A市J供熱站二期擴建工程項目技術(shù)經(jīng)濟評價研究

發(fā)布時間:2018-02-15 04:20

  本文關(guān)鍵詞: 供熱項目 技術(shù)經(jīng)濟評價 財務(wù)分析 出處:《中國海洋大學(xué)》2013年碩士論文 論文類型:學(xué)位論文


【摘要】:A市是一個能源資源缺乏的城市,所需能源靠外部調(diào)入,在可供消費的能源結(jié)構(gòu)中,A市天然氣總量不能滿足冬季需求,水電和核電是空白,供熱仍以煤炭為主。集中供熱是城市的基礎(chǔ)設(shè)施之一,是改善城市環(huán)境,提高大氣質(zhì)量,提高城市現(xiàn)代化水平的重要措施,具有良好的社會效益、環(huán)境效益和經(jīng)濟效益,符合國家節(jié)能減排的政策要求。近年來A市的集中供熱事業(yè)得到了迅速發(fā)展,為滿足日益增長的熱負(fù)荷需要,針對熱源不足的問題,供熱專業(yè)規(guī)劃對現(xiàn)有熱源進(jìn)行了整合,并根據(jù)城市總體規(guī)劃的區(qū)域劃分情況、現(xiàn)狀道路和規(guī)劃道路以及現(xiàn)狀熱源和管網(wǎng)的布置情況,對原供熱分區(qū)進(jìn)行適當(dāng)調(diào)整和細(xì)化。但是,目前A市現(xiàn)有熱源仍無法滿足供熱需求的急劇增長,供熱需求的迅速增長和熱源建設(shè)滯后的矛盾日趨嚴(yán)重。在此背景下,J臨時供熱站進(jìn)行二期擴建工程,新建3臺46MW高溫?zé)崴疇t及附屬設(shè)備,提高供熱面積,解決供暖區(qū)域取暖問題。項目評價是建設(shè)項目前期研究中的重要內(nèi)容和有機組成部分,其結(jié)論是投資決策的重要依據(jù)。項目技術(shù)經(jīng)濟評價主要由三部分組成:資源條件分析、技術(shù)評價與經(jīng)濟評價。資源條件分析主要是對項目建設(shè)所需原料及其它各種資源的分析;技術(shù)評價是在資源條件分析的基礎(chǔ)上針對項目的各項參數(shù)設(shè)置及項目進(jìn)展的技術(shù)條件;經(jīng)濟評價則往往是使用一些定量的經(jīng)濟分析方法,對項目進(jìn)行財務(wù)及風(fēng)險上的量化處理,作為企業(yè)領(lǐng)導(dǎo)決策的重要依據(jù)。本文立足A市J供熱站二期擴建工程項目,運用技術(shù)經(jīng)濟評價的相關(guān)理論,分別從資源條件層面、技術(shù)層面與經(jīng)濟層面對項目進(jìn)行分析,以期構(gòu)建A市J供熱站二期擴建工程項目的技術(shù)經(jīng)濟評價指標(biāo)體系。分析結(jié)果表明該項目資源條件符合建設(shè)要求,技術(shù)分析也通過了考核,最重要的經(jīng)濟分析運用了項目估算以及六種經(jīng)濟評價指標(biāo)進(jìn)行考核,結(jié)果表明該項目盈利能力較好,能夠較快的回收資金。通過對該項目的技術(shù)經(jīng)濟評價,希望能夠?qū)ο嚓P(guān)項目的發(fā)展提供依據(jù)和經(jīng)驗,為項目的后期運行提供技術(shù)以及財務(wù)依據(jù)。
[Abstract]:A is a lack of energy resources in the city, the energy required by external transferred, in the energy structure for consumption in the city of A, the total amount of gas can not meet the demand in winter, hydropower and nuclear power is blank, heating is still dominated by coal. Central heating is one of the city's infrastructure, is to improve the city environment, improve air quality, an important measure to improve the modernization level of the city, with good social benefits, environmental benefits and economic benefits, in line with the national energy saving policy. In recent years, central heating system in the city of A has been developing rapidly, in order to meet the needs of the heat load increasing, aiming at the problem of insufficient heat, heating of existing professional planning the heat source for the integration, and according to the regional division of city planning, road planning and road status and layout situation of heat source and the pipe network of district heating adjustment And refined. However, the current source A city is still unable to meet the rapid growth of the heating demand, the rapid growth of demand contradiction of heating and heat construction becomes more and more serious. In this context, J temporary heating station expansion project two, the new 3 46MW high temperature hot water boiler and ancillary equipment, improve the heating area, to solve the heating the problem of heating area. Project evaluation is an important content of the preliminary study in construction project and organic components, the conclusion is an important basis for investment decisions. Economic and technical evaluation mainly consists of three parts: resource condition analysis, the technical and economic evaluation. Resources condition analysis is mainly raw materials and other resources for construction projects the technical evaluation is the technical conditions; analysis based on the resource conditions in parameter setting and project progress; economic evaluation is often made With some quantitative economic analysis method, to quantify the project financial and risk, as an important basis for enterprise leadership decision-making. Based on the A J two phase expansion project of heating station, using the related theories of technical and economic evaluation, respectively, from the resources level, technical level and economic level of the project were analyzed. Construction of A J heating station project the two phase of the expansion of the technical and economic evaluation index system to analysis. The results show that the resources conditions meet the requirements of the building, through the analysis of technology assessment, the most important economic analysis with the project estimate and six kinds of economic evaluation indicators for assessment, the results show that the profitability of the project better can, the recovery of funds quickly. Through the technical and economic evaluation of the project, hoping to provide the basis for the development and experience of the related projects, for later operation of the project. For technical and financial basis.

【學(xué)位授予單位】:中國海洋大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2013
【分類號】:TU995

【相似文獻(xiàn)】

相關(guān)期刊論文 前10條

1 任峻;王鵬;江向陽;;公共建筑不同節(jié)能改造措施的技術(shù)經(jīng)濟評價[J];建設(shè)科技;2012年10期

2 唐連玨;關(guān)于民用建筑設(shè)計技術(shù)經(jīng)濟評價內(nèi)容的探討[J];建筑經(jīng)濟;1988年03期

3 沈文;;給水工程方案的技術(shù)經(jīng)濟評價[J];青島建筑工程學(xué)院學(xué)報;1991年02期

4 郗偉東;姚玉生;周景宏;石玉月;;基于模糊數(shù)的方案技術(shù)經(jīng)濟評價[J];東北電力大學(xué)學(xué)報;2007年02期

5 殷起鳴,武春友;工業(yè)技術(shù)改造項目的技術(shù)經(jīng)濟評價[J];大連工學(xué)院學(xué)報;1984年03期

6 黃乃勇;;關(guān)于鐵路牽引動力改造方案技術(shù)經(jīng)濟評價的若干問題[J];鐵道科技動態(tài);1985年03期

7 陳生榮;電池新產(chǎn)品開發(fā)技術(shù)經(jīng)濟評價初探[J];電池;1985年06期

8 廖善秋,樊幼民;以木薯渣、黃漿為原料生產(chǎn)酒精技術(shù)經(jīng)濟評價[J];廣西大學(xué)學(xué)報(自然科學(xué)版);1997年03期

9 魏琪;關(guān)于節(jié)能措施的技術(shù)經(jīng)濟評價的探討[J];江西能源;1994年01期

10 葛新;尹笑迪;;北方既有居住建筑節(jié)能改造項目技術(shù)經(jīng)濟評價指標(biāo)體系構(gòu)建[J];經(jīng)營與管理;2014年04期

相關(guān)會議論文 前2條

1 寧冰;;污水廠技術(shù)經(jīng)濟評價及指標(biāo)體系研究[A];全國給水排水技術(shù)信息網(wǎng)41屆技術(shù)交流會論文集[C];2013年

2 沈維春;;600MW火電機組的技術(shù)經(jīng)濟綜合評價研究[A];加入WTO和中國科技與可持續(xù)發(fā)展——挑戰(zhàn)與機遇、責(zé)任和對策(上冊)[C];2002年

相關(guān)重要報紙文章 前1條

1 王建;“龍興”獨資拍得俄大型鋅鉛礦[N];黑龍江經(jīng)濟報;2006年

相關(guān)碩士學(xué)位論文 前10條

1 王一鷗;幾內(nèi)亞M氧化鋁建廠投資方案的技術(shù)經(jīng)濟評價[D];東北大學(xué);2011年

2 王曉英;A市J供熱站二期擴建工程項目技術(shù)經(jīng)濟評價研究[D];中國海洋大學(xué);2013年

3 李德惠;創(chuàng)新基金項目的技術(shù)經(jīng)濟評價體系與實證研究[D];四川大學(xué);2004年

4 尹笑迪;北方既有居住建筑節(jié)能改造項目技術(shù)經(jīng)濟評價研究[D];沈陽工業(yè)大學(xué);2015年

5 鄧爾輝;湖北化肥廠原料替代技改方案技術(shù)經(jīng)濟評價[D];大連理工大學(xué);2002年

6 黃家忠;化工建設(shè)投資項目的技術(shù)經(jīng)濟評價與實證分析[D];四川大學(xué);2003年

7 劉明;湖南瀏陽市譚玲鈷銅多金屬礦技術(shù)經(jīng)濟評價[D];昆明理工大學(xué);2013年

8 周建軍;庫阿高速投資項目可行性分析與技術(shù)經(jīng)濟評價[D];華北電力大學(xué)(河北);2010年

9 王敏杰;以經(jīng)濟哲學(xué)為導(dǎo)向的油氣工業(yè)技術(shù)經(jīng)濟評價——以新場氣田開發(fā)調(diào)整方案為例[D];成都理工大學(xué);2002年

10 常小萍;烏沙山電廠海水淡化項目技術(shù)經(jīng)濟評價[D];華北電力大學(xué)(河北);2009年



本文編號:1512412

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/sgjslw/1512412.html


Copyright(c)文論論文網(wǎng)All Rights Reserved | 網(wǎng)站地圖 |

版權(quán)申明:資料由用戶2db52***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com