KDN船用設(shè)備制造企業(yè)搬遷項目進度管理研究

發(fā)布時間:2019-05-17 15:14
【摘要】:隨著船舶制造業(yè)的不斷發(fā)展,船用設(shè)備制造企業(yè)面臨的競爭不斷加劇,在《船舶工業(yè)調(diào)整和振興規(guī)劃》的指導(dǎo)下,許多船用設(shè)備制造企業(yè)實施產(chǎn)業(yè)重組,開展企業(yè)搬遷項目。如何在保證企業(yè)穩(wěn)定與發(fā)展的前提下,建立船用設(shè)備制造企業(yè)搬遷項目進度管理模式,實現(xiàn)企業(yè)生產(chǎn)與搬遷兩不誤。因此,在搬遷過程中實施合理的項目進度管理顯得尤為重要。 項目進度管理包含了項目按時完成所必需實施的各項工程。本文以KDN船用設(shè)備制造企業(yè)搬遷項目為載體,將理論與實踐有機結(jié)合,首先通過對船用設(shè)備制造企業(yè)搬遷項目背景與意義的研究,探討搬遷過程中的搬遷進度控制難點,并從企業(yè)搬遷實際出發(fā),構(gòu)建船用設(shè)備企業(yè)搬遷項目進度管理模式。其次詳細闡述了項目進度管理相關(guān)理論在KDN船用設(shè)備制造企業(yè)搬遷項目進度計劃中的運用,最后論述了運用項目進度控制理論對搬遷項目進行監(jiān)測、控制的過程。 本文將項目進度管理理論運用在KDN船用設(shè)備制造企業(yè)搬遷項目的進度管理與控制上,對于提高船用設(shè)備制造企業(yè)搬遷項目進度管理水平,具有一定的借鑒意義。
[Abstract]:With the continuous development of marine equipment manufacturing industry, the competition faced by marine equipment manufacturing enterprises is becoming more and more intensive. under the guidance of "Shipbuilding Industry Adjustment and Revitalization Planning", many marine equipment manufacturing enterprises carry out industrial restructuring and carry out enterprise relocation projects. On the premise of ensuring the stability and development of the enterprise, how to establish the schedule management mode of the relocation project of the marine equipment manufacturing enterprise, and realize the production and relocation of the enterprise. Therefore, it is particularly important to implement reasonable project schedule management in the process of relocation. Project schedule management includes all the projects necessary for the project to be completed on time. In this paper, the relocation project of KDN marine equipment manufacturing enterprises is taken as the carrier, and the theory and practice are combined organically. Firstly, through the study of the background and significance of the relocation project of marine equipment manufacturing enterprises, the difficulties of relocation progress control in the process of relocation are discussed. According to the reality of enterprise relocation, the schedule management mode of marine equipment enterprise relocation project is constructed. Secondly, it expounds in detail the application of project schedule management theory in the relocation project schedule plan of KDN marine equipment manufacturing enterprises, and finally discusses the process of monitoring and controlling the relocation project by using the project schedule control theory. In this paper, the project schedule management theory is applied to the schedule management and control of the relocation project of KDN marine equipment manufacturing enterprises, which has certain reference significance for improving the progress management level of the relocation project of marine equipment manufacturing enterprises.
【學(xué)位授予單位】:南京理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU722;U673

【參考文獻】

相關(guān)期刊論文 前10條

1 趙大利 ,趙亞平;我國船用設(shè)備制造業(yè)發(fā)展現(xiàn)狀及對策[J];中國創(chuàng)業(yè)投資與高科技;2004年11期

2 臧濤;;對工程項目管理中進度管理模式的幾點認識[J];發(fā)展;2007年08期

3 馬國豐,屠梅曾;制約因素在項目進度管理的應(yīng)用[J];管理工程學(xué)報;2002年04期

4 曹惠芬;;“十一五”我國船用設(shè)備發(fā)展思路與原則探討[J];船艇;2006年10期

5 王延樹,葉旺泉,王春明;項目結(jié)構(gòu)分解在施工管理中的作用及應(yīng)用[J];基建優(yōu)化;2000年02期

6 鄒瓊;;淺論六西格瑪在項目進度控制中的應(yīng)用[J];技術(shù)經(jīng)濟與管理研究;2007年01期

7 王劍;;關(guān)鍵鏈方法在項目進度管理中的應(yīng)用研究[J];山西建筑;2010年03期

8 丁祥海,唐任仲;項目管理中創(chuàng)新知識管理的研究[J];科研管理;2002年02期

9 劉圣勇;;中外船舶配套產(chǎn)業(yè)發(fā)展現(xiàn)狀分析[J];商業(yè)經(jīng)濟;2012年24期

10 楊克斯 ,葉亮軍;技術(shù)創(chuàng)新的項目管理組織模型[J];企業(yè)改革與管理;2004年09期

,

本文編號:2479198

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2479198.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶fa8af***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com