大型圍海工程中的堤身穩(wěn)定性系統(tǒng)優(yōu)化技術(shù)研究

發(fā)布時(shí)間:2018-08-16 13:08
【摘要】:軟基筑堤的大型圍海工程在設(shè)計(jì)和施工方面存在三個(gè)問題:1)缺乏系統(tǒng)、合理的技術(shù)來優(yōu)化圍堤斷面,降低工程造價(jià);2)設(shè)計(jì)和施工缺乏聯(lián)動(dòng)和協(xié)調(diào);3)施工中缺乏系統(tǒng)的堤身穩(wěn)定控制技術(shù)來控制堤身穩(wěn)定。針對以上問題,本文提出了系統(tǒng)堤身穩(wěn)定技術(shù),主要包含設(shè)計(jì)和施工兩個(gè)方面:1)從設(shè)計(jì)角度提出系統(tǒng)堤身穩(wěn)定分析方法;2)從施工角度提出系統(tǒng)堤身穩(wěn)定控制方法。 提出通過設(shè)計(jì)和施工聯(lián)動(dòng),利用工程中的堤身穩(wěn)定的各影響因素,將工程總體的施工進(jìn)度安排和堤身穩(wěn)定分析有機(jī)結(jié)合,實(shí)現(xiàn)總體最優(yōu)的工程實(shí)施方案。該方法需要設(shè)計(jì)方和施工方共同參與設(shè)計(jì)方案和施工組織方案的確定,,能夠充分發(fā)揮技術(shù)和工程實(shí)踐的優(yōu)勢,達(dá)到降低工程造價(jià)的目的。同時(shí)該方法充分發(fā)揮設(shè)計(jì)和施工的聯(lián)動(dòng)性和協(xié)調(diào)性,對整個(gè)工程實(shí)施順序的協(xié)調(diào)、銜接進(jìn)行全局性把握,對每段圍堤的施工要點(diǎn)和關(guān)鍵進(jìn)行重點(diǎn)控制,充分體現(xiàn)了設(shè)計(jì)方案和施工組織的緊密協(xié)調(diào)和統(tǒng)一,對于控制工程質(zhì)量和降低工程風(fēng)險(xiǎn)具有重要意義。 系統(tǒng)堤身穩(wěn)定控制方法從施工速率、施工工序、龍口合攏、堤身監(jiān)測和堤身險(xiǎn)情控制等方面提出了合理、可行的控制方法。系統(tǒng)堤身穩(wěn)定控制方法為軟基圍堤的施工組織和施工質(zhì)量控制提供了理論支撐和指導(dǎo)方法,有助于施工方在施工過程有效控制堤身穩(wěn)定,從而減少堤身變形帶來的工程損失。
[Abstract]:There are three problems in the design and construction of the large reclamation project of soft foundation embankment: 1) lack of system, reasonable technology to optimize the section of embankment, and 2) lack of linkage and coordination between design and construction; 3) lack of systematic levee stability control technology to control embankment stability. Aiming at the above problems, this paper puts forward the system embankment stabilization technology, which mainly includes design and construction aspects: 1) from the design point of view, puts forward the system levee stability analysis method 2) puts forward the system dike stability control method from the construction point of view. It is put forward that the overall construction schedule arrangement and dike stability analysis can be combined organically through the linkage of design and construction, and the overall optimal project implementation scheme can be realized by utilizing the influencing factors of levee stability in the project. This method needs the designers and the constructors to participate in the determination of the design scheme and the construction organization plan together, which can give full play to the advantages of technology and engineering practice, and achieve the purpose of reducing the project cost. At the same time, the method can give full play to the linkage and coordination of design and construction, coordinate the implementation sequence of the whole project, and control the key points and key points of construction of each section of embankment. It fully embodies the close coordination and unity between the design scheme and the construction organization, which is of great significance for the control of engineering quality and the reduction of engineering risks. A reasonable and feasible control method is put forward from the aspects of construction rate, construction procedure, closure of the Longkou, monitoring of the dike body and control of the embankment danger. The system embankment stability control method provides a theoretical support and guidance method for the construction organization and construction quality control of the soft foundation embankment, which is helpful for the construction side to effectively control the levee stability during the construction process, thus reducing the engineering losses caused by the embankment deformation.
【學(xué)位授予單位】:天津大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2014
【分類號】:U656

【參考文獻(xiàn)】

相關(guān)期刊論文 前10條

1 段紅霞;李守巨;;防波堤抗滑穩(wěn)定性分析[J];大連民族學(xué)院學(xué)報(bào);2008年03期

2 孫彬;葉獻(xiàn)國;;塑料板排水法在真空預(yù)壓加固軟基中的應(yīng)用[J];山西建筑;2008年01期

3 馬小鋒;;淺談軟土地基處理方法[J];山西建筑;2008年01期

4 劉雪松,蘇揚(yáng),顧群;砂袋圍堰在水利建設(shè)中的運(yùn)用[J];江蘇水利;2004年10期

5 唐巨山;袁文喜;曾甄;;軟土地基上海堤穩(wěn)定分析方法中若干問題的研究[J];中國水利;2008年16期

6 吳興元;袋裝砂斜坡堤在長江口深水航道治理一期北導(dǎo)堤工程中的應(yīng)用[J];水運(yùn)工程;1999年10期

7 趙良奎;長江口深水航道治理工程一期工程北導(dǎo)堤袋裝砂堤心斜坡堤的設(shè)計(jì)[J];水運(yùn)工程;2000年12期

8 阮學(xué)成;;大型土工織物充灌袋在上海洋山深水港海堤建設(shè)中的應(yīng)用[J];水運(yùn)工程;2006年11期

9 趙良奎;;長江口深水航道治理工程中袋裝砂堤心斜坡堤結(jié)構(gòu)設(shè)計(jì)[J];水運(yùn)工程;2006年S2期

10 查恩堯;李靜怡;別社安;;圍海造陸工程中分層吹填工藝的研究[J];水運(yùn)工程;2008年08期



本文編號:2186075

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/2186075.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶cdff4***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請E-mail郵箱bigeng88@qq.com
精品少妇人妻av免费看| 久久99青青精品免费观看| 国产亚洲精品岁国产微拍精品| 精品一区二区三区免费看| 午夜福利国产精品不卡| 日韩人妻有码一区二区| 欧美成人黄色一区二区三区| 中文字幕日韩欧美亚洲午夜| 国产在线日韩精品欧美| 国产农村妇女成人精品| 国产av乱了乱了一区二区三区| 99秋霞在线观看视频| 国产精品激情对白一区二区| 亚洲国产精品无遮挡羞羞| 亚洲精品国产福利在线| 少妇特黄av一区二区三区| 亚洲第一视频少妇人妻系列| 欧美日韩亚洲国产av| 欧美欧美日韩综合一区| 日韩欧美国产精品自拍| 夜色福利久久精品福利| 日本不卡视频在线观看| 日韩1区二区三区麻豆| 日韩欧美一区二区久久婷婷| 欧美日韩亚洲国产综合网| 高清不卡一卡二卡区在线| 欧美一级日韩中文字幕| 亚洲中文字幕人妻系列| 欧美色婷婷综合狠狠爱| 老富婆找帅哥按摩抠逼视频| 欧美胖熟妇一区二区三区| 激情综合网俺也狠狠地| 久久精品国产亚洲av久按摩| 台湾综合熟女一区二区| 91在线国内在线中文字幕| 日本丁香婷婷欧美激情| 丰满人妻熟妇乱又乱精品古代| 亚洲一区二区欧美激情| 不卡视频免费一区二区三区| 欧美日韩国产精品自在自线| 日韩精品免费一区二区三区|