多層破碎金礦上向水平分層充填法開(kāi)采應(yīng)用研究
[Abstract]:In Dadiangou gold mine, the multi-layer broken vein is mined by mining technique, and the upward horizontal stratified whole tailings cemented filling method is adopted to completely solve the problems of stope loss dilution, large mining cut and poor safety conditions in the mining of ore retention method. Good technical and economic indexes and economic benefits have been obtained in the field industrial test. The loss rate is controlled below 5%, the dilution rate is controlled below 8%, the amount of mining and cutting works is reduced by 35%, the annual output value is increased by 35.59 million yuan, and the annual net profit is 26.69 million yuan. It can be used for reference for similar broken ore bodies.
【作者單位】: 長(zhǎng)沙礦山研究院有限責(zé)任公司;甘肅中金黃金礦業(yè)有限責(zé)任公司;
【分類號(hào)】:TD863
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 ;某礦水平分層充填法的改進(jìn)[J];有色礦山;1973年05期
2 David G.Rasmussen;盧德春;;關(guān)于提高機(jī)械化水平分層充填法生產(chǎn)能力的探討[J];有色礦山;1983年10期
3 陳海遠(yuǎn);馬繼業(yè);;點(diǎn)柱式上向水平分層充填法在馬莊鐵礦的應(yīng)用[J];有色金屬(礦山部分);2012年04期
4 張兆輝;張友剛;萬(wàn)兵;王鵬;;無(wú)礦柱上向水平分層充填法在石湖金礦的應(yīng)用[J];礦業(yè)研究與開(kāi)發(fā);2013年05期
5 朱先艷;楊慶雨;李興平;;淺眼留礦與向上水平分層充填法聯(lián)合開(kāi)采試驗(yàn)與應(yīng)用[J];金屬礦山;2009年S1期
6 劉慶宏;;上向水平分層充填法的安全問(wèn)題探討[J];現(xiàn)代礦業(yè);2010年06期
7 M.L.Jeremic;謝龍水;;南斯拉夫博爾銅礦橫向水平分層充填法開(kāi)采的巖層動(dòng)態(tài)[J];國(guó)外金屬礦采礦;1980年05期
8 周旭;陽(yáng)雨平;王貽明;任建平;;上向水平分層充填法的優(yōu)化研究[J];礦業(yè)快報(bào);2008年08期
9 О.Б.伊萬(wàn)諾夫;楊培章;;上向水平分層充填法回采效率的提高[J];國(guó)外金屬礦采礦;1985年03期
10 郭雄;喬偉;羅騁;;盤(pán)區(qū)上向水平分層充填法在謙比西銅礦的應(yīng)用[J];采礦技術(shù);2011年02期
相關(guān)會(huì)議論文 前1條
1 朱先艷;楊慶雨;李興平;;淺眼留礦與向上水平分層充填法聯(lián)合開(kāi)采試驗(yàn)與應(yīng)用[A];第八屆全國(guó)采礦學(xué)術(shù)會(huì)議論文集[C];2009年
,本文編號(hào):2239232
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2239232.html