西藏玉曲河扎拉水電站可行性研究報(bào)告通過(guò)審查
發(fā)布時(shí)間:2018-06-03 17:06
本文選題:玉曲 + 可行性研究報(bào)告; 參考:《水力發(fā)電》2017年04期
【摘要】:正2017年2月25日~27日,西藏玉曲河扎拉水電站可行性研究報(bào)告通過(guò)水電水利規(guī)劃設(shè)計(jì)總院審查。會(huì)議審查認(rèn)為,報(bào)告基本達(dá)到了可行性研究階段勘測(cè)設(shè)計(jì)工作內(nèi)容和深度的要求。扎拉水電站是玉曲河干流下游河段水電規(guī)劃7個(gè)梯級(jí)中的第6級(jí),工程采用混合式開(kāi)發(fā),壩址位于西藏自治區(qū)昌都市左貢
[Abstract]:From February 25 to 27, 2017, the feasibility study report of Yuqu River Zala Hydropower Station in Tibet was examined by the General Hydropower and Water Conservancy Planning and Design Institute. The meeting concluded that the report basically met the requirements of the content and depth of the survey and design in the feasibility study stage. Zala Hydropower Station is the sixth of 7 steps in the hydropower planning of the lower reaches of the Yuqu River main stream. The project adopts mixed development and the dam site is located in Zigong, Changdu City, Tibet Autonomous region.
【分類號(hào)】:TV752
,
本文編號(hào):1973540
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1973540.html
最近更新
教材專著