礦井突水路徑搜索及突水范圍預(yù)測(cè)方法研究
[Abstract]:The occurrence of mine water inrush seriously threatens the safety of mine production and staff. In this paper, the water inrush path and water inrush range in mine water inrush accident are studied. Firstly, the water level and water inrush range that water inrush flow spreads at different time is studied. The second is to forecast and analyze the spreading trend of water inrush flow in the future to provide technical support for the analysis and treatment of water inrush accidents and the decision of flood prevention and treatment. Based on graph theory and network theory, an undirected graph width priority path search algorithm is proposed for the first time. Based on the analysis of the factors and laws of water inrush in mines, the elevation of roadway intersection is set as search weight on the basis of graph theory, and the flow direction is divided into two water inrush stages: downward spreading and upward rising and rising. An undirected graph width first path search algorithm is formed. Based on the above considerations, the concept and method of flow network diagram are proposed. The information database of mine water network map is established, four typical water inrush roadway models are given, and the water capacity calculation method corresponding to the roadway type is put forward, and the information base model of mine water network diagram is established. The relation between mine water capacity and water level is established. Two kinds of water inrush calculation are carried out through examples. First, through the known water inrush point and the tunnel water level at a certain time, combined with the water inrush path search method, the mine water inrush water quantity at that time is calculated, and the water level change at two times is obtained. The water inrush area and water level elevation point in the future time period are predicted according to the water inrush point and the given or calculated water inrush point combined with the given topological structure information of mine roadway. The undirected graph width first path search algorithm of mine water inrush path is applied and verified in an example mine. The calculation results show that the algorithm can accurately search and generate the water flow path of water inrush, calculate the amount of water inrush and give the range of water inrush under the condition of known mine water inrush point and mine basic data information. With the method of water level sensor, the amount and range of water inrush in the next time period are predicted.
【學(xué)位授予單位】:遼寧工程技術(shù)大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD745
【參考文獻(xiàn)】
相關(guān)期刊論文 前10條
1 馬恒;林露露;劉尹霞;;礦井突水路徑搜索算法及突水范圍預(yù)測(cè)[J];遼寧工程技術(shù)大學(xué)學(xué)報(bào)(自然科學(xué)版);2014年09期
2 武強(qiáng);崔芳鵬;趙蘇啟;劉守強(qiáng);曾一凡;谷亞威;;礦井水害類型劃分及主要特征分析[J];煤炭學(xué)報(bào);2013年04期
3 李常文;柳崢;郭好新;法立滕;;基于采動(dòng)和承壓水作用下斷層突水關(guān)鍵路徑的力學(xué)分析[J];煤炭工程;2011年05期
4 ;Comprehensive evaluation of water-inrush risk from coal floors[J];Mining Science and Technology;2010年01期
5 李連崇;唐春安;梁正召;馬天輝;張永彬;;含斷層煤層底板突水通道形成過(guò)程的仿真分析[J];巖石力學(xué)與工程學(xué)報(bào);2009年02期
6 張立新;李長(zhǎng)洪;趙宇;;礦井突水預(yù)測(cè)研究現(xiàn)狀及發(fā)展趨勢(shì)[J];中國(guó)礦業(yè);2009年01期
7 閆志剛;杜培軍;郭達(dá)志;;礦井涌水水源分析的支持向量機(jī)模型[J];煤炭學(xué)報(bào);2007年08期
8 孫亞軍;楊國(guó)勇;鄭琳;;基于GIS的礦井突水水源判別系統(tǒng)研究[J];煤田地質(zhì)與勘探;2007年02期
9 陳紅,譚慧,祁慧;中國(guó)煤礦重大水害事故規(guī)律分析[J];中國(guó)礦業(yè);2005年08期
10 張少春,張西民;采煤工作面底板突水判據(jù)的建立及應(yīng)用[J];陜西煤炭;2004年02期
,本文編號(hào):2229295
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2229295.html