大孤山鐵礦不耦合裝藥預(yù)裂爆破生產(chǎn)試驗研究
[Abstract]:In the open-pit mining, which accounts for 80% of the mining capacity of metallurgical mines in China, step perforation blasting is the main link in the production process, which plays an important role in improving the utilization ratio of resources and reducing the cost. With a large number of blasting production, a series of unneglectable effects are coming, and the most important thing is the danger caused by blasting vibration, that is, engineering safety problems and civil disputes caused by blasting vibration. In addition, mine blasting has great damage to rock mass, resulting in further breakage of rock mass and decrease of strength, which brings difficulties and huge economic losses to slope maintenance in the later stage. So it is urgent to improve the blasting technology to reduce the production cost. Based on the engineering background of "study on the technique of controlled blasting of high efficiency side by side" in Angang Mining Group Corporation, based on the theoretical research, the blasting process of the uncoupled coefficient of K _ (1) / K _ (1.67) K _ (1.67) K _ (2.27) K ~ (3) ~ (3) ~ (3) ~ (3) K _ (4. 17) is simulated numerically under the finite element software ANSYS. The corresponding stress cloud diagram and the stress response values of the selected five points are obtained. The tensile stress at the middle point of the adjacent hole line is analyzed emphatically, the uncoupling coefficient K is regressed with the tensile stress at the middle point of the line of the two adjacent holes, and the specific rock physical and mechanical parameters of the gneiss endemic to Dagushan are compared. It is concluded that the stress response value is ideal when the uncoupling coefficient is 2.27. Combined with the numerical simulation, two kinds of uncoupled charge columns were used to carry out the production test in the mine field. After the test, the actual forming effect and size of the pre-crack, the half-wall porosity and the planeness of the reserved wall were photographed and counted. By comparing and analyzing the pre-splitting effect of the pre-splitting blasting with the original centralized charge at the bottom of the mine under the similar conditions, it is concluded that the ideal pre-splitting effect can be obtained by using the uncoupled charge column. The effect of using uncoupled charge column with shaped energy is more obvious. At the same time, the wave data collected by the TC-4850 blasting vibration detector are analyzed to compare the amplitude, frequency and vibration delay, and at the same time to compare the vibration velocity and the vibration delay after the three-vector synthesis, the uncoupled charge pre-splitting blasting is obviously superior in every parameter. The results show that the effect of vibration isolation and earthquake reduction is obvious, and the effect of using uncoupled charge column with shaped energy is more obvious.
【學(xué)位授予單位】:遼寧科技大學(xué)
【學(xué)位級別】:碩士
【學(xué)位授予年份】:2015
【分類號】:TD235
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 陳超,甘德清,張立國,于亞倫;預(yù)裂爆破效果的模糊綜合評價研究[J];金屬礦山;2004年11期
2 王成平;閆宇振;朱記偉;;龍首水電站預(yù)裂爆破試驗研究[J];西部探礦工程;2007年12期
3 周南龍;;預(yù)裂爆破試驗方案簡述[J];化學(xué)工程與裝備;2010年05期
4 唐海;李海波;周青春;夏祥;劉博;李俊如;;預(yù)裂爆破震動效應(yīng)試驗研究[J];巖石力學(xué)與工程學(xué)報;2010年11期
5 齊亞松;;預(yù)裂爆破在馬蘭莊鐵礦的應(yīng)用[J];現(xiàn)代礦業(yè);2012年11期
6 吳利仁;;靠幫邊坡預(yù)裂爆破試驗[J];現(xiàn)代礦業(yè);2013年08期
7 盧開榮;吳志誠;;預(yù)裂爆破在我礦的應(yīng)用[J];金屬礦山;1979年06期
8 王書宣;王坤儒;;地下工程的預(yù)裂爆破[J];金屬礦山;1980年04期
9 ;冶金部召開預(yù)裂爆破技術(shù)鑒定會[J];金屬礦山;1980年02期
10 付策;李開行;;預(yù)裂爆破在我礦的應(yīng)用[J];金堆科技;1982年01期
相關(guān)會議論文 前10條
1 吳亮;盧文波;;預(yù)裂爆破作用下巖石裂紋動態(tài)應(yīng)力強(qiáng)度因子分析[A];第一屆中國水利水電巖土力學(xué)與工程學(xué)術(shù)討論會論文集(上冊)[C];2006年
2 盧德生;唐瞻作;;水平預(yù)裂爆破技術(shù)在樂灘水電站工程中的應(yīng)用[A];第三屆廣西青年學(xué)術(shù)年會論文集(自然科學(xué)篇)[C];2004年
3 王中黔;王興發(fā);馮珊芬;;預(yù)裂爆破的斷裂原理[A];光面預(yù)裂爆破論文匯編[C];2007年
4 王興發(fā);王中黔;;斷裂原理在預(yù)裂爆破工程中的應(yīng)用[A];光面預(yù)裂爆破論文匯編[C];2007年
5 高毓山;胡志強(qiáng);;南芬露天礦預(yù)裂爆破的測震與分析[A];第四屆中國金屬學(xué)會青年學(xué)術(shù)年會論文集[C];2008年
6 羅華平;;預(yù)裂爆破在攀鋼白云石采場中的應(yīng)用[A];中國爆破新技術(shù)Ⅱ[C];2008年
7 劉康生;;露天邊坡預(yù)裂爆破實驗研究[A];2009(重慶)中西部第二屆有色金屬工業(yè)發(fā)展論壇論文集[C];2009年
8 石懷理;岳英;王洪訓(xùn);吳樹寶;;用巖體波速確定預(yù)裂爆破線裝藥密度的探討[A];第四屆全國巖石動力學(xué)學(xué)術(shù)會議論文選集[C];1994年
9 盧文川;;南芬露天鐵礦臺階預(yù)裂爆破的研究與應(yīng)用[A];第五屆全國礦山采選技術(shù)進(jìn)展報告會論文集[C];2006年
10 高毓山;胡志強(qiáng);;南芬露天礦預(yù)裂爆破的測振與分析[A];中國爆破新技術(shù)Ⅱ[C];2008年
相關(guān)重要報紙文章 前5條
1 明璜;重煤集團(tuán)深孔預(yù)裂爆破抽放瓦斯[N];中國煤炭報;2006年
2 王澤軍;高難度的挑戰(zhàn)[N];中國黃金報;2012年
3 王素范 郎宏罡;淺談預(yù)裂爆破在西二線工程中成功應(yīng)用[N];石油管道報;2009年
4 左俊 梅永;馬鋼南山礦高村采場首次進(jìn)行預(yù)裂爆破[N];中國礦業(yè)報;2010年
5 楊慎勤;高科技布控左岸壩基開挖[N];中國水利報;2001年
相關(guān)博士學(xué)位論文 前3條
1 葛克水;預(yù)裂爆破參數(shù)的研究[D];中國地質(zhì)大學(xué)(北京);2009年
2 朱帥虎;低透氣性煤層粉乳炸藥預(yù)裂爆破增透實驗及工藝研究[D];中國礦業(yè)大學(xué)(北京);2014年
3 王志亮;煤層深孔預(yù)裂爆破裂隙擴(kuò)展機(jī)理與應(yīng)用研究[D];中國礦業(yè)大學(xué)(北京);2010年
相關(guān)碩士學(xué)位論文 前10條
1 王晉;寬孔距預(yù)裂爆破在三板溪水電站建設(shè)中的試驗研究[D];昆明理工大學(xué);2006年
2 閆大洋;露天礦臺階預(yù)裂爆破參數(shù)優(yōu)化的研究與應(yīng)用[D];安徽理工大學(xué);2014年
3 趙泉;小灣水電站開挖中預(yù)裂爆破參數(shù)的優(yōu)化研究[D];武漢理工大學(xué);2006年
4 鄺四華;堅硬煤層綜放預(yù)裂爆破施工安全評價研究[D];西安科技大學(xué);2010年
5 陳超;含水炮孔邊坡預(yù)裂爆破應(yīng)用研究[D];河北理工學(xué)院;2001年
6 唐海;巖石預(yù)裂爆破成縫分析及爆破參數(shù)確定的智能研究[D];武漢理工大學(xué);2004年
7 潘泱波;深孔預(yù)裂爆破弱化煤層夾矸試驗研究[D];安徽理工大學(xué);2014年
8 趙寧;顧橋礦1123(1)工作面深孔預(yù)裂爆破控制放頂與瓦斯治理技術(shù)[D];安徽理工大學(xué);2014年
9 李廬陽;深孔預(yù)裂爆破增透技術(shù)在正行礦煤巷掘進(jìn)中的應(yīng)用研究[D];安徽理工大學(xué);2015年
10 陳磊;深孔預(yù)裂爆破煤層增透相似模擬實驗研究[D];安徽理工大學(xué);2014年
,本文編號:2225249
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2225249.html