信息管理[D];天津大學(xué);2012年
2 曾巧;基于SketchUp中小型平原水閘建筑信息模型研究[D];內(nèi)蒙古農(nóng)業(yè)大學(xué);2009年