壽光陽光醫(yī)院門診綜合樓建設(shè)項(xiàng)目的風(fēng)險(xiǎn)管理研究
[Abstract]:Due to the characteristics of large investment and slow recovery of funds, there may be various unforeseen factors in the construction process. If we do not take precautions, it will affect the construction and operation of the project, and even lead to serious consequences. Therefore, it is of great significance to identify and analyze the risk of the construction project and find out the corresponding control countermeasures to reduce the risk of the project and ensure the success of the project development investment. This paper applies the basic theory of project risk management, taking the construction project of Shouguang Sunshine Hospital's outpatient comprehensive building as the research object, combining the internal and external environment of the project and its own characteristics, using the methods of risk identification, risk analysis and evaluation, etc. Risk identification, estimation and evaluation are carried out for each stage of construction decision, early project and project construction, and corresponding risk response methods are proposed according to the different characteristics of each stage. By combining the analytic hierarchy process of risk assessment with the fuzzy comprehensive evaluation method of risk assessment, the risk assessment of the whole process of the construction project of Shouguang Sunshine Hospital out-patient comprehensive building is carried out. This paper is divided into five parts. The first part introduces the purpose of the research on the risk of construction projects at home and abroad. The second part is the research on risk management of construction project development, starting with the definition of risk, combining the characteristics of construction and development, briefly introduces the methods of risk identification, estimation, evaluation and response. The third part introduces the risk management in each stage of the project development of Shouguang Sunshine Hospital Mengzhen complex Building, and identifies the risks one by one in each stage of the project. Estimate and evaluate and propose corresponding risk response methods according to the different characteristics of each stage. The fourth part is the comprehensive evaluation of the whole process of the development of the outpatient comprehensive building of Shouguang Sunshine Hospital. Through the estimation and evaluation of the risk, the fuzzy comprehensive evaluation method is used to analyze the example. Assess Shouguang Sunshine Hospital outpatient comprehensive building construction of the whole process of risk grade. In the fifth part, according to the risk response method, the author puts forward the risk coping strategies in different stages of the outpatient comprehensive building construction project of Shouguang Sunshine Hospital.
【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2013
【分類號(hào)】:TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 柏春華;原相娟;史峰;;制造業(yè)上市公司財(cái)務(wù)風(fēng)險(xiǎn)評(píng)估指標(biāo)體系設(shè)計(jì)[J];綠色財(cái)會(huì);2011年01期
2 徐文學(xué);楊緒強(qiáng);;AHP在財(cái)務(wù)預(yù)警指標(biāo)權(quán)重設(shè)計(jì)中的應(yīng)用[J];會(huì)計(jì)之友(上旬刊);2010年01期
3 胡紅星;;企業(yè)財(cái)務(wù)風(fēng)險(xiǎn)管理及完善[J];國際商務(wù)財(cái)會(huì);2009年03期
4 于新花;;企業(yè)財(cái)務(wù)風(fēng)險(xiǎn)管理與控制策略[J];會(huì)計(jì)之友(中旬刊);2009年02期
5 張鐵山;趙鑫;吳磊;;我國機(jī)械制造業(yè)上市公司財(cái)務(wù)危機(jī)防范研究[J];會(huì)計(jì)之友(中旬刊);2009年01期
6 潘學(xué)文;王其淼;;現(xiàn)金流對(duì)企業(yè)財(cái)務(wù)風(fēng)險(xiǎn)的影響研究[J];財(cái)會(huì)研究;2009年01期
7 王燕;;企業(yè)內(nèi)部財(cái)務(wù)風(fēng)險(xiǎn)的控制探析[J];金融經(jīng)濟(jì);2008年24期
8 張亮;朱遠(yuǎn)望;;模糊評(píng)估方法在房地產(chǎn)項(xiàng)目財(cái)務(wù)風(fēng)險(xiǎn)評(píng)估中的應(yīng)用[J];現(xiàn)代商業(yè);2008年29期
9 楊華;;關(guān)于企業(yè)財(cái)務(wù)風(fēng)險(xiǎn)管理的探討[J];統(tǒng)計(jì)與決策;2008年19期
10 周巍;;我國房地產(chǎn)項(xiàng)目投資風(fēng)險(xiǎn)及防范研究[J];當(dāng)代經(jīng)濟(jì);2008年04期
,本文編號(hào):2265765
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2265765.html