本文選題:實(shí)體模型 切入點(diǎn):側(cè)向引水 出處:《人民長江》2016年03期 論文類型:期刊論文
【摘要】:多沙河流取水口泥沙淤積問題一直困擾著引水樞紐工程的安全運(yùn)行。以我國西北地區(qū)某火電廠引水工程為例,針對導(dǎo)流墻體型參數(shù)對取水口前沖沙效果的影響,進(jìn)行了水工實(shí)體模型試驗(yàn)研究。試驗(yàn)研究過程中采用了潛沒式、露頂式以及復(fù)合式3種不同型式的導(dǎo)流墻,觀測了不同型式導(dǎo)流墻在多種流量下的沖沙效果,在理論分析的基礎(chǔ)上,提出了關(guān)于取水口防沙方面的導(dǎo)流墻體型選擇建議。
[Abstract]:The problem of sediment deposition at the intake point of a sandy river has been puzzling the safe operation of the diversion project. Taking the diversion project of a thermal power plant in the northwest of China as an example, the influence of the parameters of the diversion wall on the effect of the forward scouring of the intake port is discussed. The hydraulic solid model test was carried out. In the course of the experiment, three different types of diversion walls were used, which were submersible type, exposed roof type and composite type. The scouring effect of different types of diversion wall under various flow rates was observed. On the basis of theoretical analysis, some suggestions on the selection of diversion wall type are put forward.
【作者單位】: 河海大學(xué)水利水電學(xué)院;
【基金】:國家自然科學(xué)基金項(xiàng)目(51179057)
【分類號】:TV67
【相似文獻(xiàn)】
相關(guān)期刊論文 前9條
1 張紅亞;湯利華;;氧化溝導(dǎo)流墻偏心設(shè)置的探討[J];安徽理工大學(xué)學(xué)報(bào)(自然科學(xué)版);2007年02期
2 陳威;柳溪;;氧化溝中導(dǎo)流墻二維水流流態(tài)模擬研究[J];市政技術(shù);2011年01期
3 陳志瀾;楊人衛(wèi);;新型波紋板導(dǎo)流墻氧化溝水力特性的數(shù)值模擬[J];環(huán)境工程;2010年02期
4 陳志瀾;楊人衛(wèi);;導(dǎo)流墻偏置位置對氧化溝性能影響的分析[J];環(huán)境科學(xué)與技術(shù);2010年10期
5 荊岫巖,董毓新,張恩搏;白山電站一期尾水導(dǎo)流墻對機(jī)組出力影響的研究[J];水利水電技術(shù);1998年04期
6 牛云峰;趙凡;張改紅;;淺談水閘導(dǎo)流墻的設(shè)計(jì)[J];黑龍江科技信息;2009年32期
7 蘇衛(wèi)強(qiáng);代婧;李南輝;黃達(dá)海;;考慮不同太陽輻射模型的混凝土導(dǎo)流墻溫度場研究[J];水力發(fā)電;2013年05期
8 朱維軒;田寶義;李辰;;南水北調(diào)西河水源地預(yù)沉池流場分布模擬及優(yōu)化[J];中國給水排水;2014年09期
9 ;[J];;年期
相關(guān)碩士學(xué)位論文 前1條
1 翟興濤;溢洪道泄槽不同彎道條件與導(dǎo)流墻布置方案水流特性試驗(yàn)研究[D];山東農(nóng)業(yè)大學(xué);2014年
,本文編號:1556881
本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1556881.html