引漢濟(jì)渭工程秦嶺輸水隧洞4~#施工支洞巖爆預(yù)測及預(yù)防處理措施
[Abstract]:The buried depth of Qinling water conveyance tunnel is very large and rock burst often occurs during excavation. In order to reduce the damage caused by rock burst to people and equipment, the micro-earthquake monitoring technology of Dalian University of Technology was introduced into the 4 # hole to carry out the test of advance detection and prediction, and to strengthen the support and the advance support of the predicted parts where the rock stress was concentrated. A total of 17 micro-earthquake monitoring and prediction reports were sent, of which 4 minor rockburst and 4 moderate rockburst were accurately predicted, with an accuracy of about 50%. Through encryption detection, the accuracy can reach 71%, can greatly reduce the occurrence of security accidents. The stress of the palm surface can be released and eliminated by blasting. If supporting in advance and strengthening support in later stage, the preventive effect can be achieved, but there is also a certain risk. According to the field practice, the prediction, prevention and reinforcement measures can improve the stress distribution in rock mass to a certain extent, and adjust the stress distribution after excavation. However, this method is only suitable for drilling and blasting construction, and it is very difficult to make relevant prevention for the working face of TBM construction, because there is no way to release the advance stress and advance the support at present.
【作者單位】: 陜西省引漢濟(jì)渭工程建設(shè)有限公司;
【基金】:國家重點(diǎn)研發(fā)計(jì)劃項(xiàng)目(2016YFC0401802) 2013年陜西省科技統(tǒng)籌創(chuàng)新工程計(jì)劃項(xiàng)目(2013KTZB-03-01-01)
【分類號(hào)】:TV554
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 張鐵牛;;某裝配式無壓輸水隧洞的結(jié)構(gòu)破壞分析[J];農(nóng)田水利與小水電;1992年02期
2 沈思東;;水利輸水隧洞工程施工安全管理存在的隱患與應(yīng)對(duì)措施初探[J];法制與經(jīng)濟(jì)(中旬);2014年02期
3 秦樹春;仰拱先行法在輸水隧洞中的應(yīng)用[J];西部探礦工程;2000年06期
4 曾建雄;地表鉆孔注漿封堵裂隙涌水在輸水隧洞中的實(shí)施淺析[J];隧道建設(shè);2000年02期
5 梅傳書,鐘登華,徐海燕;輸水隧洞建設(shè)方案優(yōu)選方法的研究[J];工程建設(shè)與設(shè)計(jì);2001年03期
6 沈俊亭;;小斷面輸水隧洞快速施工[J];水利水電施工;2001年01期
7 左建;綿羊沖水庫西輸水隧洞工程施工質(zhì)量控制與評(píng)價(jià)[J];云南水力發(fā)電;2002年S1期
8 樂國成;貴陽西郊水廠輸水隧洞砼缺陷原因分析及處理[J];西部探礦工程;2003年10期
9 梁淼;某輸水隧洞施工方案設(shè)計(jì)實(shí)例[J];廣東土木與建筑;2004年10期
10 吳立新;;高壓輸水隧洞滲漏的處理與思考[J];小水電;2009年03期
相關(guān)會(huì)議論文 前10條
1 李蓉;;“引洱入賓”老青山輸水隧洞注漿止水工程[A];中國錨固與注漿工程實(shí)錄選[C];1995年
2 高印軍;張金安;;某市引黃干渠4~#輸水隧洞冒頂塌方加固[A];2002年水利水電地基與基礎(chǔ)工程學(xué)術(shù)會(huì)議論文集[C];2002年
3 崔煒;韓宇;李雪春;付云升;陳重華;;公路下輸水隧洞岔洞結(jié)構(gòu)淺埋暗挖施工的三維有限元模擬[A];中國交通土建工程學(xué)術(shù)論文集(2006)[C];2006年
4 賈明輝;沈杰;鄭陳昊;;輸水隧洞工程結(jié)構(gòu)設(shè)計(jì)分析[A];中國土木工程學(xué)會(huì)第十二屆年會(huì)暨隧道及地下工程分會(huì)第十四屆年會(huì)論文集[C];2006年
5 邱東明;宗敏;王仕虎;薛濤;;上置式針梁鋼模在惠蓄電站輸水隧洞中的研究與應(yīng)用[A];抽水蓄能電站工程建設(shè)文集(2011)[C];2011年
6 張騰飛;楊軍盛;安尊鵬;;淺析壩盤水電站輸水隧洞設(shè)計(jì)[A];貴州省巖石力學(xué)與工程學(xué)會(huì)2008年學(xué)術(shù)年會(huì)論文集[C];2008年
7 邱東明;宗敏;王仕虎;薛濤;;上置式針梁鋼模在惠蓄電站輸水隧洞中的研究與應(yīng)用[A];抽水蓄能電站工程建設(shè)文集2011[C];2011年
8 楊宏偉;范益群;;盾構(gòu)輸水隧洞雙層襯砌受力變形分析[A];2009中國城市地下空間開發(fā)高峰論壇論文集[C];2009年
9 吳鴻慶;張克華;任俠;楊文奇;劉世忠;賈忠全;馬嘯飛;盧學(xué)禮;;引大入秦輸水隧洞管片式襯砌結(jié)構(gòu)的研究[A];中國土木工程學(xué)會(huì)隧道及地下工程學(xué)會(huì)第九屆年會(huì)論文集[C];1996年
10 徐穎;;光爆技術(shù)在竹林寺水庫輸水隧洞工程施工中的應(yīng)用[A];第四屆十三省區(qū)市機(jī)械工程學(xué)會(huì)科技論壇暨2008海南機(jī)械科技論壇論文集[C];2008年
相關(guān)重要報(bào)紙文章 前9條
1 通訊員劉輝;青河阿葦灌區(qū)輸水隧洞取得新突破[N];伊犁日?qǐng)?bào)(漢);2011年
2 記者 高俊 通訊員 齊曉賽 楊三柱;亞洲最長輸水隧洞開工[N];中國鐵道建筑報(bào);2011年
3 記者 蘇毅;輸水隧洞施工沖刺最后43米[N];長沙晚報(bào);2010年
4 通訊員 孫小輝;阿葦灌區(qū)輸水隧洞工程有序推進(jìn)[N];阿勒泰日?qǐng)?bào)(漢);2010年
5 記者 高虹 通訊員 祁家瓊;海南最長輸水隧洞貫通[N];海南日?qǐng)?bào);2010年
6 記者 林琳 通訊員 馮建喜;我省首次引進(jìn)TBM掘進(jìn)機(jī)開挖 輸水隧洞取得重大進(jìn)展[N];陜西日?qǐng)?bào);2010年
7 孫愛霞;我省引大濟(jì)湟工程已完成投資近2億元[N];青海日?qǐng)?bào);2010年
8 通訊員 劉棟;神木供水工程通水[N];中國鐵道建筑報(bào);2010年
9 記者 白秀喜 通訊員 劉棟;陜西神木大型供水工程建成通水[N];中國建設(shè)報(bào);2010年
相關(guān)碩士學(xué)位論文 前9條
1 胡能明;耦合滲流場的TBM輸水隧洞三維有限元分析[D];天津大學(xué);2014年
2 凌金龍;閘門局開時(shí)輸水隧洞的水力特性研究[D];大連理工大學(xué);2016年
3 陸芳芳;云南省馬龍縣車馬碧水庫輸水隧洞圍巖穩(wěn)定性評(píng)價(jià)[D];昆明理工大學(xué);2016年
4 黃懷寧;輸水隧洞預(yù)應(yīng)力混凝土管片襯砌設(shè)計(jì)方法研究[D];北京交通大學(xué);2013年
5 易立;輸水隧洞工程錨噴設(shè)計(jì)技術(shù)研究及應(yīng)用[D];河海大學(xué);2006年
6 周云晴;輸水隧洞TBM施工進(jìn)度分析與實(shí)時(shí)控制研究[D];天津大學(xué);2008年
7 張婷;長大輸水隧洞檢修期自然通風(fēng)CFD模擬研究[D];天津大學(xué);2012年
8 羅毅;變水頭無壓輸水隧洞水流特性及洞內(nèi)消能研究[D];大連理工大學(xué);2014年
9 袁光胤;TBM技術(shù)在輸水隧洞工程中的應(yīng)用[D];西安理工大學(xué);2007年
,本文編號(hào):2452746
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2452746.html