【摘要】:以甘肅引洮一期工程9#隧洞為例,綜合引入多層線性模型及數(shù)量化理論I的建模原理,在初始設(shè)置的解釋變量基礎(chǔ)上,通過逐步刪除不顯著解釋變量的方法,建立了兩層線性模型,對(duì)雙護(hù)盾TBM的掘進(jìn)速度的影響因素進(jìn)行了研究。通過計(jì)算模型各解釋變量固定效應(yīng)的參數(shù)估計(jì)值,定量闡述了各因素對(duì)掘進(jìn)速度的直接和間接影響,并依據(jù)模型的參數(shù)估計(jì)值結(jié)果對(duì)未來TBM的更好施工提出建議。通過預(yù)測(cè)模型和實(shí)例應(yīng)用兩方面分析、證明了該模型應(yīng)用的可靠性,為同類工程掘進(jìn)速度的合理預(yù)測(cè)和施工進(jìn)度有效控制提供了理論依據(jù)。
[Abstract]:Taking the No. 9 tunnel of Yintao Phase I Project in Gansu Province as an example, the modeling principle of multi-layer linear model and quantitative theory I is introduced. On the basis of the initial set-up of the explanatory variables, the method of gradually deleting the inconspicuous explanatory variables is carried out. In this paper, a two-layer linear model is established to study the influencing factors of tunneling speed of TBM with double shields. By calculating the parameter estimation values of the fixed effect of each explanatory variable in the model, the direct and indirect effects of each factor on the tunneling speed are described quantitatively. According to the results of the model's parameter estimation, suggestions for better construction of TBM in the future are put forward. The reliability of the model is proved through the analysis of prediction model and practical application, which provides a theoretical basis for reasonable prediction of excavation speed and effective control of construction schedule for similar projects.
【作者單位】: 甘肅農(nóng)業(yè)大學(xué)工學(xué)院;中國(guó)水利水電第四工程局;
【基金】:國(guó)家批復(fù)引洮工程科學(xué)研究試驗(yàn)基金(YT374-ZX33-09107)
【分類號(hào)】:TV554
本文編號(hào):2441219
[Abstract]:Taking the No. 9 tunnel of Yintao Phase I Project in Gansu Province as an example, the modeling principle of multi-layer linear model and quantitative theory I is introduced. On the basis of the initial set-up of the explanatory variables, the method of gradually deleting the inconspicuous explanatory variables is carried out. In this paper, a two-layer linear model is established to study the influencing factors of tunneling speed of TBM with double shields. By calculating the parameter estimation values of the fixed effect of each explanatory variable in the model, the direct and indirect effects of each factor on the tunneling speed are described quantitatively. According to the results of the model's parameter estimation, suggestions for better construction of TBM in the future are put forward. The reliability of the model is proved through the analysis of prediction model and practical application, which provides a theoretical basis for reasonable prediction of excavation speed and effective control of construction schedule for similar projects.
【作者單位】: 甘肅農(nóng)業(yè)大學(xué)工學(xué)院;中國(guó)水利水電第四工程局;
【基金】:國(guó)家批復(fù)引洮工程科學(xué)研究試驗(yàn)基金(YT374-ZX33-09107)
【分類號(hào)】:TV554
【相似文獻(xiàn)】
相關(guān)期刊論文 前5條
1 王潔;TBM在不同特性硬巖中的掘進(jìn)速度[J];隧道建設(shè);2002年03期
2 袁興澤;李文富;趙玉輝;;TBM掘進(jìn)速度及影響因素淺析[J];水利建設(shè)與管理;2009年04期
3 吳水鋒;吳水平;;如何提高煤礦巷道光面爆破掘進(jìn)速度[J];科學(xué)之友;2013年01期
4 李良忠;;淺析槽子“炸死”的危害和解決辦法[J];爆破器材;1983年04期
5 ;[J];;年期
相關(guān)會(huì)議論文 前1條
1 李潮;丁靖洋;鄭長(zhǎng)江;周宏偉;;塌方區(qū)域?qū)BM掘進(jìn)速度的影響[A];北京力學(xué)會(huì)第18屆學(xué)術(shù)年會(huì)論文集[C];2012年
,本文編號(hào):2441219
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2441219.html
最近更新
教材專著