軟巖隧洞圍巖長(zhǎng)期穩(wěn)定性研究
[Abstract]:Based on the mechanics theory of unloading rock, the stress and deformation of surrounding rock in construction, operation and rheological process of surrounding rock are simulated by FLAC3D finite difference program, taking the diversion tunnel of hydropower station which passes through typical soft rock sand and mudstone formation by a certain tunnel line as an example, based on the mechanics theory of unloading rock mass. The results show that: (1) the construction method of partial excavation and timely support can control the deformation of surrounding rock better; (2) after excavation of tunnel, the deformation of surrounding rock around the tunnel leads to a large deformation in the tunnel, and the compressive stress of surrounding rock near the excavating surface is greatly reduced. But the whole is still under pressure; (3) during the later normal operation, the deformation of surrounding rock gradually tends to be stable, and the stress gradually develops in favor of the overall stability of the tunnel, which indicates that the long-term stability of the tunnel is good. The research results can provide some reference value for the study of tunnel construction safety and long-term stability in soft rock formation.
【作者單位】: 中國(guó)電建集團(tuán)成都勘測(cè)設(shè)計(jì)研究院有限公司;成都城投集團(tuán)興西華建設(shè)有限公司;
【分類(lèi)號(hào)】:TV223
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 趙強(qiáng),鐘玉英;中小型斷面長(zhǎng)隧洞的施工實(shí)踐[J];西部探礦工程;2003年02期
2 董旭東;;減少隧洞污水對(duì)環(huán)境影響[J];黑龍江科技信息;2011年13期
3 ;開(kāi)挖隧洞的修釬廠和修釬工作[J];水力發(fā)電;1955年05期
4 丁春富,胡茂紅;豐潭引水隧洞開(kāi)挖進(jìn)度與施工管理的實(shí)踐[J];浙江水利水電專(zhuān)科學(xué)校學(xué)報(bào);2000年04期
5 徐小華;隧洞安全施工措施[J];地質(zhì)勘探安全;2001年01期
6 李益南,何建岳;隧洞開(kāi)挖施工中機(jī)械設(shè)備尾氣污染的解決途徑[J];浙江水利科技;2003年06期
7 李錫武;光面控制爆破在東改工程石山隧洞開(kāi)挖中的應(yīng)用[J];四川水利;2003年06期
8 葛鴻飛;特殊情況下的隧洞開(kāi)挖[J];山西水利;2004年04期
9 路軍利;;隧洞開(kāi)挖質(zhì)量控制的體會(huì)[J];西北水力發(fā)電;2005年S2期
10 陳漢文;;隧洞開(kāi)挖循環(huán)時(shí)間計(jì)算方法[J];施工組織設(shè)計(jì);2005年00期
相關(guān)會(huì)議論文 前10條
1 魏永華;楊簫;;復(fù)雜地質(zhì)條件下特大斷面隧洞開(kāi)挖施工技術(shù)探討[A];南方十三省(市、區(qū))水電學(xué)會(huì)聯(lián)絡(luò)會(huì)暨學(xué)術(shù)交流會(huì)論文集[C];2007年
2 余波;;天生橋二級(jí)水電站隧洞區(qū)巖溶水文地質(zhì)特征[A];新世紀(jì) 新機(jī)遇 新挑戰(zhàn)——知識(shí)創(chuàng)新和高新技術(shù)產(chǎn)業(yè)發(fā)展(上冊(cè))[C];2001年
3 張雪剛;熊平初;馮波;;鄉(xiāng)城水電站古河床地質(zhì)條件下的隧洞開(kāi)挖與初期支護(hù)[A];貴州省巖石力學(xué)與工程學(xué)會(huì)2010年學(xué)術(shù)年會(huì)論文集[C];2010年
4 楊玉銀;;隧洞開(kāi)挖光面爆破新技術(shù)[A];光面預(yù)裂爆破論文匯編[C];2007年
5 郭永剛;;隧洞施工技術(shù)研究[A];混凝土面板堆石壩技術(shù)交流文集[C];2011年
6 李洪濤;盧文波;舒大強(qiáng);;隧洞開(kāi)挖爆破地震反應(yīng)譜特征研究[A];第一屆中國(guó)水利水電巖土力學(xué)與工程學(xué)術(shù)討論會(huì)論文集(下冊(cè))[C];2006年
7 簡(jiǎn)文彬;姚環(huán);陳祺模;;大腹山隧洞圍巖位移的非線(xiàn)性時(shí)間序列分析[A];第六屆全國(guó)工程地質(zhì)大會(huì)論文集[C];2000年
8 賴(lài)正發(fā);張國(guó)海;楊正東;黃經(jīng)秋;;某隧洞洞身的變形分析[A];第七屆全國(guó)工程地質(zhì)大會(huì)論文集[C];2004年
9 吳海平;常彥斌;;三板溪水電站泄洪洞特大斷面隧洞開(kāi)挖技術(shù)[A];紀(jì)念貴州省水力發(fā)電工程學(xué)會(huì)成立20周年論文選集[C];2005年
10 張巍;鄭晶星;章鵬;;惠州抽水蓄能電站高壓隧洞滲流及結(jié)構(gòu)計(jì)算分析[A];抽水蓄能電站工程建設(shè)文集(2009)[C];2009年
相關(guān)重要報(bào)紙文章 前3條
1 記者 殷磊 通訊員 陳曉斌;九龍江水年底穿隧入廈[N];廈門(mén)日?qǐng)?bào);2011年
2 本報(bào)記者 汪棟 通訊員 宋振峰;那里有沉甸甸的責(zé)任[N];中國(guó)水利報(bào);2011年
3 謝見(jiàn)柏 趙玉秀;重大的試驗(yàn) 豐碩的成果[N];黃河報(bào);2006年
相關(guān)碩士學(xué)位論文 前9條
1 王明霞;水工高壓隧洞襯砌結(jié)構(gòu)計(jì)算的邊值法[D];大連理工大學(xué);2016年
2 何文學(xué);隧洞開(kāi)挖爆破誘發(fā)的圍巖振動(dòng)特性研究[D];武漢大學(xué);2017年
3 杜鑫;大型水電站隧洞開(kāi)挖施工的三維數(shù)值模擬研究[D];西華大學(xué);2010年
4 歐陽(yáng)禮捷;隧洞開(kāi)挖滲流場(chǎng)適時(shí)預(yù)報(bào)方法研究[D];河海大學(xué);2007年
5 蔡書(shū)生;隧洞開(kāi)挖爆破專(zhuān)家系統(tǒng)的研究與開(kāi)發(fā)[D];西安理工大學(xué);2005年
6 李鵬濤;TBM施工隧洞襯砌管片內(nèi)力分析模型研究[D];西北農(nóng)林科技大學(xué);2009年
7 張懷軍;南水北調(diào)東線(xiàn)穿黃河工程過(guò)河隧洞開(kāi)挖涌水預(yù)測(cè)分析研究[D];天津大學(xué);2008年
8 王成平;基于VB的隧洞開(kāi)挖爆破管理設(shè)計(jì)系統(tǒng)[D];西安理工大學(xué);2007年
9 權(quán)乾龍;富水隧洞注漿堵水技術(shù)及合理注漿圈形式研究[D];西南交通大學(xué);2014年
,本文編號(hào):2252851
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2252851.html