EPC項(xiàng)目的BIM應(yīng)用風(fēng)險(xiǎn)管理研究
[Abstract]:According to DBIA's survey of recent years of EPC (Design-Purchasing-Construction) projects, after 2017, The construction general contract management mode will occupy more than 50% in the construction market. The EPC model is becoming the leader of many general contracting modes, and its share is increasing year by year. After CAD (computer aided Design), the second revolution in the construction industry, triggered by BIM (Building Information Model), is in full swing. Especially in the series of documents issued continuously by the Ministry of National Housing and Construction, BIM has been fully emphasized and affirmed. It can be predicted that the introduction of BIM into the EPC project will be the inevitable trend for the general contracting project to realize the information management, but the risk of the BIM application in the construction enterprise is not paid enough attention in the current upsurge of BIM application in the construction enterprise. Especially, the risk of BIM application in EPC project is seldom considered, which will lead to the failure of BIM application and even make EPC project suffer great loss. Combined with the BIM application of EPC project, this paper makes a deep analysis of the risk problems in the application of BIM in EPC project, and mainly studies the following aspects: first, combing the relevant theory of BIM application in EPC project. The BIM application points of EPC project are summarized, and the risk characteristics of BIM application of EPC project are put forward. By comparing the BIM application of general project, different participants are considered as a whole in each stage of EPC project. The dimension model of BIM application risk identification of EPC project is established. Secondly, the key words of this paper are searched in the literature database, and the relevant data are analyzed by combining the practical experience and expert investigation results. Identify the BIM application risk of EPC project, find out the BIM application risk factor index set of EPC project, at the same time do a good job of hierarchical classification, lay the foundation for risk evaluation; third, After comparing and analyzing the current mature and popular risk assessment methods, according to the characteristics of the evaluation object, the fuzzy analytic hierarchy process (FAHP),) is selected to establish the BIM application risk evaluation model of the EPC project, and combined with the actual cases. The applicability of the evaluation model is verified. Fourthly, in order to reduce the loss of BIM application in EPC project and improve the risk management ability and level of the project, this paper puts forward the method and flow of BIM application risk management in EPC project combined with the actual project. The corresponding control method is given for the identified risk factors, and the BIM application risk management system of EPC project is established. Through the study of this paper, it will provide a useful reference for the EPC project to adopt BIM, and avoid or reduce the loss caused by blindly following the wind regardless of the conditions.
【學(xué)位授予單位】:西安科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2017
【分類號】:TU17;TU71
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 劉海龍;趙宇明;;BIM技術(shù)在萬達(dá)交鑰匙工程中的應(yīng)用[J];工程建設(shè)與設(shè)計(jì);2016年10期
2 張輝;祖丕祥;李永福;賀慶;;基于結(jié)構(gòu)方程的BIM技術(shù)應(yīng)用風(fēng)險(xiǎn)評價(jià)研究[J];工程管理學(xué)報(bào);2016年04期
3 巴特;馬玉柱;;BIM技術(shù)在EPC石化碼頭的應(yīng)用研究[J];港工技術(shù);2016年03期
4 俞濤;毛江山;沈伶妮;;嘉善:打造創(chuàng)客聯(lián)盟 推動(dòng)青年創(chuàng)新[J];中國電力企業(yè)管理;2016年10期
5 楊冬梅;董娜;;業(yè)主方BIM應(yīng)用障礙及評價(jià)體系研究[J];工程經(jīng)濟(jì);2016年04期
6 李智;王靜;;施工階段BIM應(yīng)用風(fēng)險(xiǎn)及應(yīng)對策略[J];土木建筑工程信息技術(shù);2016年02期
7 郭力;;工程建設(shè)項(xiàng)目BIM應(yīng)用風(fēng)險(xiǎn)分析與應(yīng)對[J];建筑經(jīng)濟(jì);2015年03期
8 蔡偉慶;;BIM的應(yīng)用、風(fēng)險(xiǎn)和挑戰(zhàn)[J];建筑技術(shù);2015年02期
9 孟昕;;軟件信息化風(fēng)險(xiǎn)管理研究[J];信息技術(shù);2014年12期
10 劉文平;郭紅領(lǐng);任劍波;武電坤;劉兵全;;BIM在EPC公路工程中的應(yīng)用模式研究[J];建筑經(jīng)濟(jì);2014年09期
相關(guān)碩士學(xué)位論文 前10條
1 陳廣袤;信息技術(shù)風(fēng)險(xiǎn)管理研究[D];中國政法大學(xué);2015年
2 高浪;基于BIM技術(shù)的EPC項(xiàng)目成本的動(dòng)態(tài)控制[D];長安大學(xué);2014年
3 李俊超;BIM技術(shù)擴(kuò)散的阻礙研究[D];哈爾濱工業(yè)大學(xué);2014年
4 趙靈敏;基于BIM的建設(shè)工程全壽命周期項(xiàng)目管理研究[D];山東建筑大學(xué);2014年
5 宋建國;建設(shè)工程項(xiàng)目風(fēng)險(xiǎn)管理分析[D];吉林大學(xué);2013年
6 黃波;建設(shè)工程項(xiàng)目風(fēng)險(xiǎn)分析與管理研究[D];南京理工大學(xué);2013年
7 金衛(wèi)東;某BT項(xiàng)目風(fēng)險(xiǎn)的評估與應(yīng)對策略研究[D];華南理工大學(xué);2013年
8 侯麗娜;光伏建筑項(xiàng)目風(fēng)險(xiǎn)管理研究[D];華北電力大學(xué);2012年
9 潘麗萍;工程項(xiàng)目風(fēng)險(xiǎn)管理應(yīng)用研究[D];西安建筑科技大學(xué);2009年
10 涂國華;基于模糊層次分析法的3G項(xiàng)目風(fēng)險(xiǎn)管理研究[D];上海交通大學(xué);2009年
,本文編號:2154930
本文鏈接:http://sikaile.net/kejilunwen/ruanjiangongchenglunwen/2154930.html