和聲搜索混合優(yōu)化算法在水電廠機(jī)組組合優(yōu)化中的應(yīng)用
發(fā)布時(shí)間:2018-08-24 13:43
【摘要】:針對(duì)水電站機(jī)組組合優(yōu)化運(yùn)行問(wèn)題的特殊性,建立了以耗水量最小為目標(biāo)的機(jī)組組合優(yōu)化模型,提出了一種改進(jìn)二進(jìn)制和聲搜索算法優(yōu)化水電廠機(jī)組的開(kāi)停機(jī)順序,采用啟發(fā)式修復(fù)策略處理旋轉(zhuǎn)備用容量約束與最小開(kāi)停機(jī)時(shí)間約束,并通過(guò)查詢(xún)經(jīng)濟(jì)運(yùn)行總表的方法進(jìn)行不同時(shí)段機(jī)組間的負(fù)荷分配。以柘林水電廠某日的實(shí)際負(fù)荷過(guò)程為例進(jìn)行計(jì)算,并與改進(jìn)二進(jìn)制粒子群算法(IBPSO)和傳統(tǒng)的動(dòng)態(tài)規(guī)劃法(DP)進(jìn)行對(duì)比。結(jié)果表明,該算法簡(jiǎn)單快速,優(yōu)化效果好,實(shí)現(xiàn)了機(jī)組間負(fù)荷的最優(yōu)分配,提高了水能利用率,具有較強(qiáng)的工程實(shí)用性。
[Abstract]:In view of the particularity of the optimal operation of hydropower units, a unit combination optimization model aiming at minimum water consumption is established, and an improved binary harmonic search algorithm is proposed to optimize the start-up and shutdown order of hydropower plant units. The heuristic repair strategy is used to deal with the constraints of rotating reserve capacity and minimum open / down time, and the load distribution among units in different periods is carried out by querying the summary table of economic operation. The actual load process of Zhelin Hydropower Plant is taken as an example and compared with the improved binary particle swarm optimization algorithm (IBPSO) and the traditional dynamic programming method (DP). The results show that the algorithm is simple and fast, has good optimization effect, realizes the optimal load distribution among units, improves the utilization ratio of water energy, and has strong engineering practicability.
【作者單位】: 江西省電力公司柘林水電廠;華中科技大學(xué)水電與數(shù)字化工程學(xué)院;
【基金】:國(guó)家自然科學(xué)基金面上項(xiàng)目(51479075) 水文水資源與水利工程科學(xué)國(guó)家重點(diǎn)實(shí)驗(yàn)室開(kāi)放研究基金(2014491811) 長(zhǎng)江科學(xué)院開(kāi)放研究基金(CKWV2013219KY)
【分類(lèi)號(hào)】:TP18;TV734
,
本文編號(hào):2200996
[Abstract]:In view of the particularity of the optimal operation of hydropower units, a unit combination optimization model aiming at minimum water consumption is established, and an improved binary harmonic search algorithm is proposed to optimize the start-up and shutdown order of hydropower plant units. The heuristic repair strategy is used to deal with the constraints of rotating reserve capacity and minimum open / down time, and the load distribution among units in different periods is carried out by querying the summary table of economic operation. The actual load process of Zhelin Hydropower Plant is taken as an example and compared with the improved binary particle swarm optimization algorithm (IBPSO) and the traditional dynamic programming method (DP). The results show that the algorithm is simple and fast, has good optimization effect, realizes the optimal load distribution among units, improves the utilization ratio of water energy, and has strong engineering practicability.
【作者單位】: 江西省電力公司柘林水電廠;華中科技大學(xué)水電與數(shù)字化工程學(xué)院;
【基金】:國(guó)家自然科學(xué)基金面上項(xiàng)目(51479075) 水文水資源與水利工程科學(xué)國(guó)家重點(diǎn)實(shí)驗(yàn)室開(kāi)放研究基金(2014491811) 長(zhǎng)江科學(xué)院開(kāi)放研究基金(CKWV2013219KY)
【分類(lèi)號(hào)】:TP18;TV734
,
本文編號(hào):2200996