鉆井過(guò)程即時(shí)評(píng)價(jià)垮塌層位井壁穩(wěn)定性研究
本文關(guān)鍵詞:鉆井過(guò)程即時(shí)評(píng)價(jià)垮塌層位井壁穩(wěn)定性研究 出處:《中國(guó)石油大學(xué)(華東)》2015年碩士論文 論文類型:學(xué)位論文
更多相關(guān)文章: 點(diǎn)荷載實(shí)驗(yàn) 巖石強(qiáng)度 即時(shí)評(píng)價(jià) 鉆井掉塊 井壁穩(wěn)定
【摘要】:井壁不穩(wěn)定是鉆井工程中普遍存在的問(wèn)題,至今未能完全解決,井壁圍巖失穩(wěn)所造成的鉆井質(zhì)量和安全問(wèn)題,不但每年耗損大量的人力物力,并且嚴(yán)重制約了油氣的勘測(cè)開(kāi)發(fā)步伐,所以,對(duì)于地下復(fù)雜的圍巖環(huán)境準(zhǔn)確的了解和認(rèn)識(shí),探尋井壁穩(wěn)定機(jī)理,創(chuàng)建預(yù)測(cè)原理和控制方法,是實(shí)現(xiàn)優(yōu)質(zhì)、安全、高效和低成本鉆井的關(guān)鍵。研究井壁穩(wěn)定問(wèn)題,首先要獲取地層相關(guān)參數(shù),傳統(tǒng)巖石力學(xué)參數(shù)是通過(guò)室內(nèi)三軸實(shí)驗(yàn)獲取,室內(nèi)實(shí)驗(yàn)需要一定規(guī)格尺寸的巖樣,而現(xiàn)場(chǎng)的取心工作,不僅取心成本較高,且在多數(shù)情況下無(wú)法取到符合實(shí)驗(yàn)條件的巖樣,因此地層參數(shù)的獲取就遇到了瓶頸。針對(duì)該問(wèn)題,本文從鉆井過(guò)程中鉆遇的巖屑或掉塊著手,利用點(diǎn)荷載實(shí)驗(yàn)儀,研究了不同形狀、不同尺寸壓模對(duì)不同尺度鉆井巖屑?jí)喝氲南鄳?yīng)特征,優(yōu)選出適合不同地層類型的壓模形狀和尺寸。通過(guò)對(duì)實(shí)際區(qū)塊巖樣的點(diǎn)荷載實(shí)驗(yàn),結(jié)合相關(guān)理論分析,得出了通過(guò)點(diǎn)荷載實(shí)驗(yàn)計(jì)算巖石強(qiáng)度參數(shù),彈性參數(shù)的方法,并建立了點(diǎn)荷載實(shí)驗(yàn)的標(biāo)準(zhǔn)程序。通過(guò)對(duì)研究區(qū)塊不同深度巖屑或掉塊的點(diǎn)荷載等實(shí)驗(yàn),給出了一種即時(shí)進(jìn)行地層坍塌壓力,破裂壓力的計(jì)算方法,確定了合理的安全鉆井密度窗口,實(shí)時(shí)的對(duì)該井的井壁穩(wěn)定性進(jìn)行了評(píng)價(jià)分析。最后通過(guò)獲取該井測(cè)井?dāng)?shù)據(jù)和井史資料等,利用傳統(tǒng)方法對(duì)該井進(jìn)行三壓力計(jì)算,分析了該井井眼垮塌的特征,推薦出鉆進(jìn)該井段的鉆井液密度。通過(guò)對(duì)該井地層三壓力鉆后評(píng)價(jià),并與即時(shí)監(jiān)測(cè)計(jì)算結(jié)果的對(duì)比分析,表明即時(shí)監(jiān)測(cè)方法計(jì)算的地層坍塌壓力基本符合現(xiàn)場(chǎng)鉆井要求,但存在一定的誤差,對(duì)于實(shí)際的生產(chǎn)需求有一定的指導(dǎo)意義。
[Abstract]:Shaft wall instability is a common problem in drilling engineering, which has not been completely solved. The drilling quality and safety problems caused by wall rock instability not only consume a lot of manpower and material resources every year. And has seriously restricted the oil and gas exploration and development step, therefore, for the underground complex surrounding rock environment accurate understanding and understanding, seeks for the wellbore stability mechanism, establishes the forecast principle and the control method, is realizes the high quality, the safety. The key to high efficiency and low cost drilling. To study the stability of borehole lining, we must first obtain the formation related parameters. The traditional rock mechanics parameters are obtained through laboratory triaxial experiments, and the laboratory experiments need rock samples of certain specifications. However, in the field coring work, not only the cost of coring is high, but also the rock samples that meet the experimental conditions can not be obtained in most cases, so the formation parameters are met with a bottleneck. In this paper, the characteristics of different shapes and sizes of cuttings are studied by using the point load tester, starting from the cuttings or falling blocks in the drilling process. The shape and size of the compression die suitable for different stratum types are selected. Through the point load experiment of the rock sample of the actual block and the relevant theoretical analysis, the rock strength parameters are calculated through the point load experiment. The method of elastic parameters and the standard program of point load experiment are established. Through the experiments of cuttings or falling blocks at different depth in the study block, a kind of immediate collapse pressure is given. According to the calculation method of fracture pressure, the reasonable safe drilling density window is determined, and the stability of the well wall is evaluated and analyzed in real time. Finally, the logging data and the well history data are obtained. By using the traditional method to calculate the three pressure of the well, the characteristics of hole collapse are analyzed, and the drilling fluid density of this section is recommended. The comparison and analysis with the results of real-time monitoring show that the formation collapse pressure calculated by the real-time monitoring method basically accords with the requirements of drilling on the spot, but there are some errors. For the actual production demand has certain guiding significance.
【學(xué)位授予單位】:中國(guó)石油大學(xué)(華東)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TE21
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 金衍,陳勉;利用地震記錄鉆前預(yù)測(cè)井壁穩(wěn)定性研究[J];石油學(xué)報(bào);2004年01期
2 魏春光;萬(wàn)天豐;接維強(qiáng);;構(gòu)造應(yīng)力場(chǎng)與井壁穩(wěn)定性關(guān)系的探索[J];石油科技論壇;2006年02期
3 周長(zhǎng)江;劉向君;張卓;劉洪;;水平氣井井壁穩(wěn)定性研究[J];天然氣工業(yè);2006年08期
4 張韻晗;陸書(shū)峰;;海塔盆地井壁穩(wěn)定性研究[J];科學(xué)技術(shù)與工程;2011年28期
5 馮永存;李曉蓉;蔚寶華;鄧金根;;壓力衰減儲(chǔ)層直井井壁穩(wěn)定性研究[J];長(zhǎng)江大學(xué)學(xué)報(bào)(自然科學(xué)版);2011年10期
6 馮永存;鄧金根;李曉蓉;蔚寶華;;井壁穩(wěn)定性評(píng)價(jià)準(zhǔn)則分析[J];斷塊油氣田;2012年02期
7 溫慶陽(yáng);楊秀娟;楊恒林;閆相禎;;基于尖點(diǎn)位移突變模型的井壁穩(wěn)定性分析[J];科學(xué)技術(shù)與工程;2012年13期
8 尹虎;李黔;郭亮;蔣理波;李強(qiáng);;離散單元法評(píng)價(jià)煤層井壁穩(wěn)定性[J];天然氣工業(yè);2012年11期
9 李健鷹;邱正松;程遠(yuǎn)芳;;井壁穩(wěn)定性研究新進(jìn)展[J];油田化學(xué);1992年03期
10 朱佑國(guó),曹光保,呂淵,姜玉松,劉普地,虞咸祥,盧如意;龍東礦副井井壁穩(wěn)定性監(jiān)測(cè)[J];中州煤炭;1995年03期
相關(guān)會(huì)議論文 前3條
1 屈平;申瑞臣;楊恒林;李景翠;董勝偉;;節(jié)理煤層井壁穩(wěn)定性的評(píng)價(jià)方法研究[A];2008年煤層氣學(xué)術(shù)研討會(huì)論文集[C];2008年
2 彭智高;劉升貴;陳含;付裕;張晶;;力學(xué)在煤層氣分支井連接段井壁穩(wěn)定性問(wèn)題中的應(yīng)用[A];北京力學(xué)會(huì)第20屆學(xué)術(shù)年會(huì)論文集[C];2014年
3 陳浩;王秀明;;巖石三階彈性常數(shù)實(shí)驗(yàn)測(cè)量初步[A];2008年全國(guó)聲學(xué)學(xué)術(shù)會(huì)議論文集[C];2008年
相關(guān)博士學(xué)位論文 前4條
1 郭春華;井眼應(yīng)力分布模擬及井壁穩(wěn)定性研究[D];成都理工大學(xué);2011年
2 楊敬源;井壁穩(wěn)定性若干力學(xué)問(wèn)題的研究[D];哈爾濱工程大學(xué);2009年
3 梁利喜;深部應(yīng)力場(chǎng)系統(tǒng)評(píng)價(jià)與油氣井井壁穩(wěn)定性分析研究[D];成都理工大學(xué);2008年
4 冉利民;鎮(zhèn)涇油田地應(yīng)力研究及其應(yīng)用[D];中國(guó)地質(zhì)大學(xué);2014年
相關(guān)碩士學(xué)位論文 前10條
1 鄭蓮慧;新場(chǎng)須五地層井壁穩(wěn)定性分析[D];成都理工大學(xué);2015年
2 甘建國(guó);基于地震資料的井壁穩(wěn)定性預(yù)測(cè)及分析[D];東北石油大學(xué);2015年
3 陽(yáng)文發(fā);海坨子地區(qū)地層穩(wěn)定性剖面研究[D];東北石油大學(xué);2015年
4 羅威;泥頁(yè)巖地層井壁穩(wěn)定性研究及軟件編制[D];西安石油大學(xué);2016年
5 陳沖;鉆井過(guò)程即時(shí)評(píng)價(jià)垮塌層位井壁穩(wěn)定性研究[D];中國(guó)石油大學(xué)(華東);2015年
6 梁濤;地應(yīng)力與井壁穩(wěn)定性關(guān)系研究[D];中國(guó)地質(zhì)大學(xué)(北京);2012年
7 趙永富;地應(yīng)力反演方法及井壁穩(wěn)定性研究[D];天津大學(xué);2008年
8 高銘澤;徐家圍地區(qū)裂縫地層井壁穩(wěn)定性研究[D];大慶石油學(xué)院;2009年
9 和志浩;煤巖井壁穩(wěn)定性的巖石力學(xué)基礎(chǔ)研究[D];西南石油大學(xué);2013年
10 劉錫勝;勝利油田牛莊地區(qū)井壁穩(wěn)定性分析[D];中國(guó)石油大學(xué);2007年
,本文編號(hào):1403585
本文鏈接:http://sikaile.net/kejilunwen/shiyounenyuanlunwen/1403585.html