義煤綜能公司煤制氣項目進度控制和質(zhì)量管理
發(fā)布時間:2018-07-21 19:40
【摘要】:近些年來煤化工行業(yè)發(fā)展迅速,有煤炭資源的地方都在規(guī)劃以煤炭作為原料進行建設(shè)項目。義煤綜能公司煤制氣項目系統(tǒng)復(fù)雜,投資額巨大,在進度、質(zhì)量、安全、成本等各方面的控制難度都非常大。并且,在項目建設(shè)過程中,涉及到設(shè)計單位、原材料和設(shè)備的供貨商、施工承包商、分包商和監(jiān)理單位等眾多隊伍的參與。必須利用有效且科學的項目進度控制和質(zhì)量管理方法,才能對項目進行有效控制和管理。 本文以義煤綜能公司煤制氣項目為研究對象,對義煤綜能公司煤制氣項目的建設(shè)背景進行了分析,提出了義煤綜能公司煤制氣項目在建設(shè)過程中存在的問題,并在項目建設(shè)中引入項目管理的重要性。在深入分析項目管理理論體系的過程中,把項目進度控制的理論應(yīng)用到義煤綜能公司煤制氣項目的建設(shè)之中。研究了義煤綜能公司煤制氣項目建設(shè)進度控制中的項目進度計劃,并對項目進度的檢測和調(diào)整進行了具體的分析。在項目質(zhì)量管理方面,建立了該項目的質(zhì)量管理職責,分析了義煤綜能公司煤制氣項目在設(shè)計、采購和施工方面的質(zhì)量管理內(nèi)容,以及義煤綜能公司煤制氣項目質(zhì)量管理記錄和檢測的方法。
[Abstract]:In recent years, coal chemical industry has developed rapidly, where coal resources are in the planning of coal as raw materials for construction projects. The system of coal production project is complex, the investment is huge, and it is very difficult to control the progress, quality, safety, cost and so on. In the process of project construction, it involves the participation of design units, suppliers of raw materials and equipment, construction contractors, subcontractors and supervision units. The effective and scientific method of project schedule control and quality management must be used in order to control and manage the project effectively. In this paper, the construction background of the coal gas production project of Yiwei Coal Comprehensive Energy Company is analyzed, and the problems existing in the construction process of the project are put forward. And introduce the importance of project management in the project construction. In the process of deeply analyzing the theory system of project management, the theory of project schedule control is applied to the construction of coal gasification project in Yiwei Coal Comprehensive Energy Company. This paper studies the progress plan of the construction progress control of the coal gas production project in Yiwei Coal Comprehensive Energy Company, and makes a concrete analysis on the detection and adjustment of the project progress. In terms of project quality management, the quality management responsibility of the project is established, and the content of quality management in the design, purchase and construction of the coal production project of Yiwei Coal Comprehensive Energy Company is analyzed. And the quality management record and test method of coal production project in Yiwei Coal Comprehensive Energy Company.
【學位授予單位】:華東理工大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TQ54;F273.2;F426.21
本文編號:2136649
[Abstract]:In recent years, coal chemical industry has developed rapidly, where coal resources are in the planning of coal as raw materials for construction projects. The system of coal production project is complex, the investment is huge, and it is very difficult to control the progress, quality, safety, cost and so on. In the process of project construction, it involves the participation of design units, suppliers of raw materials and equipment, construction contractors, subcontractors and supervision units. The effective and scientific method of project schedule control and quality management must be used in order to control and manage the project effectively. In this paper, the construction background of the coal gas production project of Yiwei Coal Comprehensive Energy Company is analyzed, and the problems existing in the construction process of the project are put forward. And introduce the importance of project management in the project construction. In the process of deeply analyzing the theory system of project management, the theory of project schedule control is applied to the construction of coal gasification project in Yiwei Coal Comprehensive Energy Company. This paper studies the progress plan of the construction progress control of the coal gas production project in Yiwei Coal Comprehensive Energy Company, and makes a concrete analysis on the detection and adjustment of the project progress. In terms of project quality management, the quality management responsibility of the project is established, and the content of quality management in the design, purchase and construction of the coal production project of Yiwei Coal Comprehensive Energy Company is analyzed. And the quality management record and test method of coal production project in Yiwei Coal Comprehensive Energy Company.
【學位授予單位】:華東理工大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TQ54;F273.2;F426.21
【參考文獻】
相關(guān)期刊論文 前9條
1 李海潤;;煤化工設(shè)備質(zhì)量管理及進度控制[J];化工管理;2013年02期
2 陳曉惠;;論大型項目的進度控制[J];化學工程與裝備;2014年01期
3 李菁宇;李艷杰;;石化項目建設(shè)中設(shè)計進度控制的探討[J];管理觀察;2014年01期
4 雷少陽;王志會;;淺談工程質(zhì)量管理審計的幾個環(huán)節(jié)[J];工業(yè)審計與會計;2013年03期
5 沈勇;;化工工程項目施工進度綜合管理措施淺析[J];科技與企業(yè);2013年09期
6 曹文思;;工程項目進度控制管理方法[J];江西建材;2014年07期
7 王萬榮;陳兵;李霄;;石化擴改項目施工進度控制與質(zhì)量管理[J];石油工業(yè)技術(shù)監(jiān)督;2009年04期
8 孫憲來;;淺談如何加強生產(chǎn)過程的質(zhì)量管理[J];石油工業(yè)技術(shù)監(jiān)督;2014年06期
9 吳瑜;亢萬忠;;粉煤氣化項目工期和質(zhì)量風險管理[J];大氮肥;2008年05期
,本文編號:2136649
本文鏈接:http://sikaile.net/kejilunwen/kuangye/2136649.html
最近更新
教材專著