基于軸系擺度形態(tài)的水泵振動(dòng)分析法
[Abstract]:The pendulum of vertical shaft pump unit is the main characteristic data reflecting the lateral vibration of pump unit. The shaft system of vertical shaft pump unit is simplified into a geometric model of two disks and three supports, four basic forms of shafting pendulum are defined, and the variation of force characteristics and shafting configuration of pump unit under different test conditions is used. To analyze and find the leading factors that induce pump unit vibration. Taking the measurement data of pump pendulum in Niulanjiang-Ganghe pumping Station as an example, the shafting configuration of pump unit under three conditions of no water starting, water filling and pressure making and running with load is analyzed, and the method of comparing shafting configuration of two pump sets is adopted. The cause of large vibration swing of No. 2 pump group is studied. The analysis method given in the study has certain reference value for the vibration cause analysis of pumping station unit.
【作者單位】: 云南省水利水電投資有限公司;云南水投牛欄江滇池補(bǔ)水工程有限公司;
【分類號(hào)】:TV734
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 徐剛,王世健;小山電站1號(hào)機(jī)組擺度偏大問題的探討[J];水電站機(jī)電技術(shù);2001年02期
2 肖建平;;萬安水電廠振動(dòng)擺度裝置運(yùn)行情況[J];水電廠自動(dòng)化;2003年01期
3 陳華;熊立功;職光磊;;水力發(fā)電機(jī)組擺度超標(biāo)測(cè)試分析處理[J];水電站機(jī)電技術(shù);2009年05期
4 何定全;;洛古水電站2號(hào)機(jī)組擺度超標(biāo)處理[J];四川水力發(fā)電;2011年04期
5 曾游生;;再談草林沖電站1~#機(jī)組擺度增大原因[J];江西水利科技;2013年01期
6 黃景湖;;求取最大擺度的作圖法[J];水電站機(jī)電技術(shù);1992年02期
7 周文亭;鳳灘電廠一號(hào)機(jī)組上導(dǎo)擺度偏大缺陷的處理[J];水電站機(jī)電技術(shù);2000年03期
8 王玉領(lǐng);江埡水電站3~#機(jī)組擺度振動(dòng)超標(biāo)原因淺析[J];長江科學(xué)院院報(bào);2002年04期
9 王志剛,劉建偉;蓄能機(jī)組軸線問題及機(jī)組運(yùn)行擺度偏高分析處理[J];水電站機(jī)電技術(shù);2003年03期
10 職光磊;;機(jī)械同心度在機(jī)組軸承擺度測(cè)量中的影響[J];科技創(chuàng)新與應(yīng)用;2012年31期
相關(guān)會(huì)議論文 前10條
1 江信斌;;皂市水電站1號(hào)機(jī)組上導(dǎo)擺度異常增大原因分析及處理[A];水電站機(jī)電技術(shù)研討會(huì)論文集[C];2010年
2 王旺寧;姚鵬飛;黨存和;;小峽水電站2號(hào)機(jī)組上導(dǎo)擺度超標(biāo)原因分析及處理[A];水電站機(jī)電技術(shù)研討會(huì)論文集[C];2010年
3 陳垣熙;邱茂生;;水輪發(fā)電機(jī)組下導(dǎo)擺度超標(biāo)原因分析及處理[A];中國水力發(fā)電工程學(xué)會(huì)電力系統(tǒng)自動(dòng)化專委會(huì)2007年年會(huì)暨學(xué)術(shù)交流會(huì)論文集[C];2007年
4 潘峰;杜雄春;;三峽水電廠振動(dòng)擺度監(jiān)測(cè)分析系統(tǒng)[A];中國水力發(fā)電工程學(xué)會(huì)電力系統(tǒng)自動(dòng)化專委會(huì)2008年年會(huì)暨學(xué)術(shù)交流會(huì)論文集[C];2008年
5 劉衛(wèi)東;陳前淮;;三門峽水力發(fā)電廠發(fā)電機(jī)上導(dǎo)擺度大及動(dòng)平衡試驗(yàn)[A];水輪發(fā)電機(jī)組穩(wěn)定性技術(shù)研討會(huì)論文集[C];2007年
6 別必勝;;富水電廠機(jī)組振動(dòng)擺度及動(dòng)能參數(shù)監(jiān)測(cè)系統(tǒng)介紹[A];全國大中型水電廠技術(shù)協(xié)作網(wǎng)第二屆年會(huì)論文集[C];2005年
7 黃素滿;曾艷梅;;利用動(dòng)平衡試驗(yàn)解決龍灘水電站2號(hào)機(jī)組振動(dòng)擺度偏大的問題[A];水電設(shè)備的研究與實(shí)踐——第十七次中國水電設(shè)備學(xué)術(shù)討論會(huì)論文集[C];2009年
8 周霖;李軍路;敬燕飛;;瀑布溝水電站3號(hào)水輪發(fā)電機(jī)下導(dǎo)軸承擺度異常分析及處理[A];第十九次中國水電設(shè)備學(xué)術(shù)討論會(huì)論文集[C];2013年
9 鄭源;張飛;;基于連續(xù)小波變換的泵機(jī)組主軸徑向擺度信號(hào)處理[A];2009全國大型泵站更新改造研討暨新技術(shù)、新產(chǎn)品交流大會(huì)論文集[C];2009年
10 程向東;;水輪發(fā)電機(jī)組軸線調(diào)整工藝[A];四川、貴州、云南三省水電廠(站)機(jī)電設(shè)備運(yùn)行技術(shù)研討會(huì)論文集[C];2010年
相關(guān)碩士學(xué)位論文 前1條
1 楊德祥;水輪發(fā)電機(jī)組振動(dòng)擺度測(cè)量及故障分析系統(tǒng)設(shè)計(jì)與實(shí)現(xiàn)[D];電子科技大學(xué);2011年
,本文編號(hào):2257561
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2257561.html