土石壩施工與運(yùn)行風(fēng)險(xiǎn)綜合評(píng)價(jià)

發(fā)布時(shí)間:2018-03-02 04:38

  本文關(guān)鍵詞: 土石壩 風(fēng)險(xiǎn) 識(shí)別 漫壩 突變?cè)u(píng)價(jià) 標(biāo)準(zhǔn) 出處:《鄭州大學(xué)》2016年博士論文 論文類型:學(xué)位論文


【摘要】:土石壩施工期為風(fēng)險(xiǎn)事件高發(fā)期,導(dǎo)致工程建設(shè)目標(biāo)的協(xié)同管理存在較大困難,其運(yùn)行期潛在發(fā)生的事故也對(duì)下游人民群眾的生命、財(cái)產(chǎn)安全造成了一定威脅。對(duì)不同階段風(fēng)險(xiǎn)的正確認(rèn)識(shí)和合理評(píng)價(jià)是大壩設(shè)計(jì)、施工與運(yùn)行管理的基礎(chǔ),而目前關(guān)于土石壩施工和運(yùn)行階段的風(fēng)險(xiǎn)分析與評(píng)價(jià)尚存在明顯不足。因此,本文在國家自然科學(xué)基金面上項(xiàng)目(51379192)、鄭州大學(xué)水利與環(huán)境學(xué)院優(yōu)秀博士論文培育基金的資助下,進(jìn)行土石壩施工與運(yùn)行風(fēng)險(xiǎn)綜合評(píng)價(jià)研究,主要工作和成果如下:(1)土石壩施工期風(fēng)險(xiǎn)因子動(dòng)態(tài)識(shí)別;诨魻柸S結(jié)構(gòu)理論,在研究土石壩施工期風(fēng)險(xiǎn)形成路徑的基礎(chǔ)上,根據(jù)施工階段的劃分,采用WBS-RBS矩陣從知識(shí)維、邏輯維和時(shí)間維三個(gè)角度構(gòu)建土石壩施工期風(fēng)險(xiǎn)動(dòng)態(tài)評(píng)價(jià)指標(biāo)體系;引入logistic回歸分析理論,作為專家經(jīng)驗(yàn)的有效補(bǔ)充,主客觀相結(jié)合進(jìn)行風(fēng)險(xiǎn)因子相對(duì)重要性排序。(2)土石壩施工期漫壩風(fēng)險(xiǎn)動(dòng)態(tài)分析。在分析影響土石壩施工期漫壩風(fēng)險(xiǎn)的上游來水、導(dǎo)流建筑物泄流能力和擋水建筑物頂部高程等關(guān)鍵因素不確定性基礎(chǔ)上,基于Monte-Carlo方法模擬水文、水力和施工進(jìn)度,建立了土石壩施工期漫壩風(fēng)險(xiǎn)動(dòng)態(tài)分析模型,揭示相關(guān)因素不確定性對(duì)于土石壩施工期漫壩風(fēng)險(xiǎn)的影響特性。(3)土石壩施工期多目標(biāo)風(fēng)險(xiǎn)分析。采用S型曲線分布作為擬合函數(shù),將常規(guī)突變?cè)u(píng)價(jià)值映射到底層指標(biāo)隸屬度上得到改進(jìn)的突變?cè)u(píng)價(jià)值,解決常規(guī)突變?cè)u(píng)價(jià)法存在的突變?cè)u(píng)價(jià)值過高、優(yōu)劣方案的突變?cè)u(píng)價(jià)值過于接近的問題。將改進(jìn)的方法應(yīng)用于土石壩施工期安全、質(zhì)量、進(jìn)度和成本等多目標(biāo)風(fēng)險(xiǎn)分析,分析結(jié)果更具客觀性的同時(shí)也更為清晰。(4)土石壩運(yùn)行期風(fēng)險(xiǎn)評(píng)價(jià)。結(jié)合國內(nèi)水庫大壩安全現(xiàn)狀及其他行業(yè)已有風(fēng)險(xiǎn)標(biāo)準(zhǔn),考慮經(jīng)濟(jì)、社會(huì)發(fā)展水平及群眾對(duì)于風(fēng)險(xiǎn)接受意愿,對(duì)風(fēng)險(xiǎn)標(biāo)準(zhǔn)相關(guān)參數(shù)的選取進(jìn)行針對(duì)性地分析論證,采用ALARP準(zhǔn)則和F-N曲線構(gòu)建與現(xiàn)行安全標(biāo)準(zhǔn)有效銜接的中國水庫大壩風(fēng)險(xiǎn)標(biāo)準(zhǔn),可有效評(píng)價(jià)土石壩運(yùn)行期各種工況下的風(fēng)險(xiǎn)水平。
[Abstract]:The construction period of earth-rock dam is a period of high risk events, which leads to great difficulties in cooperative management of engineering construction objectives, and the potential accidents occurring during its operation period are also of great importance to the lives of the people in the lower reaches. The correct understanding and reasonable evaluation of the risk in different stages are the basis of dam design, construction and operation management. However, the risk analysis and evaluation of earth-rock dam in construction and operation stage are obviously insufficient. Therefore, this paper is supported by the National Natural Science Foundation project No. 513791922, and the excellent doctoral thesis cultivation Fund of the School of Water Conservancy and Environment, Zhengzhou University. The main work and results are as follows: 1) dynamic identification of risk factors during earth-rock dam construction. Based on Hall's three-dimensional structure theory, the risk formation path of earth-rock dam during construction period is studied. According to the division of construction stage, WBS-RBS matrix is used to construct dynamic evaluation index system of earth-rock dam risk during construction period from three angles: knowledge dimension, logic dimension and time dimension, and logistic regression analysis theory is introduced as an effective supplement to expert experience. Combining subjective and objective factors, the relative importance of risk factors is ranked. 2) dynamic analysis of overrun risk during earth-rock dam construction. Based on the uncertainty of key factors, such as discharge capacity of diversion buildings and top elevation of retaining structures, a dynamic risk analysis model for embankment dam during construction period is established based on the simulation of hydrology, hydraulics and construction schedule by Monte-Carlo method. This paper reveals the influence of uncertainty of related factors on the risk of embankment during the construction of earth-rock dam. (3) Multi-objective risk analysis of earth-rock dam during construction. The S-curve distribution is used as the fitting function. The conventional catastrophe evaluation value is mapped to the improved mutation evaluation value on the subordinate degree of the underlying index, which solves the problem that the mutation evaluation value of the conventional mutation evaluation method is too high. The improved method is applied to multi-objective risk analysis, such as safety, quality, schedule and cost of earth-rock dam during construction. The results of the analysis are more objective and clear. 4) risk assessment of earth-rock dams during operation. Considering the present situation of dam safety in domestic reservoirs and the existing risk standards in other industries, considering the economic, social development level and the willingness of the masses to accept risks, The selection of the relevant parameters of the risk standard is analyzed and demonstrated, and the ALARP criterion and F-N curve are used to construct the Chinese reservoir dam risk standard which is effectively connected with the current safety standards. It can effectively evaluate the risk level of earth-rock dam under various operating conditions.
【學(xué)位授予單位】:鄭州大學(xué)
【學(xué)位級(jí)別】:博士
【學(xué)位授予年份】:2016
【分類號(hào)】:TV641

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 林昭;土石壩設(shè)計(jì)應(yīng)重視工程實(shí)踐經(jīng)驗(yàn)[J];水利水電工程設(shè)計(jì);2005年02期

2 李天科;劉斌;李君;周建;張春富;;土石壩老化評(píng)價(jià)方法研究[J];中國農(nóng)村水利水電;2007年04期

3 張勝東;;淺談土石壩設(shè)計(jì)若干問題[J];安徽農(nóng)學(xué)通報(bào);2007年16期

4 ;水利部科技成果重點(diǎn)推廣計(jì)劃項(xiàng)目《堤防及土石壩工程自動(dòng)監(jiān)測(cè)和安全評(píng)價(jià)系統(tǒng)》通過驗(yàn)收[J];長(zhǎng)江科學(xué)院院報(bào);2009年S1期

5 李芳敏;劉海秋;;淺談土石壩的施工[J];中小企業(yè)管理與科技(上旬刊);2010年06期

6 田川;李巍;;土石壩潰壩原因分析[J];現(xiàn)代農(nóng)業(yè)科技;2011年01期

7 李廣森;;土石壩的施工[J];民營科技;2011年03期

8 黃少文;;公路邊坡與土石壩淺述[J];廣東建材;2011年03期

9 曹國慶;孫蘭鳳;;小型土石壩工程除險(xiǎn)問題探討[J];水利天地;2011年08期

10 孟紅;;土石壩設(shè)計(jì)中的接合部位的處理[J];科技創(chuàng)業(yè)家;2013年06期

相關(guān)會(huì)議論文 前10條

1 劉瑛珍;;編后語——總結(jié)經(jīng)驗(yàn),取精用弘,提高土石壩工程技術(shù)水平[A];土石壩與巖土力學(xué)技術(shù)研討會(huì)論文集[C];2001年

2 姚立軍;;病險(xiǎn)土石壩整治問題的方法探討[A];福建省第十屆水利水電青年學(xué)術(shù)交流會(huì)論文集[C];2006年

3 王超;陳立秋;張殿雙;胡順志;鄭軍;;土石壩工程基礎(chǔ)處理設(shè)計(jì)[A];土石壩技術(shù)——2008年論文集[C];2008年

4 黃銘;劉俊;;土石壩填筑期實(shí)測(cè)沉降的因果監(jiān)測(cè)模型分析[A];全國巖土與工程學(xué)術(shù)大會(huì)論文集(上冊(cè))[C];2003年

5 張麟;高玉峰;;土石壩二維地震反應(yīng)有限元計(jì)算的影響因素研究[A];第一屆中國水利水電巖土力學(xué)與工程學(xué)術(shù)討論會(huì)論文集(上冊(cè))[C];2006年

6 楊少俊;楊朝娜;;土石壩潰壩的成因分析與防治措施[A];2011全國灌區(qū)信息化建設(shè)與防滲抗凍脹新技術(shù)應(yīng)用?痆C];2011年

7 楊朝娜;楊少俊;;土石壩潰壩的成因分析與防治措施[A];2012全國灌區(qū)信息化建設(shè)與防滲抗凍脹技術(shù)專刊[C];2012年

8 楊少俊;楊朝娜;;土石壩潰壩的成因分析與防治措施[A];2012全國灌區(qū)信息化建設(shè)與防滲抗凍脹技術(shù)?痆C];2012年

9 蔣國澄;;特殊土石壩材料的研究[A];海峽兩岸土力學(xué)及基礎(chǔ)工程地工技術(shù)學(xué)術(shù)研討會(huì)論文集[C];1994年

10 酈能惠;沈珠江;;土石壩工程研究新進(jìn)展[A];中國水利學(xué)會(huì)2001學(xué)術(shù)年會(huì)論文集[C];2001年

相關(guān)重要報(bào)紙文章 前2條

1 水利部大壩安全管理中心 李君純 盛金保;國外土石壩應(yīng)對(duì)強(qiáng)地震的經(jīng)驗(yàn)[N];中國水利報(bào);2008年

2 本報(bào)記者 李志杰 趙洪濤;樂在水利勤耕耘[N];中國水利報(bào);2007年

相關(guān)博士學(xué)位論文 前10條

1 王薇;土石壩安全風(fēng)險(xiǎn)分析方法研究[D];天津大學(xué);2012年

2 葛巍;土石壩施工與運(yùn)行風(fēng)險(xiǎn)綜合評(píng)價(jià)[D];鄭州大學(xué);2016年

3 田景元;土石壩多點(diǎn)輸入地震反應(yīng)分析及相關(guān)方法研究[D];河海大學(xué);2003年

4 黃紅女;土石壩安全測(cè)控理論與技術(shù)的研究及應(yīng)用[D];河海大學(xué);2005年

5 李湛;土石壩地震永久變形及抗震穩(wěn)定性數(shù)值分析方法研究[D];大連理工大學(xué);2006年

6 程嵩;土石壩地震動(dòng)輸入機(jī)制與變形規(guī)律研究[D];清華大學(xué);2012年

7 李宗坤;土石壩結(jié)構(gòu)性態(tài)安全評(píng)價(jià)方法研究[D];大連理工大學(xué);2003年

8 周江平;土石壩抗滑穩(wěn)定性與砂層地基液化的可靠度理論與應(yīng)用[D];西南交通大學(xué);2004年

9 阮光雄;土工結(jié)構(gòu)有限單元法分析[D];武漢大學(xué);2004年

10 楊昕光;土石壩抗震穩(wěn)定的極限能力分析[D];大連理工大學(xué);2014年

相關(guān)碩士學(xué)位論文 前10條

1 侯玉成;土石壩健康診斷理論與方法研究[D];河海大學(xué);2005年

2 黃海鵬;土石壩服役風(fēng)險(xiǎn)及安全評(píng)估方法研究[D];南昌大學(xué);2015年

3 王海峰;土石壩地震加速度反應(yīng)特性與抗震措施研究[D];中國水利水電科學(xué)研究院;2015年

4 劉倬昀;基于流固耦合分析下分區(qū)土石壩優(yōu)化研究[D];西北農(nóng)林科技大學(xué);2015年

5 趙曉龍;土石壩粘土心墻固結(jié)及破壞影響因素試驗(yàn)研究[D];山東農(nóng)業(yè)大學(xué);2015年

6 陳康;基于可靠度理論的土石壩壩坡穩(wěn)定分析[D];西華大學(xué);2015年

7 劉興芳;基于可靠度的土石壩風(fēng)險(xiǎn)分析及維修策略研究[D];山東大學(xué);2008年

8 欒艷;土石壩滲透規(guī)律與滲漏機(jī)理研究[D];重慶交通大學(xué);2009年

9 王勝群;病險(xiǎn)土石壩滲透規(guī)律的模型試驗(yàn)與數(shù)值模擬研究[D];重慶交通大學(xué);2010年

10 歐陽君;土石壩結(jié)構(gòu)穩(wěn)定的靜動(dòng)力非線性有限元分析[D];新疆農(nóng)業(yè)大學(xué);2010年



本文編號(hào):1555072

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/shuiwenshuili/1555072.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶6c821***提供,本站僅收錄摘要或目錄,作者需要?jiǎng)h除請(qǐng)E-mail郵箱bigeng88@qq.com