基于基層政府層面的中越兩國建設(shè)工程質(zhì)量監(jiān)督管理模式對比分析
[Abstract]:After more than 30 years of reform and opening up, the national economy has been greatly developed, and the construction industry has become the pillar industry of the national economy. In this process, China's construction industry has undergone a series of major changes, accumulated a lot of experience, especially in the construction project quality management, has formed a set of suitable for the socialist development model. At the same time, there is a distinct Oriental characteristics, the whole process, multi-dimensional monitoring quality management model. Vietnam's reform and opening up in time series is later than China. As the leading industry in the development of the national economy, the overall development level of the construction industry in Vietnam is lagging behind, the level of engineering quality is relatively low, and quality accidents occur from time to time, directly endangering the lives of the people and the safety of property; at the same time, Also affected the steady development of the national economy, hinder the improvement of regional competitiveness. In view of the fact that China and Vietnam share the same national political system and similar cultural traditions and economic development models, the experience and achievements in quality management of construction projects between the two countries are worthy of study and reference by Vietnam. This paper attempts to study the development status and strategic orientation of quality supervision and management of construction industry in Vietnam through the comparative analysis of the construction quality supervision and management models between China and Vietnam at the implementation level (limited to grass-roots government level). This paper analyzes its current characteristics and existing problems, draws lessons from the experience and achievements of the Chinese grass-roots government in the practice of construction engineering quality supervision and management, and puts forward some suggestions for the reform of Vietnamese grass-roots government's construction project quality supervision and management mode. First of all, the status quo and strategic orientation of quality supervision and management of construction projects between China and Vietnam are analyzed, and the current situation of their respective management institutions, management systems and management mechanisms are elaborated in detail. This paper systematically introduces the mode of supervision and management of construction project quality of Chinese grass-roots government, and deeply analyzes the characteristics and problems existing in the supervision and management of construction project quality in Vietnam. Then, a unified questionnaire is designed to investigate the current situation of the supervision and management of construction quality in the grass-roots government of China and Vietnam. Based on the statistical analysis of survey data, this paper expounds the ways and effects of the mode of supervision and management of construction project quality of the grass-roots governments of China and Vietnam on the quality of construction projects, and compares and analyzes the effects of the modes of supervision and management on the quality of construction projects. This paper reveals the similarities and differences between China and Vietnam in the supervision and management of the construction quality of grass-roots government. Finally, the paper summarizes the achievements and experiences of Chinese grass-roots government in the past construction project quality supervision and management practice, and puts forward the reform measures of Vietnamese grass-roots government construction project quality supervision and management mode. In order to improve the quality of Vietnam construction project supervision and management level.
【學(xué)位授予單位】:華南理工大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU712.3
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 郭漢丁,劉應(yīng)宗;我國建設(shè)工程質(zhì)量政府監(jiān)督制度沿革[J];工程質(zhì)量;2002年04期
2 杜靜華;對建筑工程保險制度強(qiáng)制實行的探討[J];工程質(zhì)量;2005年01期
3 何伯洲,周顯峰,譚大璐;轉(zhuǎn)變工程質(zhì)量監(jiān)督機(jī)構(gòu)工作機(jī)制的研究[J];哈爾濱建筑大學(xué)學(xué)報;2002年03期
4 郭漢丁,劉應(yīng)宗;論建設(shè)工程質(zhì)量政府監(jiān)督機(jī)構(gòu)改革[J];建筑;2002年01期
5 李明,高欣;國外工程保險制度的發(fā)展和基本內(nèi)容研究[J];基建優(yōu)化;2002年05期
6 孟憲海;國際工程保險制度研究借鑒[J];建筑經(jīng)濟(jì);2000年08期
7 劉應(yīng)宗,郭漢丁,孟俊娜;我國政府建設(shè)工程質(zhì)量監(jiān)督工作的轉(zhuǎn)變[J];建筑經(jīng)濟(jì);2002年02期
8 張麗;;問卷設(shè)計中應(yīng)注意的幾個問題[J];科技經(jīng)濟(jì)市場;2011年04期
9 康等銀;;關(guān)于調(diào)查問卷設(shè)計應(yīng)注意幾個問題的研究[J];科技信息;2009年23期
10 張家漢;;建設(shè)工程的全過程質(zhì)量監(jiān)督管理[J];中國建設(shè)信息;2006年13期
相關(guān)博士學(xué)位論文 前1條
1 郭漢丁;建設(shè)工程質(zhì)量政府監(jiān)督管理研究[D];天津大學(xué);2003年
本文編號:2235770
本文鏈接:http://sikaile.net/kejilunwen/sgjslw/2235770.html