官地水電站碾壓混凝土大壩快速經(jīng)濟(jì)施工研究與應(yīng)用
本文選題:官地水電站 + 碾壓混凝土; 參考:《清華大學(xué)》2014年碩士論文
【摘要】:官地水電站是雅礱江卡拉至江口河段的第三個(gè)梯級(jí)電站,于2004年底開(kāi)展前期準(zhǔn)備工作。2009年下半年,電站業(yè)主雅礱江流域水電開(kāi)發(fā)有限公司提出了首臺(tái)機(jī)組于2012年3月提前發(fā)電投產(chǎn)的設(shè)想。因此,電站建設(shè)需要全面趕工,特別是在當(dāng)時(shí)大壩壩基開(kāi)挖進(jìn)度已經(jīng)滯后計(jì)劃9個(gè)月的情況下,開(kāi)挖階段必須趕工,且大壩碾壓混凝土的澆筑施工時(shí)間必須從33個(gè)月壓縮至23個(gè)月。官地水電站碾壓混凝土重力壩壩高168m,與國(guó)內(nèi)近期建成的同類型壩如龍灘、金安橋、光照等有許多相同之處,可借鑒相關(guān)成功經(jīng)驗(yàn)。本文通過(guò)從優(yōu)化碾壓混凝土配合比、優(yōu)化碾壓混凝土施工方案及工藝、降低碾壓混凝土入倉(cāng)溫度、采取多種經(jīng)濟(jì)可行的方式入倉(cāng)、采取通水冷卻降低碾壓混凝土大壩最高溫度、加強(qiáng)施工管理搞好倉(cāng)面一條龍的流水生產(chǎn)等方面開(kāi)展研究工作,以期實(shí)現(xiàn)大壩碾壓混凝土全年持續(xù)澆筑。并將非強(qiáng)約束區(qū)碾壓混凝土升程提高至6m,減少層面處理及層間間歇時(shí)間,大幅壓縮碾壓混凝土大壩施工時(shí)間,加快碾壓混凝土大壩上升速度,同時(shí)在官地現(xiàn)場(chǎng)開(kāi)展碾壓混凝土配合比試驗(yàn)、碾壓試驗(yàn)等各項(xiàng)現(xiàn)場(chǎng)試驗(yàn)工作,并進(jìn)行仿真、溫控、監(jiān)控等專項(xiàng)研究,指導(dǎo)官地水電站碾壓混凝土大壩的快速施工,滿足大壩提前擋水要求。經(jīng)測(cè)算,官地水電站提前3個(gè)月發(fā)電的收益為2.83億元,因提前發(fā)電直接增加投入的相關(guān)的費(fèi)用為4337.28萬(wàn)元,提前發(fā)電收益明顯遠(yuǎn)大于投入的費(fèi)用,官地水電站碾壓混凝土大壩快速施工獲得了可觀的經(jīng)濟(jì)效益。通過(guò)官地水電站大壩碾壓混凝土快速經(jīng)濟(jì)施工的實(shí)踐,完全可以證明,在做好溫控工作的前提下,碾壓混凝土可以實(shí)現(xiàn)更快速的施工,同時(shí)也可獲得更加良好的經(jīng)濟(jì)效益。官地水電站大壩在確保防裂安全的前提下成功實(shí)施了碾壓混凝土的快速施工,進(jìn)一步調(diào)和了大壩的安全性與經(jīng)濟(jì)性這一對(duì)矛盾,顯著提高了碾壓混凝土大壩施工和運(yùn)行的性價(jià)比,將對(duì)推動(dòng)碾壓混凝土大壩的建設(shè)起到良好的促進(jìn)作用。
[Abstract]:Guandi Hydropower Station is the third cascade power station from Kara to Estuary of the Yalong River. Preparatory work was carried out at the end of 2004. In the second half of 2009, Yalong River Basin Hydropower Development Co., Ltd., the owner of the power station, put forward the idea that the first unit should be put into production in March 2012. Therefore, the construction of the power station needs to be carried out in a comprehensive manner, especially since the excavation schedule of the dam foundation was already behind schedule for nine months at that time, the excavation stage must be rushed. The construction time of RCC must be reduced from 33 months to 23 months. The height of RCC gravity dam in Guandi Hydropower Station is 168m, which has many similarities with the similar dams such as Longtan, Jin'an Bridge and Illumination, which can be used for reference. In this paper, by optimizing RCC mix ratio, optimizing RCC construction scheme and technology, reducing RCC entering temperature, adopting many economical and feasible ways to enter warehouse, adopting water cooling to reduce the maximum temperature of RCC dam. Strengthen the construction management and carry out the research work in the aspects of running water production of the one-stop train of silo surface so as to realize the continuous pouring of RCC dam throughout the year. It also increases the lift of RCC to 6 m, reduces the interval between layers and layers, compresses the construction time of RCC dam, and accelerates the rising speed of RCC dam. At the same time, the RCC mix ratio test, roller compaction test and other field tests are carried out in the official field, and special research such as simulation, temperature control and monitoring are carried out to guide the rapid construction of the RCC dam in Guandi Hydropower Station. To meet the dam ahead of time water requirements. It has been estimated that the revenue of generating electricity in Guandi hydropower station three months ahead of schedule is 283 million yuan, and the related cost of direct increase in input for early generation is 43.3728 million yuan. The benefit of early generation is significantly larger than the cost of input. The rapid construction of Roller compacted concrete Dam in Guandi Hydropower Station has obtained considerable economic benefits. Through the practice of rapid and economical construction of RCC in Guandi Hydropower Station, it can be proved that RCC can realize faster construction and obtain better economic benefit under the premise of temperature control. The dam of Guandi Hydropower Station has successfully implemented the rapid construction of roller compacted concrete under the premise of ensuring crack prevention and safety, further reconciling the contradiction between safety and economy of the dam. The ratio of performance to price of RCC dam construction and operation is significantly improved, and it will play a good role in promoting the construction of RCC dam.
【學(xué)位授予單位】:清華大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2014
【分類號(hào)】:TV544.921
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 唐國(guó)進(jìn),凌玉標(biāo);江埡碾壓混凝土大壩主要施工技術(shù)和特點(diǎn)[J];中國(guó)水利;2000年05期
2 晏紅;;土耳其第一座大型碾壓混凝土大壩[J];水電科技進(jìn)展;2002年01期
3 黎倫平,吳秀榮,溫高泵;百色水利樞紐碾壓混凝土大壩模板施工技術(shù)[J];廣西水利水電;2004年S1期
4 吳廣忠;許鵬安;齊家煊;;周寧水電站碾壓混凝土大壩施工[J];水力發(fā)電;2006年12期
5 王樹(shù)新;孫守良;;蒙古泰西爾碾壓混凝土大壩施工[J];吉林水利;2007年04期
6 ;鑄龍灘碾壓混凝土大壩精品 展大壩聯(lián)營(yíng)體風(fēng)采[J];水力發(fā)電;2007年04期
7 昝志斌;;盂縣龍華口水電站碾壓混凝土大壩規(guī)劃與施工[J];山西水利科技;2009年04期
8 劉洋;胡文;;緬甸耶瓦水電站碾壓混凝土大壩施工技術(shù)[J];民營(yíng)科技;2010年10期
9 古力那爾·買(mǎi)買(mǎi)江;;山口水電站碾壓混凝土大壩施工保溫措施[J];廣西水利水電;2010年06期
10 陳雪娟;;論碾壓混凝土大壩施工技術(shù)——以桂林恭城劉家洞水電站為例[J];企業(yè)科技與發(fā)展;2012年13期
相關(guān)會(huì)議論文 前10條
1 陳洪春;;周寧碾壓混凝土大壩施工優(yōu)化[A];碾壓混凝土筑壩技術(shù)交流論文匯編[C];2003年
2 鄧山翔;;戈蘭灘水電站碾壓混凝土大壩十大筑壩特點(diǎn)[A];中國(guó)碾壓混凝土筑壩技術(shù)(2008)[C];2008年
3 周錦華;;景洪水電站碾壓混凝土大壩施工[A];中國(guó)碾壓混凝土筑壩技術(shù)(2008)[C];2008年
4 黎倫平;吳秀榮;溫高泵;;百色水利樞紐碾壓混凝土大壩模板施工技術(shù)[A];慶祝廣西水利廳成立50周年專輯[C];2004年
5 鄧山翔;;戈蘭灘水電站碾壓混凝土大壩十大筑壩特點(diǎn)[A];2008年碾壓混凝土筑壩技術(shù)交流研討會(huì)論文集[C];2008年
6 周錦華;;景洪水電站碾壓混凝土大壩施工[A];2008年碾壓混凝土筑壩技術(shù)交流研討會(huì)論文集[C];2008年
7 苗孝哲;趙喜云;;官地碾壓混凝土大壩上游入倉(cāng)方式研究[A];2012年度碾壓混凝土筑壩技術(shù)交流研討會(huì)論文集[C];2012年
8 陳洪春;;周寧碾壓混凝土大壩施工優(yōu)化[A];中國(guó)水力發(fā)電工程學(xué)會(huì)2003年度學(xué)術(shù)年會(huì)碾壓混凝土筑壩技術(shù)交流論文匯編[C];2003年
9 官春光;趙小剛;;碾壓混凝土大壩在極多雨地區(qū)的雨季施工措施[A];中國(guó)碾壓混凝土筑壩技術(shù)(2008)[C];2008年
10 王松春;陳洪春;;棉花灘碾壓混凝土大壩施工工法的應(yīng)用[A];碾壓混凝土筑壩技術(shù)交流論文匯編[C];2003年
相關(guān)重要報(bào)紙文章 前3條
1 鄧愷;世界碾壓混凝土大壩超過(guò)380座[N];中國(guó)建材報(bào);2007年
2 劉積昆;水建集團(tuán)刷新國(guó)內(nèi)碾壓混凝土大壩取芯紀(jì)錄[N];中國(guó)經(jīng)濟(jì)導(dǎo)報(bào);2007年
3 謝鴻宏 李斌;武警水電部隊(duì)再創(chuàng)施工新紀(jì)錄[N];國(guó)家電網(wǎng)報(bào);2010年
相關(guān)碩士學(xué)位論文 前2條
1 韓可林;碾壓混凝土大壩工程的施工質(zhì)量管理研究[D];國(guó)防科學(xué)技術(shù)大學(xué);2008年
2 謝明軍;官地水電站碾壓混凝土大壩快速經(jīng)濟(jì)施工研究與應(yīng)用[D];清華大學(xué);2014年
,本文編號(hào):1827382