礦用隔爆型變頻一體機(jī)水冷結(jié)構(gòu)設(shè)計(jì)及散熱研究
本文選題:隔爆型變頻一體機(jī) 切入點(diǎn):煤礦 出處:《山東大學(xué)》2015年碩士論文
【摘要】:礦井下環(huán)境不僅潮濕,而且空氣中充滿瓦斯、粉塵等可燃易爆的混合氣體,普通結(jié)構(gòu)的產(chǎn)品是無法應(yīng)用的;只有把通用的電子元器件放置在一個(gè)符合防爆標(biāo)準(zhǔn)的特殊箱體中,才能允許和確保設(shè)備正常運(yùn)作。而隨著國民經(jīng)濟(jì)的快速發(fā)展,隨著國內(nèi)外節(jié)能技術(shù)的大力推廣以及市場需求力的逐漸增大,變頻技術(shù)在煤礦設(shè)備上也大量引進(jìn)開發(fā),據(jù)統(tǒng)計(jì)其節(jié)能可達(dá)到30%以上在一定的工作環(huán)境下。目前在煤礦刮板機(jī)上傳統(tǒng)控制方式就是使用異步電動(dòng)機(jī)加組合開關(guān)、再利用液力耦合器、減速機(jī)等機(jī)械設(shè)備進(jìn)行平衡和保護(hù);而目前比較常用的是變頻器+變頻電機(jī)進(jìn)行控制,取消液力耦合器,但變頻器和變頻電機(jī)都是獨(dú)立的。而礦井下空間有限,安裝、運(yùn)輸和調(diào)試苦難,這就需要設(shè)計(jì)的設(shè)備箱體在滿足產(chǎn)品性能的前提下體積盡量小,重量盡量輕,功能也盡量全。本文所設(shè)計(jì)研發(fā)的礦用隔爆變頻一體機(jī)是把變頻器和變頻電機(jī)整合在一起,上部是變頻器,底部是針對(duì)變頻器設(shè)計(jì)的變頻電機(jī),去掉了中間傳輸?shù)碾娎|,實(shí)現(xiàn)了性能和尺寸上的合理匹配,同時(shí)提高了設(shè)備可靠性和使用壽命,是目前煤炭設(shè)備市場發(fā)展的趨勢,將對(duì)我國的煤炭設(shè)備發(fā)展具有劃時(shí)代的意義。本論文所研究的是3300V 1200kW變頻一體機(jī)的水冷結(jié)構(gòu)。首先對(duì)煤炭設(shè)備發(fā)展和煤炭市場進(jìn)行了簡要分析,同時(shí)對(duì)隔爆型一體機(jī)的隔爆性能和結(jié)構(gòu)進(jìn)行了介紹,對(duì)所使用的仿真軟件ANSYS及其流體理論體系做了說明;然后闡述了損耗熱量的散熱途徑,以及一體機(jī)的水冷結(jié)構(gòu)方式和熱量產(chǎn)生方式;其次利用傳統(tǒng)計(jì)算方法對(duì)一體機(jī)水冷結(jié)構(gòu)方面的流量和水道長度進(jìn)行了傳統(tǒng)計(jì)算,并與實(shí)際設(shè)計(jì)做了簡要對(duì)比;最后建立了變頻一體機(jī)的水冷結(jié)構(gòu)散熱模型,簡化模型,運(yùn)用仿真軟件ANSYS Workbench中流體動(dòng)力學(xué)分析模塊對(duì)一體機(jī)的變頻部分、電抗箱部分和電機(jī)部分的流體場進(jìn)行了仿真計(jì)算,利用流體場分析結(jié)果得出各水冷區(qū)域的散熱系數(shù),導(dǎo)入各部分溫度場仿真分析中,得出一體機(jī)各部分的溫度分布圖,最終理論仿真計(jì)算與實(shí)驗(yàn)數(shù)據(jù)計(jì)算結(jié)果進(jìn)行對(duì)比,得到的結(jié)果是此水冷結(jié)構(gòu)滿足一體機(jī)散熱要求,設(shè)計(jì)符合要求。
[Abstract]:The environment under the mine is not only damp, but also the air is filled with combustible and explosive gases, such as gas, dust and so on. The products of ordinary structure can not be used; only the general electronic components are placed in a special box that meets the explosion-proof standard.To allow and ensure the proper operation of the equipment.With the rapid development of the national economy, the vigorous promotion of energy-saving technology at home and abroad and the increasing market demand, frequency conversion technology has also been introduced and developed in a large number of coal mine equipment.According to statistics, energy saving can reach more than 30% in a certain working environment.At present, the traditional control method in coal mine scraper is to use asynchronous motor and combination switch, and then use hydraulic coupler, reducer and other mechanical equipment to balance and protect.Remove the hydraulic coupler, but the frequency converter and the frequency conversion motor are independent.Under the mine space is limited, installation, transportation and debugging suffering, which requires the design of the equipment box in the premise of satisfying the performance of the product as small as possible, weight as light as possible, the function as far as possible.The mine flameproof and frequency conversion integrator designed in this paper integrates the inverter and the frequency conversion motor together, the upper part is the frequency converter, the bottom is the frequency conversion motor designed for the frequency converter, and the intermediate transmission cable is removed.It is the development trend of the coal equipment market at present to realize the reasonable matching of the performance and size, and at the same time to improve the reliability and service life of the equipment, which will be of epoch-making significance to the development of the coal equipment in our country.In this paper, the water cooling structure of 3 300 V 1200kW inverter integrated machine is studied.Firstly, the development of coal equipment and coal market are briefly analyzed. At the same time, the flameproof performance and structure of flameproof integrated machine are introduced, and the simulation software ANSYS and its fluid theory system are described.Then the heat dissipation way, the water cooling structure and the heat generation mode of the integrated machine are expounded. Secondly, the flow rate and the length of the waterway in the water cooling structure of the integrated machine are calculated by the traditional calculation method.In the end, the heat dissipation model of water-cooled structure of the integrated inverter is established, the simplified model is simplified, and the frequency conversion part of the integrated machine is analyzed by using the fluid dynamics analysis module in the simulation software ANSYS Workbench.The fluid field of reactance box and motor is simulated and calculated. The heat dissipation coefficient of each water cooling area is obtained by using the results of fluid field analysis, and the temperature distribution diagram of each part of the integrated machine is obtained by introducing it into the simulation analysis of each part temperature field.Finally, the results of theoretical simulation and experimental data are compared. The results show that the water-cooled structure meets the requirements of heat dissipation and the design meets the requirements.
【學(xué)位授予單位】:山東大學(xué)
【學(xué)位級(jí)別】:碩士
【學(xué)位授予年份】:2015
【分類號(hào)】:TD684
【相似文獻(xiàn)】
相關(guān)期刊論文 前10條
1 黃步紅;高菊玲;;變頻器的選用與安裝注意事項(xiàng)[J];廣西輕工業(yè);2008年10期
2 呂世俊;;工業(yè)項(xiàng)目中變頻器的作用、選擇及應(yīng)用[J];黑龍江紡織;2011年04期
3 王進(jìn)峰;;變頻器應(yīng)用中的干擾及其抑制[J];水泥工程;2012年01期
4 薛俠鳴;;臥式釜攪拌調(diào)速變頻器的故障分析及解決方法[J];石油化工技術(shù)與經(jīng)濟(jì);2013年03期
5 張錫春,宋東言,王亦薇;關(guān)于變頻器容量選定的探討[J];聚酯工業(yè);2001年03期
6 王曉軍,張莉,王晨,王雅;變頻器應(yīng)用淺談[J];煤;2002年06期
7 王燕波,付長青,才英華;中小型變頻器的選擇與使用[J];煤礦機(jī)械;2002年04期
8 李華;劉繼梅;房磊;房暉;;變頻器選型中注意負(fù)載匹配及諧波抑制問題[J];山東冶金;2007年S1期
9 王國田;;變頻器運(yùn)行中存在的問題及治理[J];煤礦機(jī)電;2008年05期
10 高巖;王艷青;;變頻器應(yīng)用中的干擾及其抑制[J];有色礦冶;2009年02期
相關(guān)會(huì)議論文 前10條
1 張宗海;;變頻器應(yīng)用中的干擾及其抑制[A];科技創(chuàng)新與產(chǎn)業(yè)發(fā)展(A卷)——第七屆沈陽科學(xué)學(xué)術(shù)年會(huì)暨渾南高新技術(shù)產(chǎn)業(yè)發(fā)展論壇文集[C];2010年
2 董少云;;如何抑制變頻器在應(yīng)用過程中的干擾[A];礦山建設(shè)工程技術(shù)新進(jìn)展——2009全國礦山建設(shè)學(xué)術(shù)會(huì)議文集(下冊(cè))[C];2009年
3 丁紅劍;蘇梅;;變頻器調(diào)試要點(diǎn)[A];山東省煤炭學(xué)會(huì)2006年年會(huì)論文集[C];2006年
4 白志飛;;變頻器在化纖生產(chǎn)線中的應(yīng)用分析[A];第八屆全國電技術(shù)節(jié)能學(xué)術(shù)會(huì)議論文集[C];2006年
5 高偉;武濤;郭淑萍;;變頻器應(yīng)用中的干擾及抑制[A];2007年河北省軋鋼技術(shù)與學(xué)術(shù)年會(huì)論文集(下冊(cè))[C];2007年
6 李國厚;;變頻器應(yīng)用中的干擾及其抑制[A];中國工程建設(shè)標(biāo)準(zhǔn)化協(xié)會(huì)建筑給水排水專業(yè)委員會(huì)、中國土木工程學(xué)會(huì)水工業(yè)分會(huì)建筑給水排水委員會(huì)20周年慶典論文集[C];2007年
7 溫海山;李文;;變頻器應(yīng)用中的干擾及其抑制方法分析[A];河北省冶金學(xué)會(huì)2008年煉鋼連鑄技術(shù)與學(xué)術(shù)交流會(huì)論文集[C];2008年
8 王占奎;;新世紀(jì)話變頻[A];新世紀(jì) 新機(jī)遇 新挑戰(zhàn)——知識(shí)創(chuàng)新和高新技術(shù)產(chǎn)業(yè)發(fā)展(下冊(cè))[C];2001年
9 毛杰;李銳;;變頻器在轉(zhuǎn)爐傾動(dòng)系統(tǒng)中的應(yīng)用及調(diào)試方法[A];中國計(jì)量協(xié)會(huì)冶金分會(huì)2012年會(huì)暨能源計(jì)量與節(jié)能降耗經(jīng)驗(yàn)交流會(huì)論文集[C];2012年
10 史通都;宋濤;楊勁松;;第九水廠應(yīng)用ROBICON變頻器情況介紹[A];中國電工技術(shù)學(xué)會(huì)水工業(yè)電工專委會(huì)第一屆第二次年會(huì)暨技術(shù)交流會(huì)論文集[C];2001年
相關(guān)重要報(bào)紙文章 前1條
1 四川 張世明;變頻器在頻繁正反轉(zhuǎn)運(yùn)行設(shè)備上的使用實(shí)踐[N];電子報(bào);2008年
相關(guān)博士學(xué)位論文 前1條
1 張長勇;單元級(jí)聯(lián)高壓變頻器的數(shù)字化實(shí)現(xiàn)與可靠性研究[D];河北工業(yè)大學(xué);2007年
相關(guān)碩士學(xué)位論文 前8條
1 杜愛娟;礦用隔爆型變頻一體機(jī)水冷結(jié)構(gòu)設(shè)計(jì)及散熱研究[D];山東大學(xué);2015年
2 張金蘭;基于矢量控制的五電平變頻器的研究[D];山東大學(xué);2006年
3 盧杰;交—直—交變頻器的諧波分析與研究[D];西安科技大學(xué);2014年
4 鄧曉彬;變頻器與有源濾波一體化控制器的研究及實(shí)現(xiàn)[D];天津大學(xué);2012年
5 王艷美;變頻器和PLC在傳送帶多種速度控制中的應(yīng)用[D];蘇州大學(xué);2010年
6 丁楊;高功率因數(shù)軟開關(guān)中頻變頻器的研究[D];江南大學(xué);2010年
7 劉寧;單元串聯(lián)型多電平高壓變頻器的研究與設(shè)計(jì)[D];合肥工業(yè)大學(xué);2006年
8 文尚華;起重機(jī)械矢量變頻器應(yīng)用及低頻性能改善[D];電子科技大學(xué);2008年
,本文編號(hào):1728922
本文鏈接:http://sikaile.net/kejilunwen/kuangye/1728922.html