平頂山十二礦“采-選-充”一體化集成關(guān)鍵技術(shù)研究
[Abstract]:Adopting the traditional all collapse method to manage the roof, after large-scale mining, all kinds of ecological and environmental problems, including surface subsidence, gangue discharge and so on, are becoming more and more prominent. In addition, with the large-scale mining of coal resources, More and more mines are involved in coal mining under buildings, railways and water bodies. In recent years, the comprehensive mechanized solid filling mining technology developed by China University of Mining and Technology has successfully solved the above problems and achieved good economic and social benefits. But the gangue still needs to be transported from feeding well to filling face after washing. In view of this, this paper puts forward the integrated production mode of coal mine, mining, charging and mining. In this paper, theoretical analysis, numerical simulation, industrial experiment and other research methods are used to explain the technical connotation of coal mine mining, charging and mining integration. The system layout and process design of the integrated production technology of mining, charging and mining are studied, and the selection and design principles of the key technology and equipment, the structure and performance of the equipment are analyzed. The main research results are as follows: (1) it reveals the technical connotation of the integration of mining, charging and mining in coal mines, forms a perfect integrated system of mining, charging and mining in coal mines, and establishes the integrated production mode of underground mining, separation, charge and production. It provides the basis for the implementation and development of the integrated technology of underground mining, separation and production. (2) the production capacity of the underground coal mining system, the separation system and the filling system are established, and the key factors affecting the capability of the three systems are analyzed. The key technical parameters are obtained by optimization. (3) from the simulation results, the stress distribution of surrounding rock can be significantly changed by supporting structure. In the supporting structure, the stress concentration range of surrounding rock is smaller, the displacement distribution is slightly changed, is 160 mm, and the distance of roadway movement is close to 81 mm. The simulation results show that, The stability of surrounding rock in the chamber can be improved greatly to ensure the quality of roadway. (4) the problem of environmental pollution caused by the ground discharge of coal gangue is solved, and the effective separation of coal and gangue and the conveying channel of gangue are realized. When filling space and filling equipment are connected with fully mechanized coal face, coal flow gangue is filled in goaf directly through downhole washing system to solve the problem of environmental pollution and destruction caused by surface discharge of gangue. It alleviates the pressure of auxiliary transportation, saves the cost of auxiliary transportation and realizes the orderly, efficient and safe production of the integrated production system of underground mining, selection, charging and mining.
【學(xué)位授予單位】:中國(guó)礦業(yè)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2017
【分類號(hào)】:TD823;TD94
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 Li Li;Michel Aubertin;;An improved method to assess the required strength of cemented backfill in underground stopes with an open face[J];International Journal of Mining Science and Technology;2014年04期
2 賀民強(qiáng);程國(guó)鋒;劉家寶;;重介淺槽分選機(jī)的原理及應(yīng)用分析[J];能源與節(jié)能;2014年06期
3 謝文清;;臺(tái)階梯段爆破技術(shù)在大型硐室開挖中的應(yīng)用[J];路基工程;2014年03期
4 張吉雄;李猛;鄧雪杰;李劍;;含水層下矸石充填提高開采上限方法與應(yīng)用[J];采礦與安全工程學(xué)報(bào);2014年02期
5 劉春生;張萍;;動(dòng)篩跳汰機(jī)排矸與重介淺槽排矸工藝對(duì)比[J];科技創(chuàng)業(yè)家;2014年05期
6 張萍;陳士桐;;煤矸重介淺槽分選技術(shù)研究應(yīng)用[J];科技風(fēng);2013年24期
7 李艷紅;季曉明;秦國(guó)富;;XZQ-1620淺槽重介分選機(jī)在華豐礦選煤廠的應(yīng)用[J];選煤技術(shù);2013年05期
8 彭寶萍;樊曉敏;;XZQ1636重介質(zhì)淺槽分選機(jī)在西曲礦選煤廠的應(yīng)用[J];煤炭加工與綜合利用;2013年05期
9 Li Li;;A new concept of backfll design—Application of wick drains in backflled stopes[J];International Journal of Mining Science and Technology;2013年05期
10 周楠;張吉雄;繆協(xié)興;張強(qiáng);;預(yù)掘兩巷前進(jìn)式固體充填采煤技術(shù)研究[J];采礦與安全工程學(xué)報(bào);2013年05期