天堂国产午夜亚洲专区-少妇人妻综合久久蜜臀-国产成人户外露出视频在线-国产91传媒一区二区三区

谷家臺鐵礦帷幕注漿及充填采礦技術和圍巖監(jiān)測分析與研究

發(fā)布時間:2018-03-22 11:48

  本文選題:大水礦山 切入點:帷幕注漿 出處:《青島理工大學》2015年碩士論文 論文類型:學位論文


【摘要】:谷家臺鐵礦水文地質條件極其復雜,是國內有名的大水礦山。為實現(xiàn)水下安全采礦,經過多年研究探索和實踐,谷家臺鐵礦應用國內外首創(chuàng)的近礦體頂板灰?guī)r帷幕注漿堵水技術,成功治理了地下水,實現(xiàn)了水下安全采礦,創(chuàng)造了較高的經濟效益和社會效益。本研究系統(tǒng)性地總結了谷家臺鐵礦開采的全過程,即前期治水形成帷幕隔水層——中期采礦方法選擇和應用——后期采空區(qū)頂板穩(wěn)定性研究三大部分,三者之間相輔相成互為依托構成一個完整的體系。筆者結合在該礦十余年來的治水和采礦實踐經驗,分別對治水、采礦和圍巖檢測三部分內容進行了創(chuàng)新性研究,提出了新的觀點并在實踐中加以應用,取得較好效果。第一部分以谷家臺鐵礦注漿堵水和充填采礦現(xiàn)狀為背景,在對地質和水文地質資料匯總分析基礎上,系統(tǒng)整理了目前實施的近礦體頂板灰?guī)r帷幕注漿堵水技術的關鍵步驟和技術指標,并突破常規(guī)注漿堵水思路,通過分析斷層構造機理和導水作用,創(chuàng)造性地提出了治理斷層構造的必要性和治理步驟,將斷層治理鉆孔網度加密至5米×5米,鉆孔深度超出礦體50米以上,同時在采礦設計時將間柱布置在斷層位置保護好斷層,盡量減少采礦對斷層造成的二次破壞。通過鉆探和采掘實踐檢驗,斷層治理效果較好,極大地降低了出水風險。第二部分分析了谷家臺鐵礦選擇下向膠結充填采礦法的原因,既在注漿形成的上盤帷幕下采礦,需要保護好帷幕層,確保采礦過程不能對其造成大的影響破壞,且礦巖穩(wěn)固性較差,綜合比較下向進路膠結充填法采礦是較為適宜的方法。文中在總結下向進路充填采礦法的特點、采場布置、結構參數(shù)、回采步驟、膏體充填等工藝基礎上,重點對充填接頂技術進行了研究改進,提出了多項措施,經實踐接頂率達到90%以上。第三部分是在青島理工大學與萊蕪礦業(yè)有限公司合作開展的基于GPRS的頂板帷幕穩(wěn)定性遠程網絡實時安全監(jiān)測技術研究基礎上,通過對檢測結果分析和數(shù)值模擬計算,得出采空區(qū)圍巖較為穩(wěn)定的結論,從而也驗證了目前采用的近礦體頂板帷幕注漿堵水技術和充填采礦法相關參數(shù)是可靠的。
[Abstract]:The hydrogeological condition of Gujiatai Iron Mine is extremely complex and is a famous mine in China. In order to realize safe mining under water, it has been studied and practiced for many years. Gujiatai Iron Mine has successfully treated groundwater and realized safe mining under water by using the grouting and water plugging technology of limestone curtain near orebody roof, which was first initiated at home and abroad. The whole process of mining Gujiatai Iron Mine is systematically summarized. That is to say, there are three major parts of the study on roof stability of goaf in the early stage of water control and the selection of mining method in the curtain water isolation layer and the application of the roof stability in goaf in the later stage. Based on the experience of water control and mining practice in the past ten years, the author has made innovative research on the three parts of water control, mining and wall rock detection. A new viewpoint is put forward and applied in practice with good results. The first part is based on the present situation of grouting water plugging and filling mining in Gujiatai Iron Mine, and on the basis of collecting and analyzing geological and hydrogeological data. This paper systematically arranges the key steps and technical indexes of grouting water plugging technology for limestone curtain near orebody roof at present, and breaks through the conventional grouting water plugging thinking, and analyzes the fault structure mechanism and water conductivity. This paper creatively puts forward the necessity and steps of controlling fault structure, infill the borehole network of fault control to 5 m 脳 5 m, and the depth of borehole is more than 50 m above the orebody. At the same time, the intercolumn is arranged in the fault position to protect the fault in the mining design. The secondary damage caused by mining to faults is minimized as far as possible. Through drilling and mining practice, the effect of fault treatment is better, and the risk of effluent is greatly reduced. The second part analyzes the reasons for the selection of downward cemented filling mining method in Gujiatai Iron Mine. For mining under the curtain formed by grouting, it is necessary to protect the curtain layer, to ensure that the mining process can not cause great damage to it, and the stability of the ore and rock is poor. This paper summarizes the characteristics, stope layout, structural parameters, recovery steps, paste filling, etc. Emphasis is placed on the research and improvement of filling and connecting technology, and several measures are put forward. The third part is based on the research of the remote network security monitoring technology of roof curtain stability based on GPRS, which is carried out by Qingdao University of Technology and Laiwu Mining Co., Ltd. Based on the analysis of the test results and the numerical simulation, it is concluded that the surrounding rock in the goaf is relatively stable, which also verifies the reliability of the water plugging technology and the relevant parameters of the filling mining method used in the near orebody roof curtain grouting at present.
【學位授予單位】:青島理工大學
【學位級別】:碩士
【學位授予年份】:2015
【分類號】:TD853.34

【相似文獻】

相關期刊論文 前10條

1 陳靜;王軍;;巖溶礦區(qū)帷幕注漿截流效果的抽水試驗法評價[J];采礦技術;2008年06期

2 盧萍;侯克鵬;;帷幕注漿技術在礦山治水中的應用現(xiàn)狀與發(fā)展趨勢[J];現(xiàn)代礦業(yè);2010年03期

3 韓貴雷;于同超;劉殿鳳;蔣鵬飛;賈偉杰;;礦山帷幕注漿方案研究及堵水效果綜合分析[J];礦業(yè)研究與開發(fā);2010年03期

4 王云;;中關鐵礦帷幕注漿工程施工耗時分析[J];現(xiàn)代礦業(yè);2012年03期

5 楊文田;;帷幕注漿恢復淹沒礦井[J];煤炭科學技術;1986年07期

6 黃樹勛 ,梁中民 ,張悅煌;水口山鉛鋅礦鴨公塘礦區(qū)大型帷幕注漿技術的研究[J];長沙礦山研究院季刊;1987年04期

7 容玲聰;運用樣條插值函數(shù)分析計算帷幕注漿的堵水率[J];礦業(yè)研究與開發(fā);1993年S2期

8 容玲聰;運用數(shù)值模擬法評價帷幕注漿效果[J];礦業(yè)研究與開發(fā);1993年S2期

9 白聚波;李現(xiàn)波;楊清蓮;;帷幕注漿技術在大水礦山治水中的應用[J];石家莊鐵道學院學報(自然科學版);2008年01期

10 胡煥校;李振鋼;鐘志均;;帷幕注漿在凡口地區(qū)礦山堵水中的應用[J];工程建設;2009年01期

相關會議論文 前10條

1 殷立軍;;長梁山隧道帷幕注漿施工技術[A];新世紀巖石力學與工程的開拓和發(fā)展——中國巖石力學與工程學會第六次學術大會論文集[C];2000年

2 馬棟;黃立新;;小導管淺孔帷幕注漿施工工法[A];錨固與注漿新技術——第二屆全國巖石錨固與注漿學術會議論文集[C];2002年

3 王福順;;帷幕注漿截流在礦井防治地表水害中的應用[A];第十四屆全國探礦工程(巖土鉆掘工程)學術研討會論文集[C];2007年

4 魏輝;;別巖槽隧道超前帷幕注漿施工技術[A];中國鐵道學會工程地質與路基專業(yè)委員會第21屆年會暨學術交流會論文集[C];2007年

5 徐志鵬;李生生;;帷幕注漿引起地表抬升變形的機理淺析[A];礦山建設工程技術新進展——2008全國礦山建設學術會議文集(上)[C];2008年

6 張東;薛洪松;;袖閥管注漿在隧道近距離穿越樓房中的應用[A];2009中國城市地下空間開發(fā)高峰論壇論文集[C];2009年

7 祝世平;王伏春;曾夏生;;大紅山礦帷幕注漿工程實踐及治水效果[A];金屬礦采礦科學技術前沿論壇論文集[C];2006年

8 辛小毛;王亮;;大水金屬礦山防治水綜合技術方法的研究[A];2009(重慶)中西部第二屆有色金屬工業(yè)發(fā)展論壇論文集[C];2009年

9 蘇景義;盛玉學;李卿占;;帷幕注漿配合井下降水技術在施工中的應用[A];中國煤炭學會成立五十周年系列文集2012年全國礦山建設學術會議?ㄏ拢C];2012年

10 董紅元;陳衛(wèi)東;;長梁山隧道的帷幕注漿及襯砌滲漏水的整治[A];第九屆全國結構工程學術會議論文集第Ⅲ卷[C];2000年

相關重要報紙文章 前8條

1 張秋利邋李遠芳 李濤廣;治理礦區(qū)地質災害又有新途徑[N];中國礦業(yè)報;2008年

2 張秋利 李遠芳 李濤廣;我國治理地質災害有新招[N];中國有色金屬報;2008年

3 張秋利;凡口礦治理地質環(huán)境試驗成效好[N];韶關日報;2009年

4 記者張秋利;凡口礦治理地質環(huán)境試驗得到肯定[N];中國有色金屬報;2009年

5 鄭立云;新型高壓變量注漿泵研制成功[N];中國水利報;2007年

6 通訊員 李濤 趙鋒;喝斷中梁水倒流[N];中華建筑報;2011年

7 特約通訊員 高進忠 本報記者 季炳章;笑在最后卻艱辛[N];中國鐵道建筑報;2000年

8 本報記者 成海忠 通訊員 王啟山;馬棟:自主創(chuàng)新的帶頭人[N];中國鐵道建筑報;2010年

相關碩士學位論文 前3條

1 張勇;谷家臺鐵礦帷幕注漿及充填采礦技術和圍巖監(jiān)測分析與研究[D];青島理工大學;2015年

2 黃陵武;水下隧道全斷面超前帷幕注漿理論及可靠性分析[D];中南大學;2010年

3 陳偉;帷幕注漿法在高速公路沿河路堤沖刷防護中的應用研究[D];西南交通大學;2007年

,

本文編號:1648516

資料下載
論文發(fā)表

本文鏈接:http://sikaile.net/kejilunwen/kuangye/1648516.html


Copyright(c)文論論文網All Rights Reserved | 網站地圖 |

版權申明:資料由用戶daa4c***提供,本站僅收錄摘要或目錄,作者需要刪除請E-mail郵箱bigeng88@qq.com