雙護盾TBM掘進速度的影響因素研究
發(fā)布時間:2019-03-16 11:13
【摘要】:以甘肅引洮一期工程9#隧洞為例,綜合引入多層線性模型及數量化理論I的建模原理,在初始設置的解釋變量基礎上,通過逐步刪除不顯著解釋變量的方法,建立了兩層線性模型,對雙護盾TBM的掘進速度的影響因素進行了研究。通過計算模型各解釋變量固定效應的參數估計值,定量闡述了各因素對掘進速度的直接和間接影響,并依據模型的參數估計值結果對未來TBM的更好施工提出建議。通過預測模型和實例應用兩方面分析、證明了該模型應用的可靠性,為同類工程掘進速度的合理預測和施工進度有效控制提供了理論依據。
[Abstract]:Taking the No. 9 tunnel of Yintao Phase I Project in Gansu Province as an example, the modeling principle of multi-layer linear model and quantitative theory I is introduced. On the basis of the initial set-up of the explanatory variables, the method of gradually deleting the inconspicuous explanatory variables is carried out. In this paper, a two-layer linear model is established to study the influencing factors of tunneling speed of TBM with double shields. By calculating the parameter estimation values of the fixed effect of each explanatory variable in the model, the direct and indirect effects of each factor on the tunneling speed are described quantitatively. According to the results of the model's parameter estimation, suggestions for better construction of TBM in the future are put forward. The reliability of the model is proved through the analysis of prediction model and practical application, which provides a theoretical basis for reasonable prediction of excavation speed and effective control of construction schedule for similar projects.
【作者單位】: 甘肅農業(yè)大學工學院;中國水利水電第四工程局;
【基金】:國家批復引洮工程科學研究試驗基金(YT374-ZX33-09107)
【分類號】:TV554
本文編號:2441219
[Abstract]:Taking the No. 9 tunnel of Yintao Phase I Project in Gansu Province as an example, the modeling principle of multi-layer linear model and quantitative theory I is introduced. On the basis of the initial set-up of the explanatory variables, the method of gradually deleting the inconspicuous explanatory variables is carried out. In this paper, a two-layer linear model is established to study the influencing factors of tunneling speed of TBM with double shields. By calculating the parameter estimation values of the fixed effect of each explanatory variable in the model, the direct and indirect effects of each factor on the tunneling speed are described quantitatively. According to the results of the model's parameter estimation, suggestions for better construction of TBM in the future are put forward. The reliability of the model is proved through the analysis of prediction model and practical application, which provides a theoretical basis for reasonable prediction of excavation speed and effective control of construction schedule for similar projects.
【作者單位】: 甘肅農業(yè)大學工學院;中國水利水電第四工程局;
【基金】:國家批復引洮工程科學研究試驗基金(YT374-ZX33-09107)
【分類號】:TV554
【相似文獻】
相關期刊論文 前5條
1 王潔;TBM在不同特性硬巖中的掘進速度[J];隧道建設;2002年03期
2 袁興澤;李文富;趙玉輝;;TBM掘進速度及影響因素淺析[J];水利建設與管理;2009年04期
3 吳水鋒;吳水平;;如何提高煤礦巷道光面爆破掘進速度[J];科學之友;2013年01期
4 李良忠;;淺析槽子“炸死”的危害和解決辦法[J];爆破器材;1983年04期
5 ;[J];;年期
相關會議論文 前1條
1 李潮;丁靖洋;鄭長江;周宏偉;;塌方區(qū)域對TBM掘進速度的影響[A];北京力學會第18屆學術年會論文集[C];2012年
,本文編號:2441219
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2441219.html