BT代建制及其風(fēng)險(xiǎn)與對(duì)策分析
[Abstract]:In the past 20 or 30 years, our country has been engaged in continuous development and construction, and great achievements have been made, which is inseparable from our active exploration and introduction of advanced production management mode and innovation and expansion combined with the actual national conditions of our country. From the agent construction mode to the BT construction mode, and then to the recent BT agent construction mode, we explore the advanced capital construction mode in line with the national conditions of our country, and the advanced construction mode also has great risks. Accurately grasp the relevant laws and regulations of BT agent system and understand the risk of BT agent system and understand the strategy of risk aversion to improve efficiency and efficiency, save cost and allocate resources reasonably to owners and agent construction units. It is of great benefit to ensure the harmonious and rapid development of the state and enterprises. By expounding and summarizing the source, concept and development trend of BT, agent system and its combination construction mode at home and abroad, this paper first analyzes its emergence, development, main form and mode essence. Accurately grasp the relevant concepts and compare with some foreign advanced construction models. Secondly, it analyzes and puts forward the risks faced by the agent construction unit and the owner under this mode at this stage, through the risk of the agent construction party in each implementation stage of the project (that is, the risk at the time of signing the agent construction contract, the risk of the project construction period). The risk after the completion of the project construction) and the internal and external environmental risk of the agent to analyze the risk of the agent; The risk analysis of the owner is mainly through the following ways, such as imperfect laws and regulations, project preparation, honesty, overlap between the old system and the agent construction system, and so on. Then by finding out the reasons to analyze the methods to reduce the risks of all parties, we can realize the risks of BT agent system and understand the countermeasures to avoid risks, so as to improve the efficiency and efficiency of production management, promote the harmonious development of social infrastructure, and invest and build. Reasonable separation of management, effective control of investment quotas, saving resources, ensuring the interests and development of the state and construction units; Finally, through the summary of the theme of this paper, combined with the reality, this paper analyzes the related risks and countermeasures, in order to avoid reducing risks, saving costs, reasonable construction and harmonious development in the initial stage.
【學(xué)位授予單位】:長(zhǎng)安大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 李維平,蔡金墀;工程建設(shè)監(jiān)理行業(yè)的現(xiàn)狀及發(fā)展趨勢(shì)[J];北京建筑工程學(xué)院學(xué)報(bào);2001年S1期
2 梁獨(dú)朕;;代建制實(shí)踐中相關(guān)問題探討[J];中國工程咨詢;2005年12期
3 龍穎萃;;代建制與國外工程項(xiàng)目管理的比較[J];中國工程咨詢;2008年04期
4 趙亮;;對(duì)當(dāng)前建設(shè)工程監(jiān)理現(xiàn)狀的思考[J];工程與建設(shè);2006年04期
5 郭漢丁;論建設(shè)工程質(zhì)量政府監(jiān)督管理機(jī)制[J];華東交通大學(xué)學(xué)報(bào);2005年05期
6 何琴;;基于委托——代理理論的代建制風(fēng)險(xiǎn)管理[J];建筑管理現(xiàn)代化;2006年01期
7 顧琰;王利軍;;建設(shè)項(xiàng)目管理模式應(yīng)用探討[J];建筑管理現(xiàn)代化;2006年04期
8 閔紅;;對(duì)政府投資代建項(xiàng)目采用BT融資建設(shè)管理的探討[J];機(jī)電信息;2008年26期
9 孟憲海;馮念一;;代建制相關(guān)問題之研討[J];建筑經(jīng)濟(jì);2005年12期
10 方俊;;論政府投資建設(shè)項(xiàng)目委托代建招投標(biāo)管理[J];建筑經(jīng)濟(jì);2006年02期
相關(guān)碩士學(xué)位論文 前2條
1 曾戈君;國際工程項(xiàng)目管理模式及其應(yīng)用研究[D];西北工業(yè)大學(xué);2004年
2 李靜;應(yīng)用代建制模式若干問題的探討[D];河海大學(xué);2005年
本文編號(hào):2474056
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2474056.html