鐵路零小工程招投標(biāo)系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)
本文選題:鐵路零小工程 + 信息安全性和公開性; 參考:《西南交通大學(xué)》2017年碩士論文
【摘要】:迄今為止,用紙質(zhì)文件傳輸?shù)霓k公方式是中國最傳統(tǒng)的方式。隨著科學(xué)技術(shù)的發(fā)展,各種辦公系統(tǒng)對信息傳輸?shù)囊笤絹碓礁?對系統(tǒng)安全性的需求也在不斷的提升。紙質(zhì)辦公的傳統(tǒng)方式再不能滿足辦公電子化的需求。當(dāng)今的網(wǎng)絡(luò)與信息科學(xué)技術(shù)發(fā)展如此迅速,出現(xiàn)了電子公文時(shí)代。它具有快速的傳輸速度,保存的類別化,搜索的便捷化,使用的安全化等特點(diǎn)。基于辦公人員的需求,本文設(shè)計(jì)了鐵路零小工程招投標(biāo)系統(tǒng),每個(gè)功能模塊分別從功能需求,系統(tǒng)設(shè)計(jì)以及系統(tǒng)實(shí)現(xiàn)三個(gè)方面實(shí)現(xiàn)。該系統(tǒng)主要的功能分為以下七個(gè)部分:1.項(xiàng)目審核:是工作流轉(zhuǎn)的核心部分。通過發(fā)送新建項(xiàng)目,實(shí)現(xiàn)一個(gè)項(xiàng)目的建立。2.招標(biāo)發(fā)布:從局域網(wǎng)絡(luò)的項(xiàng)目審核擴(kuò)展到互聯(lián)網(wǎng)端的信息同步,展示到鐵路官方網(wǎng)站。3.投標(biāo)管理:通過登錄鐵路官網(wǎng)進(jìn)行項(xiàng)目的瀏覽、查閱并對符合資質(zhì)的項(xiàng)目進(jìn)行參選報(bào)名,實(shí)現(xiàn)投標(biāo)比選。4.投標(biāo)比選:通過比選委員會(huì)的開展,項(xiàng)目發(fā)起人進(jìn)行會(huì)議記錄,上傳會(huì)議文件以及記錄比選委員會(huì)的參選人員,并分別發(fā)布會(huì)后擬比選前三名以及擬最終中標(biāo)結(jié)果。領(lǐng)導(dǎo)對擬前三名和擬中標(biāo)結(jié)果分別進(jìn)行審核。審核通過的同時(shí),比選信息同步至互聯(lián)網(wǎng)端。5.結(jié)果公示:分別將領(lǐng)導(dǎo)審核通過的比選前三名的結(jié)果以及最終中標(biāo)結(jié)果公布到互聯(lián)網(wǎng)端,實(shí)現(xiàn)信息的公平公正性。6.項(xiàng)目評(píng)價(jià):項(xiàng)目發(fā)起人對項(xiàng)目進(jìn)行整體的評(píng)價(jià),便于后續(xù)改進(jìn)。7.統(tǒng)計(jì)分析:對各單位及各項(xiàng)目進(jìn)程進(jìn)行分類統(tǒng)計(jì),便于分析數(shù)據(jù)。鐵路零小工程招投標(biāo)系統(tǒng)主要應(yīng)用于鐵路方面。該系統(tǒng)成為零小工程的原因是通過該系統(tǒng)的項(xiàng)目均為價(jià)格在20萬以下,若價(jià)格高于20萬則會(huì)進(jìn)入其他系統(tǒng)中。招投標(biāo)指在該系統(tǒng)中除了招標(biāo)和投標(biāo)環(huán)節(jié)以外還有基于工作流轉(zhuǎn)過程的自動(dòng)化辦公等許多功能模塊,使該系統(tǒng)豐富、完善。鐵路系統(tǒng)體制的相對落后和保守,是該系統(tǒng)投入開發(fā)和使用的真正意義所在。對于鐵路系統(tǒng)而言,要在確保安全性、私密性地同時(shí)保證信息的公開公正性,這無疑是一個(gè)大的挑戰(zhàn)和亮點(diǎn)所在,而這點(diǎn)在該系統(tǒng)中有較好的體現(xiàn)。該系統(tǒng)所使用的編程工具有VS2015、Eclipse,該系統(tǒng)分為Intranet內(nèi)部網(wǎng)絡(luò)和互聯(lián)網(wǎng)網(wǎng)絡(luò)兩個(gè)部分。工作流轉(zhuǎn)過程控制技術(shù)針對擬稿人即項(xiàng)目發(fā)起人擬定的系統(tǒng)操作包括:新建、審批、移送、發(fā)布、參選、比選、公示、評(píng)價(jià)等。該系統(tǒng)統(tǒng)一配置在蜂窩網(wǎng)認(rèn)證平臺(tái)下,加固系統(tǒng)的安全性。
[Abstract]:So far, the paper file transmission is the most traditional way in China. With the development of science and technology, all kinds of office systems require more and more information transmission. The traditional way of paper office can no longer meet the demand of electronic office. With the rapid development of network and information science and technology, the era of electronic official documents has emerged. It has the characteristics of fast transmission speed, saving categorization, convenient search, safe use, etc. Based on the demand of office staff, this paper designs a small project bidding system for railway zero project. Each function module is realized from three aspects: function requirement, system design and system implementation. The main functions of the system are divided into the following seven parts: 1. Project audit: is the core part of work flow. By sending a new project to achieve the establishment of a project. 2. Tender announcement: from local area network project audit to Internet side information synchronization, display to railway official website. 3. Bidding management: through logging into the railway official website for project browsing, consulting and registration of qualified projects, bid comparison. 4. Bidding comparison: through the development of the election committee, the project sponsor carries on the meeting minutes, uploads the meeting documents and records the candidate who is elected by the election committee, and proposes to compare the top three and the final result of the bid after the press conference respectively. The leader will examine and verify the top three positions and the results of the bid respectively. At the same time, check the information synchronization to the Internet. 5. Results: the results of the leaders' examination and approval of the top three of the election and the final results of the bid were published to the Internet to achieve fair and equitable information. 6. Project evaluation: the project sponsors evaluate the project as a whole, so as to facilitate further improvement. 7. Statistical analysis: each unit and each item process carries on the classification statistics, facilitates the analysis data. Railway zero-scale project bidding system is mainly used in railway. The reason that the system becomes zero engineering is that the items through the system are all priced below 200000, and if the price is higher than 200000, it will enter other systems. Tendering and bidding refers to the system in addition to bidding and bidding links there are also based on the work flow process of automation office and many other functional modules to make the system rich and perfect. The relative backwardness and conservatism of the railway system is the real meaning of the development and use of the system. For railway system, it is undoubtedly a big challenge and bright spot to ensure the security and privacy of the information at the same time, which is well reflected in the system. The programming tool used in this system is VS2015 Eclipse, which is divided into two parts: Intranet internal network and Internet network. The control technology of work flow process includes: new construction, examination and approval, transfer, release, election, publicity, evaluation and so on. The system is uniformly configured on the cellular network authentication platform to strengthen the security of the system.
【學(xué)位授予單位】:西南交通大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TP311.52
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 白蕾;郭清菊;;HTML5與CSS3的設(shè)計(jì)模式[J];智能計(jì)算機(jī)與應(yīng)用;2016年02期
2 范兆忠;張海攀;魏躍堂;;HTML 5與CSS 3在網(wǎng)頁中的應(yīng)用[J];無線互聯(lián)科技;2015年15期
3 唐永瑞;張達(dá)敏;;基于Ajax與MVC模式的信息系統(tǒng)的研究與設(shè)計(jì)[J];電子技術(shù)應(yīng)用;2014年02期
4 熊文;熊淑華;孫旭;張朝陽;;Ajax技術(shù)在Web2.0網(wǎng)站設(shè)計(jì)中的應(yīng)用研究[J];計(jì)算機(jī)技術(shù)與發(fā)展;2012年03期
5 張俐;張維璽;;改進(jìn)的JDBC框架在數(shù)據(jù)持久層的應(yīng)用[J];計(jì)算機(jī)工程與設(shè)計(jì);2010年08期
6 李容;;基于MVC模式的Web應(yīng)用研究[J];軟件導(dǎo)刊;2010年01期
7 丁群福;董江軍;;管理信息系統(tǒng)在國內(nèi)外中小企業(yè)應(yīng)用現(xiàn)狀及存在問題研究[J];化學(xué)工程與裝備;2008年04期
8 肖開鋒;;淺析企業(yè)信息系統(tǒng)的發(fā)展趨勢[J];中國管理信息化;2008年08期
9 柳新華;董相志;邵明媚;張艷偉;;電子公文發(fā)展面臨的問題與對策[J];中國行政管理;2007年11期
10 于古勝;李華敏;胡成全;;基于B/S模式的電力安全性評(píng)價(jià)系統(tǒng)的設(shè)計(jì)與實(shí)現(xiàn)[J];電訊技術(shù);2007年04期
相關(guān)碩士學(xué)位論文 前3條
1 喬淑夷;基于MVC模式的Web前端框架關(guān)鍵技術(shù)研究與實(shí)現(xiàn)[D];中國海洋大學(xué);2014年
2 王新;基于MVC模式的通用Web軟件系統(tǒng)開發(fā)框架設(shè)計(jì)與實(shí)現(xiàn)[D];電子科技大學(xué);2007年
3 趙國輝;權(quán)限管理組件在Spring框架下的設(shè)計(jì)與實(shí)現(xiàn)[D];蘇州大學(xué);2005年
,本文編號(hào):1896867
本文鏈接:http://sikaile.net/kejilunwen/ruanjiangongchenglunwen/1896867.html