河南天池抽水蓄能電站庫(kù)區(qū)含沙量分布及泥沙淤積分布試驗(yàn)研究
[Abstract]:Sediment in pumped storage power station has been concerned by researchers all the time. On the one hand, the sediment accumulation in the reservoir area affects the storage capacity of the power station. The operation of the power station is affected to some extent (such as Zhanghewan pumped storage power station and Panjiakou hybrid pumped storage power station), on the other hand, the sediment enters the pumping equipment with the operation of the power station. A fatal effect on the life of equipment, eg a Pushihe pumped storage plant. In the early stage design of pumped storage power station, the most important problems are how to solve the problem of sand drainage facilities, sand erosion prevention and anti-wear research of hydraulic turbine unit, the optimization design of sediment conveyer channel, and the study of sediment discharge scheduling. The physical model of river engineering has incomparable advantages over other methods in the study of water flow structure, river bed evolution, sediment deposition and so on. Based on the similarity theory of the model and the hydro-sediment data of Tianchi pumped storage power station in Henan Province, the model of muddy hydrodynamic bed in Tianchi, Henan Province is made. The reliability of the model design is verified by comparing the prototype data with the experimental data. On the basis of reliable design of the model, the antisilt topography of Tianchi pumped Storage Power Station in Henan Province is measured under different conditions of water and sediment in each long series of years and after the operation of typical flood year. The total siltation distribution at the end of the year and the siltation distribution among the sections in the reservoir area are approximately obtained by using the cross-section method. The distribution of sediment concentration along the course of each long series of tests and the distribution of sediment content in typical sections are measured in time by using the method of specific gravity bottle. The maximum sediment concentration at the inlet of the reservoir under the limited operation of the power station is given. The results show that the distribution of sediment content in typical section and inlet and outlet increases exponentially.
【學(xué)位授予單位】:華北水利水電大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TV145;TV743
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 閔麗;;抽水蓄能電站泥沙影響和處理策略的相關(guān)思考[J];山西建筑;2016年35期
2 張羽;邢晨雄;;小浪底水庫(kù)壩區(qū)動(dòng)床模型選沙與驗(yàn)證試驗(yàn)研究[J];華北水利水電大學(xué)學(xué)報(bào)(自然科學(xué)版);2016年01期
3 暢彩娥;;陜西電網(wǎng)建設(shè)抽水蓄能電站的作用與效益分析[J];西北水電;2015年05期
4 付旭輝;劉海婷;陳紹文;錢(qián)銳;;推移質(zhì)動(dòng)床模型中模型沙運(yùn)動(dòng)比較研究[J];泥沙研究;2015年05期
5 劉娜;武金慧;杜志水;;陜西鎮(zhèn)安抽水蓄能電站泥沙淤積及防排沙措施研究[J];西北水電;2015年06期
6 曹慧群;李青云;黃茁;李凌云;;我國(guó)水庫(kù)淤積防治方法及效果綜述[J];水力發(fā)電學(xué)報(bào);2013年06期
7 唐立模;劉全帥;韓柯堯;肖洋;;一種塑料模型沙運(yùn)動(dòng)特性試驗(yàn)[J];水利水電科技進(jìn)展;2012年06期
8 薛偉;雷雪婷;俞冰;吳蘇舒;;新型PS模型沙特性研究[J];河海大學(xué)學(xué)報(bào)(自然科學(xué)版);2012年06期
9 向波;宋剛福;周婷;周曉蔚;;抽水蓄能電站水沙調(diào)度研究[J];水力發(fā)電學(xué)報(bào);2012年04期
10 李軍華;江恩惠;鄭邦民;張楊;;泥沙起動(dòng)流速的隨機(jī)分析[J];泥沙研究;2012年03期
相關(guān)重要報(bào)紙文章 前1條
1 王靜琳;時(shí)爽;;張俊華:優(yōu)選并保持小浪底水庫(kù)三角洲淤積形態(tài)[N];黃河報(bào);2014年
相關(guān)博士學(xué)位論文 前1條
1 姚文藝;黃河河道實(shí)體模擬若干設(shè)計(jì)理論及其應(yīng)用[D];河海大學(xué);2005年
相關(guān)碩士學(xué)位論文 前1條
1 張東剛;張河灣抽水蓄能電站下水庫(kù)攔河壩水工模型試驗(yàn)研究[D];河海大學(xué);2007年
,本文編號(hào):2239922
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2239922.html