基于模糊粗糙集方法的國(guó)際工程項(xiàng)目承包風(fēng)險(xiǎn)評(píng)價(jià)研究
[Abstract]:With the development of economic globalization, under the macro-strategy of "going out", the contracting engineering enterprises in our country have got rapid development. As of the first half of 2012, more than 180 countries and regions all over the world have contracted projects by contractors in our country. The scope of coverage and the number of labor cooperation continues to grow. However, compared to contracting domestic projects, the amount of contracts for international projects is relatively large, involving a wide range of projects, more specialties and more disciplines, and it is bound to face fierce competition with contractors in other developed countries. There are many risks from politics, economy, culture, law and market, but our contracting enterprises have not established and implemented effective risk management procedures. This paper analyzes and expounds the risk management of international engineering project contracting from the perspective of Chinese contractor, respectively from the characteristics of international engineering project. The risk essence of the international engineering project and the whole process of the implementation of the international engineering project are analyzed and studied in an all-round way. Firstly, the paper summarizes the basic theory of international engineering project contracting risk, analyzes the characteristics of international engineering project and international engineering project contracting risk, and probes into the generating mechanism of international engineering project contracting risk. The chain reaction relationship between contract risk of international engineering project is revealed. In the second step, on the basis of general risk classification, the risk factors in international project contracting are analyzed, and the list of risk factors in the whole process of international project contracting is listed. In the third step, using rough theory, the paper optimizes the assumed risk factors of 50 international engineering projects, establishes the index model, and then combines the methods of questionnaire investigation and expert consultation. Based on the hypothesis of risk evaluation index system of international engineering project contracting, 34 key risk factors which have significant influence on international engineering project contracting are obtained by empirical test. The risk evaluation index system of international project contracting has been constructed. In the fourth step, through the comparison of several comprehensive evaluation methods, the fuzzy comprehensive evaluation method is selected, and a multi-level fuzzy comprehensive evaluation model is put forward. Based on the examples of four international engineering projects, the empirical test of international engineering project contracting risk is carried out. Finally, some feasible risk prevention measures and treatment strategies are put forward for the previous analysis.
【學(xué)位授予單位】:重慶大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類(lèi)號(hào)】:TU712
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉進(jìn);葛燕鋒;;國(guó)際工程項(xiàng)目投資風(fēng)險(xiǎn)管理[J];建設(shè)監(jiān)理;2008年06期
2 劉進(jìn);葛燕鋒;;國(guó)際工程項(xiàng)目投資風(fēng)險(xiǎn)管理[J];建筑技術(shù)開(kāi)發(fā);2008年09期
3 劉九江;;國(guó)際工程項(xiàng)目施工管理[J];中國(guó)新技術(shù)新產(chǎn)品;2009年23期
4 鄭鋒景;;論國(guó)際工程中的分包管理[J];中華民居;2011年03期
5 李順濤;國(guó)際工程風(fēng)險(xiǎn)預(yù)警管理系統(tǒng)的構(gòu)建初探[J];四川建筑;2005年03期
6 趙新麗;李書(shū)全;;基于SVM的國(guó)際工程項(xiàng)目風(fēng)險(xiǎn)評(píng)價(jià)方法研究[J];吉林建筑工程學(xué)院學(xué)報(bào);2007年01期
7 楊海林;;國(guó)際工程承包企業(yè)的人力資源管理[J];工程建設(shè)與設(shè)計(jì);2009年05期
8 張安軍;;國(guó)際工程項(xiàng)目現(xiàn)場(chǎng)管理理論初探[J];江蘇建材;2009年03期
9 張安軍;;國(guó)際工程項(xiàng)目現(xiàn)場(chǎng)管理理論初探[J];中國(guó)住宅設(shè)施;2009年10期
10 周曉東;;國(guó)際工程勞務(wù)管理探討[J];四川水力發(fā)電;2010年S2期
相關(guān)會(huì)議論文 前10條
1 郭明華;;淺述國(guó)際貿(mào)易中CIF術(shù)語(yǔ)的運(yùn)用[A];機(jī)械疏浚專(zhuān)業(yè)委員會(huì)第二十次疏浚與吹填技術(shù)經(jīng)驗(yàn)交流會(huì)論文與技術(shù)經(jīng)驗(yàn)總結(jié)文集[C];2007年
2 朱茂恒;朱珊;;國(guó)外工程項(xiàng)目實(shí)施中的目標(biāo)控制[A];山東建筑學(xué)會(huì)成立50周年優(yōu)秀論文集[C];2003年
3 張占輝;;蘇丹工程施工中的HSE管理[A];第四屆石油工程焊接技術(shù)交流研討會(huì)論文集[C];2006年
4 趙平;陳文科;孫樹(shù)棟;;基于徑向基神經(jīng)網(wǎng)絡(luò)的總承包風(fēng)險(xiǎn)分析[A];2005中國(guó)控制與決策學(xué)術(shù)年會(huì)論文集(下)[C];2005年
5 原丕業(yè);杜秀云;王劍波;李晶蕾;;新世紀(jì)管理人才的能力素質(zhì)及培養(yǎng)模式[A];中國(guó)建設(shè)教育協(xié)會(huì)2004年優(yōu)秀論文參評(píng)論文集[C];2004年
6 周鳳清;;竣工驗(yàn)收在國(guó)內(nèi)工程合同與FIDIC合同中的沖突及對(duì)策[A];使命與發(fā)展——第四屆西部律師發(fā)展論壇論文集[C];2011年
7 羅雋;;關(guān)于中外合資建筑企業(yè)的現(xiàn)狀調(diào)研[A];材料科學(xué)與工程技術(shù)——中國(guó)科協(xié)第三屆青年學(xué)術(shù)年會(huì)論文集[C];1998年
8 邱國(guó)興;;電建工程與安裝工程交叉施工作業(yè)探究[A];河南省建筑業(yè)行業(yè)優(yōu)秀論文集(2009)[C];2009年
9 王德俊;;單價(jià)合同條件下投標(biāo)報(bào)價(jià)的分析[A];河南省土木建筑學(xué)會(huì)2008年學(xué)術(shù)大會(huì)論文集[C];2008年
10 耿潤(rùn)璞;姚玉玲;;加強(qiáng)我市有形建筑市場(chǎng)管理 進(jìn)一步規(guī)范建筑市場(chǎng)秩序[A];跨越發(fā)展:七省市第十屆建筑市場(chǎng)與招標(biāo)投標(biāo)優(yōu)秀論文集[C];2010年
相關(guān)重要報(bào)紙文章 前10條
1 通訊員 底建平;出色的國(guó)際工程項(xiàng)目專(zhuān)家[N];中國(guó)鐵道建筑報(bào);2011年
2 王建海;如何規(guī)避?chē)?guó)際工程項(xiàng)目中的財(cái)務(wù)風(fēng)險(xiǎn)?[N];中國(guó)冶金報(bào);2005年
3 楊寬新 通訊員 章海華;長(zhǎng)慶建設(shè)工程總公司承攬4億元國(guó)際工程項(xiàng)目[N];中國(guó)石油報(bào);2007年
4 本報(bào)記者 張新武 實(shí)習(xí)記者 王鵬;帶顆“紅心”走世界[N];石油管道報(bào);2007年
5 王春宇;國(guó)際事業(yè)部召開(kāi)工程項(xiàng)目管理調(diào)研匯報(bào)會(huì)[N];石油管道報(bào);2007年
6 廣西國(guó)際經(jīng)濟(jì)技術(shù)合作公司海外工程部 黃軍強(qiáng);履約保函 國(guó)際工程項(xiàng)目的護(hù)身符[N];國(guó)際商報(bào);2001年
7 天津大學(xué)管理學(xué)院 何伯森 程志鵬 趙珊珊;國(guó)際工程項(xiàng)目爭(zhēng)議的調(diào)解與仲裁[N];建筑時(shí)報(bào);2005年
8 楊忠;尼羅河畔的感悟[N];中國(guó)電力報(bào);2006年
9 ;CPP:世界馳名品牌 國(guó)際工程勁旅[N];中國(guó)石油報(bào);2005年
10 鮑偉偉;寧波市開(kāi)放型經(jīng)濟(jì)謀求新發(fā)展[N];國(guó)際商報(bào);2006年
相關(guān)博士學(xué)位論文 前3條
1 劉玉杰;國(guó)際工程承包戰(zhàn)略管理研究[D];天津大學(xué);2006年
2 肖利民;國(guó)際工程承包項(xiàng)目風(fēng)險(xiǎn)預(yù)警研究[D];同濟(jì)大學(xué);2006年
3 李偉;國(guó)際水電項(xiàng)目總承包風(fēng)險(xiǎn)管理研究[D];大連理工大學(xué);2012年
相關(guān)碩士學(xué)位論文 前10條
1 萬(wàn)珍珍;基于模糊粗糙集方法的國(guó)際工程項(xiàng)目承包風(fēng)險(xiǎn)評(píng)價(jià)研究[D];重慶大學(xué);2013年
2 劉彥坤;國(guó)際工程項(xiàng)目招標(biāo)談判價(jià)格決策研究[D];北京交通大學(xué);2011年
3 高萌;基于風(fēng)險(xiǎn)管理角度的國(guó)際工程項(xiàng)目?jī)?nèi)部控制研究[D];首都經(jīng)濟(jì)貿(mào)易大學(xué);2013年
4 孫永杰;國(guó)際工程項(xiàng)目與國(guó)內(nèi)建筑施工企業(yè)協(xié)同機(jī)制研究[D];山東大學(xué);2010年
5 臧日鑫;國(guó)際工程項(xiàng)目決策風(fēng)險(xiǎn)評(píng)價(jià)研究[D];石家莊鐵道大學(xué);2013年
6 曹莉莉;國(guó)際工程項(xiàng)目團(tuán)隊(duì)跨文化管理研究[D];華東理工大學(xué);2013年
7 劉淑俠;國(guó)際工程項(xiàng)目投標(biāo)階段風(fēng)險(xiǎn)管理研究[D];山東大學(xué);2012年
8 高志堅(jiān);國(guó)際工程項(xiàng)目管理—阿爾及利亞?wèn)|西高速公路[D];中國(guó)地質(zhì)大學(xué)(北京);2010年
9 梁冬玲;國(guó)際工程項(xiàng)目風(fēng)險(xiǎn)投資決策的研究[D];東北林業(yè)大學(xué);2004年
10 雷鴻飛;國(guó)際電力工程項(xiàng)目風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué);2013年
本文編號(hào):2464480
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2464480.html