[Abstract]:In the construction of dam on deep overburden, seepage control of dam foundation is the key to the success or failure of the project. The seepage problem of earth-rock dam on the deep overburden with strong and weak permeable layer is analyzed by finite element software Seep/w. The influence of the depth and form of the cutoff wall on the seepage flow of the dam, the escape slope of the dam foundation and the seepage slope at the bottom of the impervious wall are studied. The seepage control effect of suspended impervious wall, semi-closed cutoff wall and fully closed impervious wall on dam foundation is compared and analyzed. The calculation results show that the impervious wall passes through the weakly permeable layer, the suspended impermeable wall is transformed into the semi-closed impervious wall, and the seepage of the dam foundation decreases significantly (54.3%), and the slope of escape of the dam foundation decreases significantly (54.3%). Therefore, the combination of impervious wall and weak permeable layer can significantly improve the seepage control effect of vertical cutoff wall, and the anti-seepage effect of semi-closed cutoff wall is much better than that of suspended impervious wall. The optimum depth of the vertical impermeable wall of earth-rock dam on the deep overburden of binary structure is the depth of the impermeable wall just passing through the weakly permeable layer (continuous). In addition, it is also found that when the impervious wall is about to extend into the weakly permeable layer, The seepage slope at the bottom of the impermeable wall rises sharply and the maximum value appears. Enough attention should be paid to the engineering application to prevent the local seepage damage.
【作者單位】: 石河子大學(xué)水利建筑工程學(xué)院;重慶三峽學(xué)院土木工程學(xué)院;
【基金】:國(guó)家自然科學(xué)基金資助項(xiàng)目(51309262,51408377,51269029) 重慶市科委基礎(chǔ)與前沿研究計(jì)劃項(xiàng)目(cstc2015jcyj A1204,cstc2015jcyj A00022)
【分類(lèi)號(hào)】:TV223.4
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 介玉新;周厚德;;防滲墻的彎矩計(jì)算[J];巖石力學(xué)與工程學(xué)報(bào);2009年06期
2 王輝雄;;振動(dòng)沉模超薄防滲墻技術(shù)在水利工程中的應(yīng)用[J];中國(guó)水能及電氣化;2010年Z1期
3 王輝雄;;振動(dòng)沉模超薄防滲墻技術(shù)在水利工程的應(yīng)用[J];小水電;2010年01期
4 姜永興;瞿忠烈;;蓄水過(guò)程對(duì)防滲墻應(yīng)力應(yīng)變的影響分析[J];浙江水利水電專(zhuān)科學(xué)校學(xué)報(bào);2011年01期
5 張波;;防滲墻墻體材料研究探討[J];科技信息;2011年25期
6 仇延林;王寧;;壩體防滲墻設(shè)計(jì)之淺見(jiàn)[J];內(nèi)蒙古水利;2012年03期
7 鄭海圣;周嵩;劉武;車(chē)富強(qiáng);張璇;;防滲墻深度對(duì)閘壩深厚透水層滲流特性的影響[J];水電能源科學(xué);2013年09期
8 趙堅(jiān),盛金昌,劉慶;關(guān)于堤防攪拌樁防滲墻施工質(zhì)量控制的探討[J];水電能源科學(xué);2000年04期
9 王立權(quán),寧少予,羅瑩;振動(dòng)切槽防滲墻技術(shù)的應(yīng)用[J];水利科技與經(jīng)濟(jì);2000年02期
10 周偉程;多頭深層攪拌防滲墻技術(shù)及實(shí)際應(yīng)用[J];中國(guó)水利;2000年04期
相關(guān)會(huì)議論文 前10條
1 賈永梅;姚成林;;境主廟水庫(kù)防滲墻檢測(cè)[A];第八次水利水電地基與基礎(chǔ)工程學(xué)術(shù)會(huì)議論文集[C];2006年
2 熊進(jìn);劉百興;李思慎;;長(zhǎng)江重要堤防隱蔽工程薄防滲墻技術(shù)檢驗(yàn)標(biāo)準(zhǔn)簡(jiǎn)介[A];2004水利水電地基與基礎(chǔ)工程技術(shù)[C];2004年
3 任冶;盧家勇;;在卵石地層中建造連續(xù)防滲墻[A];中國(guó)土木工程學(xué)會(huì)市政工程分會(huì)2000年學(xué)術(shù)年會(huì)論文集[C];2000年
4 熊進(jìn);劉百興;李思慎;;長(zhǎng)江重要堤防隱蔽工程薄防滲墻技術(shù)檢驗(yàn)標(biāo)準(zhǔn)簡(jiǎn)介[A];2004水利水電地基與基礎(chǔ)工程技術(shù)——中國(guó)水利學(xué)會(huì)地基與基礎(chǔ)工程專(zhuān)業(yè)委員會(huì)2004年學(xué)術(shù)會(huì)議論文集[C];2004年
5 吳夢(mèng)喜;胡小紅;伍小玉;;壩基兩道防滲墻水頭分擔(dān)情況有限元分析[A];第一屆中國(guó)水利水電巖土力學(xué)與工程學(xué)術(shù)討論會(huì)論文集(上冊(cè))[C];2006年
6 王娟;王冬珍;劉漢中;;青草沙水庫(kù)北圍堤防滲墻結(jié)構(gòu)對(duì)滲流場(chǎng)的影響分析[A];中國(guó)水利學(xué)會(huì)2007學(xué)術(shù)年會(huì)人類(lèi)活動(dòng)與河口分會(huì)場(chǎng)論文集[C];2007年
7 韓偉;張聚生;劉勇;;漂卵石地層中薄防滲墻快速施工技術(shù)[A];地基基礎(chǔ)工程與錨固注漿技術(shù):2009年地基基礎(chǔ)工程與錨固注漿技術(shù)研討會(huì)論文集[C];2009年
8 朱云江;謝蒙;李偉;;某水利樞紐防滲墻查漏及堵漏經(jīng)驗(yàn)總結(jié)[A];廣東省水力發(fā)電工程學(xué)會(huì)論文集[C];2009年
9 程瑤;張美霞;唐朝暉;;水泥土薄型防滲墻最優(yōu)配合比試驗(yàn)研究及應(yīng)用[A];全國(guó)巖土與工程學(xué)術(shù)大會(huì)論文集(下冊(cè))[C];2003年
10 向永忠;;冶勒水電站大壩基礎(chǔ)防滲墻墻體材料研究[A];2004水利水電地基與基礎(chǔ)工程技術(shù)[C];2004年
相關(guān)重要報(bào)紙文章 前7條
1 許廣智 石建成;水利防滲墻的施工及灌漿技術(shù)[N];伊犁日?qǐng)?bào)(漢);2007年
2 任峰光;走科技興局之路 產(chǎn)值七年翻兩番[N];中國(guó)水利報(bào);2003年
3 記者 喬地 通訊員 王彥榮;高聚物防滲墻可有效破解堤壩滲漏瓶頸[N];科技日?qǐng)?bào);2011年
4 ;“長(zhǎng)江重要堤防隱蔽工程建設(shè)追蹤”系列報(bào)道——監(jiān)測(cè)篇$$為隱蔽工程“體檢”[N];中國(guó)水利報(bào);2002年
5 馬智博;西泉眼水庫(kù)防滲墻建設(shè)啟動(dòng)[N];中國(guó)經(jīng)濟(jì)導(dǎo)報(bào);2008年
6 本報(bào)記者 張志杰 通訊員 王金生;招標(biāo)“招”來(lái)“金鳳凰”[N];中國(guó)水利報(bào);2001年
7 廖樹(shù)材;科學(xué)把握加固與防滲[N];中國(guó)水利報(bào);2008年
相關(guān)博士學(xué)位論文 前2條
1 王大宇;管涌發(fā)展與懸掛式防滲墻作用機(jī)制研究[D];清華大學(xué);2015年
2 張偉;滲流場(chǎng)及其與應(yīng)力場(chǎng)的耦合分析和工程應(yīng)用[D];武漢大學(xué);2004年
相關(guān)碩士學(xué)位論文 前4條
1 陳浩;基于彈塑性有限元法的深基坑防滲墻實(shí)測(cè)位移反饋分析[D];四川大學(xué);2006年
2 劉娜;土石壩三維非線性有限元分析及防滲墻應(yīng)力狀態(tài)研究[D];西安理工大學(xué);2007年
3 韓文濤;渾水滲流理論與壩基防滲研究[D];西安理工大學(xué);2006年
4 賀國(guó)平;黃河影響帶地下水及合理開(kāi)發(fā)利用研究[D];中國(guó)地質(zhì)大學(xué)(北京);2003年
,本文編號(hào):2253160
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2253160.html